You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@hbase.apache.org by "stack (JIRA)" <ji...@apache.org> on 2018/08/04 03:34:00 UTC
[jira] [Reopened] (HBASE-20829) Remove the addFront assertion in
MasterProcedureScheduler.doAdd
[ https://issues.apache.org/jira/browse/HBASE-20829?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
stack reopened HBASE-20829:
---------------------------
Reopen to backport to branch-2.0.2.
> Remove the addFront assertion in MasterProcedureScheduler.doAdd
> ---------------------------------------------------------------
>
> Key: HBASE-20829
> URL: https://issues.apache.org/jira/browse/HBASE-20829
> Project: HBase
> Issue Type: Bug
> Components: Replication
> Reporter: Duo Zhang
> Assignee: Duo Zhang
> Priority: Major
> Fix For: 3.0.0, 2.1.0, 2.0.2, 2.2.0
>
> Attachments: 0001-HBASE-20829-Remove-the-addFront-assertion-in-MasterP.branch-2.0.patch, HBASE-20829-debug.patch, HBASE-20829-v1.patch, HBASE-20829.patch, org.apache.hadoop.hbase.replication.TestSyncReplicationStandbyKillRS-output.txt
>
>
> Timed out.
> {noformat}
> 2018-06-30 01:32:33,823 ERROR [Time-limited test] replication.TestSyncReplicationStandbyKillRS(93): Failed to transit standby cluster to DOWNGRADE_ACTIVE
> {noformat}
> We failed to transit the state to DA and then wait for it to become DA so hang there.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)