You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@geode.apache.org by "Dick Cavender (Jira)" <ji...@apache.org> on 2020/02/04 23:05:00 UTC
[jira] [Resolved] (GEODE-7408) Metrics pipeline is referencing
incorrect image
[ https://issues.apache.org/jira/browse/GEODE-7408?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Dick Cavender resolved GEODE-7408.
----------------------------------
Fix Version/s: 1.11.0
Resolution: Fixed
> Metrics pipeline is referencing incorrect image
> -----------------------------------------------
>
> Key: GEODE-7408
> URL: https://issues.apache.org/jira/browse/GEODE-7408
> Project: Geode
> Issue Type: Bug
> Components: ci
> Reporter: Scott Jewell
> Priority: Major
> Fix For: 1.11.0
>
> Time Spent: 20m
> Remaining Estimate: 0h
>
> The image creation job has been updated to pre-pend the pipeline name
> to the names of the images being created.
>
> The metrics pipeline is still referencing the old name (i.e. metric-tools)
>
> The metrics pipeline yaml should be updated to refer to the new name.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)