You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Zhu Zhu (Jira)" <ji...@apache.org> on 2020/02/20 02:22:00 UTC
[jira] [Updated] (FLINK-16180) Replacing vertexExecution in
ScheduledUnit with executionVertexID
[ https://issues.apache.org/jira/browse/FLINK-16180?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Zhu Zhu updated FLINK-16180:
----------------------------
Parent: FLINK-15626
Issue Type: Sub-task (was: Improvement)
> Replacing vertexExecution in ScheduledUnit with executionVertexID
> -----------------------------------------------------------------
>
> Key: FLINK-16180
> URL: https://issues.apache.org/jira/browse/FLINK-16180
> Project: Flink
> Issue Type: Sub-task
> Components: Runtime / Coordination
> Affects Versions: 1.11.0
> Reporter: Zhu Zhu
> Assignee: Zhu Zhu
> Priority: Major
> Fix For: 1.11.0
>
>
> {{ScheduledUnit#vertexExecution}} is nullable but {{ProgrammedSlotProvider}} requires it to be non-null to work. This makes {{ProgrammedSlotProvider}} not able to be used by new scheduler tests since {{vertexExecution}} is never set in the new scheduler code path. It blocks us from reworking tests which are based legacy scheduling to base on the new scheduler.
> I would propose to replace vertexExecution with a non-null executionVertexID.
> This change would not break anything since {{vertexExecution}} is mainly used by {{ProgrammedSlotProvider}} in tests and logging in production. And the log would be broken if it is null.
> This would also fix a potential bug, as reported in FLINK-16145.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)