You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@ignite.apache.org by "Artem Shutak (JIRA)" <ji...@apache.org> on 2015/05/06 18:42:00 UTC

[jira] [Resolved] (IGNITE-867) Configure RAT to not fail builds before test run.

     [ https://issues.apache.org/jira/browse/IGNITE-867?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Artem Shutak resolved IGNITE-867.
---------------------------------
    Resolution: Fixed

> Configure RAT to not fail builds before test run.
> -------------------------------------------------
>
>                 Key: IGNITE-867
>                 URL: https://issues.apache.org/jira/browse/IGNITE-867
>             Project: Ignite
>          Issue Type: Task
>            Reporter: Artem Shutak
>            Assignee: Artem Shutak
>             Fix For: sprint-5
>
>
> If rat fails on TC then we don't get test results and etc.
> Need to get test results, but build have to be red (if rat failed).



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)