You are viewing a plain text version of this content. The canonical link for it is here.
Posted to commits@maven.apache.org by br...@apache.org on 2006/02/08 22:30:14 UTC
svn commit: r376077 -
/maven/site/trunk/src/site/apt/guides/introduction/introduction-to-the-lifecycle.apt
Author: brett
Date: Wed Feb 8 13:30:09 2006
New Revision: 376077
URL: http://svn.apache.org/viewcvs?rev=376077&view=rev
Log:
fix phase names
Modified:
maven/site/trunk/src/site/apt/guides/introduction/introduction-to-the-lifecycle.apt
Modified: maven/site/trunk/src/site/apt/guides/introduction/introduction-to-the-lifecycle.apt
URL: http://svn.apache.org/viewcvs/maven/site/trunk/src/site/apt/guides/introduction/introduction-to-the-lifecycle.apt?rev=376077&r1=376076&r2=376077&view=diff
==============================================================================
--- maven/site/trunk/src/site/apt/guides/introduction/introduction-to-the-lifecycle.apt (original)
+++ maven/site/trunk/src/site/apt/guides/introduction/introduction-to-the-lifecycle.apt Wed Feb 8 13:30:09 2006
@@ -194,11 +194,11 @@
*-------------------------------+--------------------------------------------------------------------------------------+
| <<<package>>> | take the compiled code and package it in its distributable format, such as a JAR.
*-------------------------------+--------------------------------------------------------------------------------------+
-| <<<before-integration-test>>> | perform actions required before integratiob tests are executed. This may involve things such as setting up the required environment.
+| <<<pre-integration-test>>> | perform actions required before integration tests are executed. This may involve things such as setting up the required environment.
*-------------------------------+--------------------------------------------------------------------------------------+
| <<<integration-test>>> | process and deploy the package if necessary into an environment where integration tests can be run.
*-------------------------------+--------------------------------------------------------------------------------------+
-| <<<after-integration-test>>> | perform actions required after integration tests have been executed. This may including cleaning up the environment.
+| <<<post-integration-test>>> | perform actions required after integration tests have been executed. This may including cleaning up the environment.
*-------------------------------+--------------------------------------------------------------------------------------+
| <<<verify>>> | run any checks to verify the package is valid and meets quality criteria.
*-------------------------------+--------------------------------------------------------------------------------------+