You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@ozone.apache.org by "adoroszlai (via GitHub)" <gi...@apache.org> on 2024/01/29 19:20:42 UTC
[PR] HDDS-10233. Apache Release Manager Guide [ozone-site]
adoroszlai opened a new pull request, #66:
URL: https://github.com/apache/ozone-site/pull/66
## What changes were proposed in this pull request?
Port Release Manager Guide from https://cwiki.apache.org/confluence/display/OZONE/Ozone+Release+Guideline
Enable syntax highlighting for bash examples.
https://issues.apache.org/jira/browse/HDDS-10233
## How was this patch tested?
:eyes:
--
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For queries about this service, please contact Infrastructure at:
users@infra.apache.org
---------------------------------------------------------------------
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For additional commands, e-mail: issues-help@ozone.apache.org
Re: [PR] HDDS-10233. Apache Release Manager Guide [ozone-site]
Posted by "errose28 (via GitHub)" <gi...@apache.org>.
errose28 commented on PR #66:
URL: https://github.com/apache/ozone-site/pull/66#issuecomment-1915893095
@symious this is a good question. IMO Confluence should be the standard until the new website is published. By that time we should have the relevant Confluence content ported over to this site and can remove it. For now I think we will want to update this page based on release instructions related to the new site (no Hugo, for example), so these instructions may not exactly match the current process.
--
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For queries about this service, please contact Infrastructure at:
users@infra.apache.org
---------------------------------------------------------------------
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For additional commands, e-mail: issues-help@ozone.apache.org
Re: [PR] HDDS-10233. Apache Release Manager Guide [ozone-site]
Posted by "adoroszlai (via GitHub)" <gi...@apache.org>.
adoroszlai commented on code in PR #66:
URL: https://github.com/apache/ozone-site/pull/66#discussion_r1470779045
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
Review Comment:
This part of the guide is outdated anyway, as a regular Ozone build installs Hugo (under `.dev-tools`) if it's not already available. (HDDS-6512)
--
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For queries about this service, please contact Infrastructure at:
users@infra.apache.org
---------------------------------------------------------------------
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For additional commands, e-mail: issues-help@ozone.apache.org
Re: [PR] HDDS-10233. Apache Release Manager Guide [ozone-site]
Posted by "symious (via GitHub)" <gi...@apache.org>.
symious commented on PR #66:
URL: https://github.com/apache/ozone-site/pull/66#issuecomment-1915879364
@adoroszlai Thank you for working on this.
So, starting from the next time, should the release manager take GitHub as the standard, rather than Confluence?
--
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For queries about this service, please contact Infrastructure at:
users@infra.apache.org
---------------------------------------------------------------------
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For additional commands, e-mail: issues-help@ozone.apache.org
Re: [PR] HDDS-10233. Apache Release Manager Guide [ozone-site]
Posted by "adoroszlai (via GitHub)" <gi...@apache.org>.
adoroszlai commented on code in PR #66:
URL: https://github.com/apache/ozone-site/pull/66#discussion_r1470799412
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
+Before uploading the artifacts, run some basic tests on them, similar to what other devs will run before voting in favor of the release.
+
+ 1. Extract the contents of the source tarball and build it with an empty maven cache by renaming your `~/.m2` directory before doing the build.
+ 2. Check the size of the output binary tarball for significant size increase from the last release.
+ * A significant increase in size could indicate a dependency issue that needs to be fixed.
+ * The Apache svn repo has a size limit for release artifacts. If uploading svn fails because the tarball is too big, we need to contact INFRA to increase our repo size. [See here for details.](https://issues.apache.org/jira/browse/INFRA-23892)
+ 3. Verify signatures
+ * Download the KEYS file from [https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+ * Import its contents (which should include your public gpg key): `gpg --import KEYS`
+ * Verify each .tar.gz artifact: `gpg --verify <artifact>.tar.gz.asc <artifact>.tar.gz`
+ 4. Verify checksums
+ * Run `shasum -a 512 *.tar.gz`
+ * Verify that the output checksums for each artifact match the contents of its .sha512 file and the SHA512 line in its .mds file.
+ 5. Make sure docs are present in the release tarball
+ * There should be a directory called docs in the top level. If there is not, then `hugo` was not installed during the build and it must be re-done.
+ * Extract the release and open docs/index.html in your web browser, and check that the documentation website looks ok.
+ 6. Check the output of running `bin/ozone version` from the extracted release tarball
+ * After extracting the release, the output of this command should contain:
+ * The correct release
+ * The correct national park tag
+ * A non-snapshot version of Ratis.
+ * A link to the apache/ozone GitHub repository (not your fork).
+ * The git hash of the last commit the release was built on.
+ 7. Run the Ozone upgrade acceptance tests by running `test.sh` from the compose/upgrade directory in the extracted release tarball.<br />
+ * This check is also run by the GitHub actions CI for each commit, so it should pass with no surprises.
+
+### Upload the artifacts dev staging area
+
+ * Upload everything from the `$RELEASE_DIR` to the dev staging area.
+
+```bash title="Upload artifacts to staging"
+svn mkdir https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+svn co https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+cp "$RELEASE_DIR"/* "$VERSION-rc$RC"
+cd "$VERSION-rc$RC"
+svn add *
+svn commit -m "Ozone $VERSION RC$RC"
+```
+
+ * Check the results using your browser by connecting to [https://dist.apache.org/repos/dist/dev/ozone/](https://dist.apache.org/repos/dist/dev/ozone/)
+### Upload the artifacts to the apache nexus
+
+Double check if your apache credentials are added to your local ~/.m2/settings.xml
+
+```xml
+<settings>
+ <servers>
+ <server>
+ <id>apache.snapshots.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ <!-- To stage a release of some part of Maven -->
+ <server>
+ <id>apache.staging.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ </servers>
+</settings>
+```
+
+Return to your Ozone repository being used for the release, and run the following command:
+
+```bash title="Upload Release Artifacts"
+mvn deploy -Psign -pl '!:ozone-dist' -DskipTests -Dbuildhelper.skipAttach
+```
+
+Go to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories) and **close** the newly created orgapacheozone repository.
+
+### Push the release candidate tag to github
+
+```bash title="Push the tag"
+git push origin "ozone-$VERSION-RC$RC"
+```
+
+## Vote
+
+### Send the voting mail to below mailing list
+
+dev@ozone <dev@ozone.apache.org>
+Include the following items in the email:
+
+ * Link to the release candidate tag on Github
+ * Link to a Jira query showing all resolved issues for this release. Something like [this](https://issues.apache.org/jira/issues/?jql=project%20%3D%20HDDS%20AND%20status%20in%20(Resolved%2C%20Closed)%20AND%20fixVersion%20%3D%201.4.0).
+ * Location of the source and binary tarballs. This link will look something like [https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/](https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/)
+ * Location where the maven artifacts are staged. This link will look something like [https://repository.apache.org/content/repositories/orgapacheozone-1001/](https://repository.apache.org/content/repositories/orgapacheozone-1001/)
+ * Link to the public key used to sign the artifacts. This should always be in the KEYS file and you can just link to that: [https://dist.apache.org/repos/dist/dev/ozone/KEYS](https://dist.apache.org/repos/dist/dev/ozone/KEYS)
+ * Fingerprint of the key used to sign the artifacts.
+
+If no issues are found with the artifacts, let the vote run for 7 days. Review [https://www.apache.org/legal/release-policy.html#release-approval](https://www.apache.org/legal/release-policy.html#release-approval) for the ASF wide release voting policy. Note what is required of binding voters, and that binding votes can only come from PMC members. Sometimes responders will not specify whether or not their vote is binding. If in doubt check [https://people.apache.org/committer-index.htm](https://people.apache.org/committer-index.html)l. Users whose group membership includes ozone-pmc can cast binding votes.
+
+Once voting is finished, send an email summarizing the results (binding +1s, non-binding +1s, -1s, 0s) and, if the vote passed, indicate that the release artifacts will be published. If an issue is found with the artifacts, apply fixes to the release branch and repeat the steps starting from **tagging the commit for the release candidate** with the $RC variable incremented by 1 for all steps.
+
+## After-Vote
+
+### Publish the artifacts
+
+You should commit the artifacts to the SVN repository. If you are not a PMC member you can commit it to the dev zone first and ask a PMC for the final move.
+
+Checkout the svn folder &commit the artifacts to a new directory.
+
+```
+svn checkout https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+svn mkdir "$VERSION"
+cp "$RELEASE_DIR"/* "$VERSION"/
+svn add "$VERSION"/*
+svn commit -m "Added ozone-$VERSION directory"
+```
+
+PMC members can move it to the final location:
+
+```
+svn mv -m "commit msg" https://dist.apache.org/repos/dist/dev/ozone/"$VERSION" https://dist.apache.org/repos/dist/release/ozone/"$VERSION"
+```
+
+To publish the artifacts to the central maven, login to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories)[,](https://repository.apache.org,) select your **staging** repository and **release** it.
+
+### Write a haiku
+
+Check the tag from the [Ozone Roadmap](https://cwiki.apache.org/confluence/display/OZONE/Ozone+Roadmap) page (it's a national park).
+Find a photo which is under the CC license.
+Write a haiku to the photo with Future font.
+
+### Update the ozone website
+
+ * Create release notes and add them to the Ozone website with your haiku image. An example pull request showing how to do this is [here](https://github.com/apache/ozone-site/pull/17). Note that the target branch is `master`.
+ * Extract the docs folder from the release tarball, and add its contents to the website. An example pull request for this is [here](https://github.com/apache/ozone-site/pull/18). Note that the target branch is `asf-site` , and that the docs/current symlink has been updated to point to the latest release's directory.
+ * Test the website locally by running `hugo serve` from the repository root with the master branch checked out. Check that links for the new release are working. Links to the documentation will not work until the PR to the `asf-site` branch is merged.
+
+### Add the final git tag and push it
+
+```bash title="Add final release tag"
+git checkout "ozone-$VERSION-RC$RC"
+git tag -s "ozone-$VERSION" -m "Ozone $VERSION release"
+git push origin "ozone-$VERSION"
+```
+
+### Update the master branch
+
+ * Cherry pick your commit updating the protolock files to a branch on your fork, and merge it to master with a pull request.
+ * Update the Ozone SNAPSHOT version and national park tag on master with a pull request. Here you will pick the [national park](https://en.wikipedia.org/wiki/List_of_national_parks_of_the_United_States) to use for the next release of Ozone and set it in the project's top level pom at <ozone.release>. [Example](https://github.com/apache/ozone/pull/2863)
+
+### Update the Ozone Roadmap
+
+ * Update the [Ozone Roadmap](https://cwiki.apache.org/confluence/display/OZONE/Ozone+Roadmap) so that the release notes for the just completed release are correct.
+ * Move its row to the `Past Releases` section.
+ * Create a row for the next release in the `Upcoming Releases` section, and add planned features that you are aware of.
+
+### Write an announcement mail to the Ozone mailing lists
+
+Include the following links:
+
+ * Release notes: [https://ozone.apache.org/release/1.2.0/](https://ozone.apache.org/release/1.2.0/). Replace the version in the URL with the version being released.
+ * Download link: [https://ozone.apache.org/downloads/](https://ozone.apache.org/downloads/)
+ * Link to versioned documentation: [https://ozone.apache.org/docs/](https://ozone.apache.org/docs/)
+
+### Publish a docker image for the release
+
+The Ozone docker image is intended for testing purposes only, not production use. Therefore, it is ok to update this after announcing the release. An example pull request to update the docker image is [here](https://github.com/apache/ozone-docker/pull/22/files). The target branch for your pull request should be `latest`. After the pull request is merged, it can be published to docker hub by fast-forwarding the `ozone-latest` branch to match the `latest` branch. Also, create a new branch named like `ozone-1.5.0` (replace the version) and push it to [GitHub](https://github.com/apache/ozone-docker).
+
+```bash
+git checkout ozone-latest
+git pull
+git merge --ff-only origin/latest
+git checkout -b "ozone-$VERSION"
+git push origin ozone-latest "ozone-$VERSION"
+```
+
+## Patch Release
+
+If there is a security vulnerability or critical bug uncovered in a major or minor Ozone release, a patch release may be necessary to fix this. The process is a bit simpler than a major or minor release, since there is already a solid foundation on the release's maintenance branch.
+
+ 1. Cherry pick the fix(es) on to the maintenance branch. For example, for Ozone's 1.2.0 release, this is the branch called ozone-1.2.
+ 2. Run all steps from the sections **Update the versions** through **Publish a docker image for the release**, with the following modifications:
+ * Do not update the protolock files unless protocol buffers were changed as part of the fix.
+ * When updating the website, all instances of the original major/minor release should be replaced with this patch version, since we do not want users downloading the original release anymore.
+ * For example, any website text referring to 1.2.0 should be changed to refer to 1.2.1.
+ * Continuing the 1.2.0 → 1.2.1 example, the release/1.2.0 page should redirect to release/1.2.1.
+ * An example pull request to do this is [here](https://github.com/apache/ozone-site/pull/23).
+ * The docs can be added to the website normally as described above in **Update the ozone website**. The docs link for the original major/minor release can remain alongside the docs link for the patch release.
+
+In the event of a critical security vulnerability or seriously harmful bug with a small set of changes in the patch, PMC members may vote to forgo the usual 72 hour minimum time for a release vote and publish once there are enough binding +1s.
+
+Remove the previous patch release from Apache distribution site:
Review Comment:
Making this part of the ordered list is fine, but I think we should keep the word "patch", or somehow emphasize that this applies to the same minor version release line, not just any previous release.
--
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For queries about this service, please contact Infrastructure at:
users@infra.apache.org
---------------------------------------------------------------------
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For additional commands, e-mail: issues-help@ozone.apache.org
Re: [PR] HDDS-10233. Apache Release Manager Guide [ozone-site]
Posted by "adoroszlai (via GitHub)" <gi...@apache.org>.
adoroszlai commented on PR #66:
URL: https://github.com/apache/ozone-site/pull/66#issuecomment-1916360704
I have applied (most) suggested changes to avoid having to duplicate review effort in follow-up PRs. Also made a couple of trivial formatting tweaks.
Review items with more generic ideas (e.g. using Title Case, rearranging/combining parts, or completely revamping sections) I still would like to address in follow-up PR.
--
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For queries about this service, please contact Infrastructure at:
users@infra.apache.org
---------------------------------------------------------------------
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For additional commands, e-mail: issues-help@ozone.apache.org
Re: [PR] HDDS-10233. Apache Release Manager Guide [ozone-site]
Posted by "errose28 (via GitHub)" <gi...@apache.org>.
errose28 commented on PR #66:
URL: https://github.com/apache/ozone-site/pull/66#issuecomment-1919743556
Yeah I checked last night and also did not see the new content deployed but it looks good now. Maybe some slowdown in processing on the ASF infra side. In that past it had been published about a minute after merging.
--
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For queries about this service, please contact Infrastructure at:
users@infra.apache.org
---------------------------------------------------------------------
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For additional commands, e-mail: issues-help@ozone.apache.org
Re: [PR] HDDS-10233. Apache Release Manager Guide [ozone-site]
Posted by "symious (via GitHub)" <gi...@apache.org>.
symious commented on code in PR #66:
URL: https://github.com/apache/ozone-site/pull/66#discussion_r1470493507
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
+Before uploading the artifacts, run some basic tests on them, similar to what other devs will run before voting in favor of the release.
+
+ 1. Extract the contents of the source tarball and build it with an empty maven cache by renaming your `~/.m2` directory before doing the build.
+ 2. Check the size of the output binary tarball for significant size increase from the last release.
+ * A significant increase in size could indicate a dependency issue that needs to be fixed.
+ * The Apache svn repo has a size limit for release artifacts. If uploading svn fails because the tarball is too big, we need to contact INFRA to increase our repo size. [See here for details.](https://issues.apache.org/jira/browse/INFRA-23892)
+ 3. Verify signatures
+ * Download the KEYS file from [https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+ * Import its contents (which should include your public gpg key): `gpg --import KEYS`
+ * Verify each .tar.gz artifact: `gpg --verify <artifact>.tar.gz.asc <artifact>.tar.gz`
+ 4. Verify checksums
+ * Run `shasum -a 512 *.tar.gz`
+ * Verify that the output checksums for each artifact match the contents of its .sha512 file and the SHA512 line in its .mds file.
+ 5. Make sure docs are present in the release tarball
+ * There should be a directory called docs in the top level. If there is not, then `hugo` was not installed during the build and it must be re-done.
+ * Extract the release and open docs/index.html in your web browser, and check that the documentation website looks ok.
+ 6. Check the output of running `bin/ozone version` from the extracted release tarball
+ * After extracting the release, the output of this command should contain:
+ * The correct release
+ * The correct national park tag
+ * A non-snapshot version of Ratis.
+ * A link to the apache/ozone GitHub repository (not your fork).
+ * The git hash of the last commit the release was built on.
+ 7. Run the Ozone upgrade acceptance tests by running `test.sh` from the compose/upgrade directory in the extracted release tarball.<br />
+ * This check is also run by the GitHub actions CI for each commit, so it should pass with no surprises.
+
+### Upload the artifacts dev staging area
+
+ * Upload everything from the `$RELEASE_DIR` to the dev staging area.
+
+```bash title="Upload artifacts to staging"
+svn mkdir https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+svn co https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+cp "$RELEASE_DIR"/* "$VERSION-rc$RC"
+cd "$VERSION-rc$RC"
+svn add *
+svn commit -m "Ozone $VERSION RC$RC"
+```
+
+ * Check the results using your browser by connecting to [https://dist.apache.org/repos/dist/dev/ozone/](https://dist.apache.org/repos/dist/dev/ozone/)
+### Upload the artifacts to the apache nexus
+
+Double check if your apache credentials are added to your local ~/.m2/settings.xml
+
+```xml
+<settings>
+ <servers>
+ <server>
+ <id>apache.snapshots.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ <!-- To stage a release of some part of Maven -->
+ <server>
+ <id>apache.staging.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ </servers>
+</settings>
+```
+
+Return to your Ozone repository being used for the release, and run the following command:
+
+```bash title="Upload Release Artifacts"
+mvn deploy -Psign -pl '!:ozone-dist' -DskipTests -Dbuildhelper.skipAttach
+```
+
+Go to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories) and **close** the newly created orgapacheozone repository.
+
+### Push the release candidate tag to github
+
+```bash title="Push the tag"
+git push origin "ozone-$VERSION-RC$RC"
+```
+
+## Vote
+
+### Send the voting mail to below mailing list
+
+dev@ozone <dev@ozone.apache.org>
+Include the following items in the email:
+
+ * Link to the release candidate tag on Github
+ * Link to a Jira query showing all resolved issues for this release. Something like [this](https://issues.apache.org/jira/issues/?jql=project%20%3D%20HDDS%20AND%20status%20in%20(Resolved%2C%20Closed)%20AND%20fixVersion%20%3D%201.4.0).
+ * Location of the source and binary tarballs. This link will look something like [https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/](https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/)
+ * Location where the maven artifacts are staged. This link will look something like [https://repository.apache.org/content/repositories/orgapacheozone-1001/](https://repository.apache.org/content/repositories/orgapacheozone-1001/)
+ * Link to the public key used to sign the artifacts. This should always be in the KEYS file and you can just link to that: [https://dist.apache.org/repos/dist/dev/ozone/KEYS](https://dist.apache.org/repos/dist/dev/ozone/KEYS)
+ * Fingerprint of the key used to sign the artifacts.
+
+If no issues are found with the artifacts, let the vote run for 7 days. Review [https://www.apache.org/legal/release-policy.html#release-approval](https://www.apache.org/legal/release-policy.html#release-approval) for the ASF wide release voting policy. Note what is required of binding voters, and that binding votes can only come from PMC members. Sometimes responders will not specify whether or not their vote is binding. If in doubt check [https://people.apache.org/committer-index.htm](https://people.apache.org/committer-index.html)l. Users whose group membership includes ozone-pmc can cast binding votes.
+
+Once voting is finished, send an email summarizing the results (binding +1s, non-binding +1s, -1s, 0s) and, if the vote passed, indicate that the release artifacts will be published. If an issue is found with the artifacts, apply fixes to the release branch and repeat the steps starting from **tagging the commit for the release candidate** with the $RC variable incremented by 1 for all steps.
+
+## After-Vote
+
+### Publish the artifacts
+
+You should commit the artifacts to the SVN repository. If you are not a PMC member you can commit it to the dev zone first and ask a PMC for the final move.
+
+Checkout the svn folder &commit the artifacts to a new directory.
+
+```
+svn checkout https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+svn mkdir "$VERSION"
+cp "$RELEASE_DIR"/* "$VERSION"/
+svn add "$VERSION"/*
+svn commit -m "Added ozone-$VERSION directory"
+```
+
+PMC members can move it to the final location:
+
+```
+svn mv -m "commit msg" https://dist.apache.org/repos/dist/dev/ozone/"$VERSION" https://dist.apache.org/repos/dist/release/ozone/"$VERSION"
+```
+
+To publish the artifacts to the central maven, login to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories)[,](https://repository.apache.org,) select your **staging** repository and **release** it.
+
+### Write a haiku
+
+Check the tag from the [Ozone Roadmap](https://cwiki.apache.org/confluence/display/OZONE/Ozone+Roadmap) page (it's a national park).
+Find a photo which is under the CC license.
+Write a haiku to the photo with Future font.
+
+### Update the ozone website
+
+ * Create release notes and add them to the Ozone website with your haiku image. An example pull request showing how to do this is [here](https://github.com/apache/ozone-site/pull/17). Note that the target branch is `master`.
+ * Extract the docs folder from the release tarball, and add its contents to the website. An example pull request for this is [here](https://github.com/apache/ozone-site/pull/18). Note that the target branch is `asf-site` , and that the docs/current symlink has been updated to point to the latest release's directory.
+ * Test the website locally by running `hugo serve` from the repository root with the master branch checked out. Check that links for the new release are working. Links to the documentation will not work until the PR to the `asf-site` branch is merged.
+
+### Add the final git tag and push it
+
+```bash title="Add final release tag"
+git checkout "ozone-$VERSION-RC$RC"
+git tag -s "ozone-$VERSION" -m "Ozone $VERSION release"
+git push origin "ozone-$VERSION"
+```
+
+### Update the master branch
+
+ * Cherry pick your commit updating the protolock files to a branch on your fork, and merge it to master with a pull request.
+ * Update the Ozone SNAPSHOT version and national park tag on master with a pull request. Here you will pick the [national park](https://en.wikipedia.org/wiki/List_of_national_parks_of_the_United_States) to use for the next release of Ozone and set it in the project's top level pom at <ozone.release>. [Example](https://github.com/apache/ozone/pull/2863)
Review Comment:
For the update of Ozone Snapshot version, the original recipe is to cut branch first, process the release, which might take about one month, then update the snapshot version. Then the commits between release-branch and snpashot version in that month seems becoming orphan.
And in release 1.4.0, I did update the snapshot version first, and then cut the branch based on the last commit of the snpashot version, which seems better for the orphan commits.
--
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For queries about this service, please contact Infrastructure at:
users@infra.apache.org
---------------------------------------------------------------------
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For additional commands, e-mail: issues-help@ozone.apache.org
Re: [PR] HDDS-10233. Apache Release Manager Guide [ozone-site]
Posted by "errose28 (via GitHub)" <gi...@apache.org>.
errose28 commented on code in PR #66:
URL: https://github.com/apache/ozone-site/pull/66#discussion_r1470303415
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
Review Comment:
```suggestion
export CODESIGNINGKEY=<your_gpg_key_id>
gpg --list-sigs $CODESIGNINGKEY >> KEYS
gpg --armor --export $CODESIGNINGKEY >> KEYS
svn commit -m "ozone: adding key of <your_name> to the KEYS"
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
Review Comment:
I think the code block titles are a nice addition, but may be redundant or uninformative in some places like this one and others below.
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
Review Comment:
```suggestion
This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by `git config user.email` matches the email for the key you want to use shown by `gpg --list-secret-keys`.
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
Review Comment:
I think this is what the original page means by "scripted", but we can clarify it here.
```suggestion
This document describes the process to release Apache Ozone. The process is not yet automated, and the documentation is **a work in progress**.
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
+Before uploading the artifacts, run some basic tests on them, similar to what other devs will run before voting in favor of the release.
+
+ 1. Extract the contents of the source tarball and build it with an empty maven cache by renaming your `~/.m2` directory before doing the build.
+ 2. Check the size of the output binary tarball for significant size increase from the last release.
+ * A significant increase in size could indicate a dependency issue that needs to be fixed.
+ * The Apache svn repo has a size limit for release artifacts. If uploading svn fails because the tarball is too big, we need to contact INFRA to increase our repo size. [See here for details.](https://issues.apache.org/jira/browse/INFRA-23892)
+ 3. Verify signatures
+ * Download the KEYS file from [https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+ * Import its contents (which should include your public gpg key): `gpg --import KEYS`
+ * Verify each .tar.gz artifact: `gpg --verify <artifact>.tar.gz.asc <artifact>.tar.gz`
+ 4. Verify checksums
+ * Run `shasum -a 512 *.tar.gz`
+ * Verify that the output checksums for each artifact match the contents of its .sha512 file and the SHA512 line in its .mds file.
+ 5. Make sure docs are present in the release tarball
+ * There should be a directory called docs in the top level. If there is not, then `hugo` was not installed during the build and it must be re-done.
+ * Extract the release and open docs/index.html in your web browser, and check that the documentation website looks ok.
+ 6. Check the output of running `bin/ozone version` from the extracted release tarball
+ * After extracting the release, the output of this command should contain:
+ * The correct release
+ * The correct national park tag
+ * A non-snapshot version of Ratis.
+ * A link to the apache/ozone GitHub repository (not your fork).
+ * The git hash of the last commit the release was built on.
+ 7. Run the Ozone upgrade acceptance tests by running `test.sh` from the compose/upgrade directory in the extracted release tarball.<br />
+ * This check is also run by the GitHub actions CI for each commit, so it should pass with no surprises.
+
+### Upload the artifacts dev staging area
+
+ * Upload everything from the `$RELEASE_DIR` to the dev staging area.
+
+```bash title="Upload artifacts to staging"
+svn mkdir https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+svn co https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+cp "$RELEASE_DIR"/* "$VERSION-rc$RC"
+cd "$VERSION-rc$RC"
+svn add *
+svn commit -m "Ozone $VERSION RC$RC"
+```
+
+ * Check the results using your browser by connecting to [https://dist.apache.org/repos/dist/dev/ozone/](https://dist.apache.org/repos/dist/dev/ozone/)
+### Upload the artifacts to the apache nexus
+
+Double check if your apache credentials are added to your local ~/.m2/settings.xml
+
+```xml
+<settings>
+ <servers>
+ <server>
+ <id>apache.snapshots.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ <!-- To stage a release of some part of Maven -->
+ <server>
+ <id>apache.staging.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ </servers>
+</settings>
+```
+
+Return to your Ozone repository being used for the release, and run the following command:
+
+```bash title="Upload Release Artifacts"
+mvn deploy -Psign -pl '!:ozone-dist' -DskipTests -Dbuildhelper.skipAttach
+```
+
+Go to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories) and **close** the newly created orgapacheozone repository.
+
+### Push the release candidate tag to github
+
+```bash title="Push the tag"
+git push origin "ozone-$VERSION-RC$RC"
+```
+
+## Vote
+
+### Send the voting mail to below mailing list
+
+dev@ozone <dev@ozone.apache.org>
+Include the following items in the email:
+
+ * Link to the release candidate tag on Github
+ * Link to a Jira query showing all resolved issues for this release. Something like [this](https://issues.apache.org/jira/issues/?jql=project%20%3D%20HDDS%20AND%20status%20in%20(Resolved%2C%20Closed)%20AND%20fixVersion%20%3D%201.4.0).
+ * Location of the source and binary tarballs. This link will look something like [https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/](https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/)
+ * Location where the maven artifacts are staged. This link will look something like [https://repository.apache.org/content/repositories/orgapacheozone-1001/](https://repository.apache.org/content/repositories/orgapacheozone-1001/)
+ * Link to the public key used to sign the artifacts. This should always be in the KEYS file and you can just link to that: [https://dist.apache.org/repos/dist/dev/ozone/KEYS](https://dist.apache.org/repos/dist/dev/ozone/KEYS)
+ * Fingerprint of the key used to sign the artifacts.
+
+If no issues are found with the artifacts, let the vote run for 7 days. Review [https://www.apache.org/legal/release-policy.html#release-approval](https://www.apache.org/legal/release-policy.html#release-approval) for the ASF wide release voting policy. Note what is required of binding voters, and that binding votes can only come from PMC members. Sometimes responders will not specify whether or not their vote is binding. If in doubt check [https://people.apache.org/committer-index.htm](https://people.apache.org/committer-index.html)l. Users whose group membership includes ozone-pmc can cast binding votes.
+
+Once voting is finished, send an email summarizing the results (binding +1s, non-binding +1s, -1s, 0s) and, if the vote passed, indicate that the release artifacts will be published. If an issue is found with the artifacts, apply fixes to the release branch and repeat the steps starting from **tagging the commit for the release candidate** with the $RC variable incremented by 1 for all steps.
+
+## After-Vote
+
+### Publish the artifacts
+
+You should commit the artifacts to the SVN repository. If you are not a PMC member you can commit it to the dev zone first and ask a PMC for the final move.
+
+Checkout the svn folder &commit the artifacts to a new directory.
+
+```
+svn checkout https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+svn mkdir "$VERSION"
+cp "$RELEASE_DIR"/* "$VERSION"/
+svn add "$VERSION"/*
+svn commit -m "Added ozone-$VERSION directory"
+```
+
+PMC members can move it to the final location:
+
+```
+svn mv -m "commit msg" https://dist.apache.org/repos/dist/dev/ozone/"$VERSION" https://dist.apache.org/repos/dist/release/ozone/"$VERSION"
+```
+
+To publish the artifacts to the central maven, login to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories)[,](https://repository.apache.org,) select your **staging** repository and **release** it.
+
+### Write a haiku
+
+Check the tag from the [Ozone Roadmap](https://cwiki.apache.org/confluence/display/OZONE/Ozone+Roadmap) page (it's a national park).
+Find a photo which is under the CC license.
+Write a haiku to the photo with Future font.
+
+### Update the ozone website
+
+ * Create release notes and add them to the Ozone website with your haiku image. An example pull request showing how to do this is [here](https://github.com/apache/ozone-site/pull/17). Note that the target branch is `master`.
+ * Extract the docs folder from the release tarball, and add its contents to the website. An example pull request for this is [here](https://github.com/apache/ozone-site/pull/18). Note that the target branch is `asf-site` , and that the docs/current symlink has been updated to point to the latest release's directory.
+ * Test the website locally by running `hugo serve` from the repository root with the master branch checked out. Check that links for the new release are working. Links to the documentation will not work until the PR to the `asf-site` branch is merged.
+
+### Add the final git tag and push it
+
+```bash title="Add final release tag"
+git checkout "ozone-$VERSION-RC$RC"
+git tag -s "ozone-$VERSION" -m "Ozone $VERSION release"
+git push origin "ozone-$VERSION"
+```
+
+### Update the master branch
+
+ * Cherry pick your commit updating the protolock files to a branch on your fork, and merge it to master with a pull request.
+ * Update the Ozone SNAPSHOT version and national park tag on master with a pull request. Here you will pick the [national park](https://en.wikipedia.org/wiki/List_of_national_parks_of_the_United_States) to use for the next release of Ozone and set it in the project's top level pom at <ozone.release>. [Example](https://github.com/apache/ozone/pull/2863)
+
+### Update the Ozone Roadmap
+
+ * Update the [Ozone Roadmap](https://cwiki.apache.org/confluence/display/OZONE/Ozone+Roadmap) so that the release notes for the just completed release are correct.
+ * Move its row to the `Past Releases` section.
+ * Create a row for the next release in the `Upcoming Releases` section, and add planned features that you are aware of.
+
+### Write an announcement mail to the Ozone mailing lists
+
+Include the following links:
+
+ * Release notes: [https://ozone.apache.org/release/1.2.0/](https://ozone.apache.org/release/1.2.0/). Replace the version in the URL with the version being released.
+ * Download link: [https://ozone.apache.org/downloads/](https://ozone.apache.org/downloads/)
+ * Link to versioned documentation: [https://ozone.apache.org/docs/](https://ozone.apache.org/docs/)
+
+### Publish a docker image for the release
+
+The Ozone docker image is intended for testing purposes only, not production use. Therefore, it is ok to update this after announcing the release. An example pull request to update the docker image is [here](https://github.com/apache/ozone-docker/pull/22/files). The target branch for your pull request should be `latest`. After the pull request is merged, it can be published to docker hub by fast-forwarding the `ozone-latest` branch to match the `latest` branch. Also, create a new branch named like `ozone-1.5.0` (replace the version) and push it to [GitHub](https://github.com/apache/ozone-docker).
Review Comment:
```suggestion
The Ozone docker image is intended for testing purposes only, not production use. Therefore, it is ok to update this after announcing the release. An example pull request to update the docker image is [here](https://github.com/apache/ozone-docker/pull/22/files). The target branch for your pull request should be `latest`. After the pull request is merged, it can be published to [Docker Hub](https://hub.docker.com/r/apache/ozone) by updating the branches that correspond to [docker image tags](https://hub.docker.com/r/apache/ozone/tags).
1. Publish the image with the `latest` tag by fast-forwarding the `ozone-latest` branch to match the `latest` branch.
2. Publish the image with a version specific tag by creating a new branch with a name like `ozone-1.5.0` (replace this with the current version) from the `latest` branch and push it to [GitHub](https://github.com/apache/ozone-docker).
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
Review Comment:
I'm not sure we still need the WIP disclaimer at the top. I think the release manager docs are pretty thorough at this point.
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
Review Comment:
```suggestion
The release manager's GPG key is supposed to be published together with the release. Please append it to the end of the [KEYS file](https://dist.apache.org/repos/dist/release/ozone/KEYS) if it is not already present by using SVN.
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
Review Comment:
nit. I think we should use `Title Case` for page headers. We probably want to standardize this across the site. I can make a note to look into this as part of the CI checks in HDDS-9866.
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
+Before uploading the artifacts, run some basic tests on them, similar to what other devs will run before voting in favor of the release.
+
+ 1. Extract the contents of the source tarball and build it with an empty maven cache by renaming your `~/.m2` directory before doing the build.
+ 2. Check the size of the output binary tarball for significant size increase from the last release.
+ * A significant increase in size could indicate a dependency issue that needs to be fixed.
+ * The Apache svn repo has a size limit for release artifacts. If uploading svn fails because the tarball is too big, we need to contact INFRA to increase our repo size. [See here for details.](https://issues.apache.org/jira/browse/INFRA-23892)
+ 3. Verify signatures
+ * Download the KEYS file from [https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+ * Import its contents (which should include your public gpg key): `gpg --import KEYS`
+ * Verify each .tar.gz artifact: `gpg --verify <artifact>.tar.gz.asc <artifact>.tar.gz`
Review Comment:
Also here the `<` and `>` conversion did not come through.
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
+Before uploading the artifacts, run some basic tests on them, similar to what other devs will run before voting in favor of the release.
+
+ 1. Extract the contents of the source tarball and build it with an empty maven cache by renaming your `~/.m2` directory before doing the build.
+ 2. Check the size of the output binary tarball for significant size increase from the last release.
+ * A significant increase in size could indicate a dependency issue that needs to be fixed.
+ * The Apache svn repo has a size limit for release artifacts. If uploading svn fails because the tarball is too big, we need to contact INFRA to increase our repo size. [See here for details.](https://issues.apache.org/jira/browse/INFRA-23892)
+ 3. Verify signatures
+ * Download the KEYS file from [https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+ * Import its contents (which should include your public gpg key): `gpg --import KEYS`
+ * Verify each .tar.gz artifact: `gpg --verify <artifact>.tar.gz.asc <artifact>.tar.gz`
+ 4. Verify checksums
+ * Run `shasum -a 512 *.tar.gz`
+ * Verify that the output checksums for each artifact match the contents of its .sha512 file and the SHA512 line in its .mds file.
+ 5. Make sure docs are present in the release tarball
+ * There should be a directory called docs in the top level. If there is not, then `hugo` was not installed during the build and it must be re-done.
+ * Extract the release and open docs/index.html in your web browser, and check that the documentation website looks ok.
+ 6. Check the output of running `bin/ozone version` from the extracted release tarball
+ * After extracting the release, the output of this command should contain:
+ * The correct release
+ * The correct national park tag
+ * A non-snapshot version of Ratis.
+ * A link to the apache/ozone GitHub repository (not your fork).
+ * The git hash of the last commit the release was built on.
+ 7. Run the Ozone upgrade acceptance tests by running `test.sh` from the compose/upgrade directory in the extracted release tarball.<br />
+ * This check is also run by the GitHub actions CI for each commit, so it should pass with no surprises.
+
+### Upload the artifacts dev staging area
+
+ * Upload everything from the `$RELEASE_DIR` to the dev staging area.
+
+```bash title="Upload artifacts to staging"
+svn mkdir https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+svn co https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+cp "$RELEASE_DIR"/* "$VERSION-rc$RC"
+cd "$VERSION-rc$RC"
+svn add *
+svn commit -m "Ozone $VERSION RC$RC"
+```
+
+ * Check the results using your browser by connecting to [https://dist.apache.org/repos/dist/dev/ozone/](https://dist.apache.org/repos/dist/dev/ozone/)
+### Upload the artifacts to the apache nexus
+
+Double check if your apache credentials are added to your local ~/.m2/settings.xml
+
+```xml
+<settings>
+ <servers>
+ <server>
+ <id>apache.snapshots.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ <!-- To stage a release of some part of Maven -->
+ <server>
+ <id>apache.staging.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ </servers>
+</settings>
+```
+
+Return to your Ozone repository being used for the release, and run the following command:
+
+```bash title="Upload Release Artifacts"
+mvn deploy -Psign -pl '!:ozone-dist' -DskipTests -Dbuildhelper.skipAttach
+```
+
+Go to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories) and **close** the newly created orgapacheozone repository.
Review Comment:
```suggestion
Go to https://repository.apache.org/#stagingRepositories and **close** the newly created `orgapacheozone` repository.
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
Review Comment:
```suggestion
Use the commands below or your IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
Review Comment:
```suggestion
It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the git remote for the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
Review Comment:
```suggestion
Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called `proto.lock` are being committed, and that the changes to the files makes sense based on new features added in this release.
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
Review Comment:
I think we can get rid of this heading as this command is still under the version update. Other sections have the commit step contained in them which makes the mini-map more concise.
```suggestion
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
Review Comment:
Since this release guide is being committed to the new website, should we update the steps about doc and release notes updates to reflect the new process that will exist after the new site is published? For example, docs will live in a separate repo (populating the docs link for Web UIs is still TBD), the roadmap and downloads pages are on the new website, and I think we are planning on keeping more formal looking release notes without poems and images.
We could update those instructions in this PR, or do it in a follow up that just needs to be completed before the site is published.
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
Review Comment:
Looks like `<` and `>` in this section did not get converted correctly.
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
Review Comment:
I think this section of the original doc is confusing because it seems to instruct the committer to commit the key directly to `release`, which they will not have permission to do. Perhaps we can re-arrange this section to clarify that everyone should commit to `dev`, and PMC members (either the RM themself or someone to help them) can move it to `release` after that.
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
Review Comment:
```suggestion
The release manager should have a GPG key set up to sign the artifacts. For help creating your key refer to the [ASF new committer guide](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys).
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
+Before uploading the artifacts, run some basic tests on them, similar to what other devs will run before voting in favor of the release.
+
+ 1. Extract the contents of the source tarball and build it with an empty maven cache by renaming your `~/.m2` directory before doing the build.
+ 2. Check the size of the output binary tarball for significant size increase from the last release.
+ * A significant increase in size could indicate a dependency issue that needs to be fixed.
+ * The Apache svn repo has a size limit for release artifacts. If uploading svn fails because the tarball is too big, we need to contact INFRA to increase our repo size. [See here for details.](https://issues.apache.org/jira/browse/INFRA-23892)
+ 3. Verify signatures
+ * Download the KEYS file from [https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+ * Import its contents (which should include your public gpg key): `gpg --import KEYS`
+ * Verify each .tar.gz artifact: `gpg --verify <artifact>.tar.gz.asc <artifact>.tar.gz`
+ 4. Verify checksums
+ * Run `shasum -a 512 *.tar.gz`
+ * Verify that the output checksums for each artifact match the contents of its .sha512 file and the SHA512 line in its .mds file.
+ 5. Make sure docs are present in the release tarball
+ * There should be a directory called docs in the top level. If there is not, then `hugo` was not installed during the build and it must be re-done.
+ * Extract the release and open docs/index.html in your web browser, and check that the documentation website looks ok.
+ 6. Check the output of running `bin/ozone version` from the extracted release tarball
+ * After extracting the release, the output of this command should contain:
+ * The correct release
+ * The correct national park tag
+ * A non-snapshot version of Ratis.
+ * A link to the apache/ozone GitHub repository (not your fork).
+ * The git hash of the last commit the release was built on.
+ 7. Run the Ozone upgrade acceptance tests by running `test.sh` from the compose/upgrade directory in the extracted release tarball.<br />
+ * This check is also run by the GitHub actions CI for each commit, so it should pass with no surprises.
Review Comment:
I think we should update this with instructions for the release manager to run the full backwards compatibility matrix, since CI is only running against the last release.
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
Review Comment:
```suggestion
After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the [apache/ozone](https://github.com/apache/ozone) Github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
+Before uploading the artifacts, run some basic tests on them, similar to what other devs will run before voting in favor of the release.
+
+ 1. Extract the contents of the source tarball and build it with an empty maven cache by renaming your `~/.m2` directory before doing the build.
+ 2. Check the size of the output binary tarball for significant size increase from the last release.
+ * A significant increase in size could indicate a dependency issue that needs to be fixed.
+ * The Apache svn repo has a size limit for release artifacts. If uploading svn fails because the tarball is too big, we need to contact INFRA to increase our repo size. [See here for details.](https://issues.apache.org/jira/browse/INFRA-23892)
+ 3. Verify signatures
+ * Download the KEYS file from [https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+ * Import its contents (which should include your public gpg key): `gpg --import KEYS`
+ * Verify each .tar.gz artifact: `gpg --verify <artifact>.tar.gz.asc <artifact>.tar.gz`
+ 4. Verify checksums
+ * Run `shasum -a 512 *.tar.gz`
+ * Verify that the output checksums for each artifact match the contents of its .sha512 file and the SHA512 line in its .mds file.
+ 5. Make sure docs are present in the release tarball
+ * There should be a directory called docs in the top level. If there is not, then `hugo` was not installed during the build and it must be re-done.
+ * Extract the release and open docs/index.html in your web browser, and check that the documentation website looks ok.
+ 6. Check the output of running `bin/ozone version` from the extracted release tarball
+ * After extracting the release, the output of this command should contain:
+ * The correct release
+ * The correct national park tag
+ * A non-snapshot version of Ratis.
+ * A link to the apache/ozone GitHub repository (not your fork).
+ * The git hash of the last commit the release was built on.
+ 7. Run the Ozone upgrade acceptance tests by running `test.sh` from the compose/upgrade directory in the extracted release tarball.<br />
+ * This check is also run by the GitHub actions CI for each commit, so it should pass with no surprises.
+
+### Upload the artifacts dev staging area
+
+ * Upload everything from the `$RELEASE_DIR` to the dev staging area.
+
+```bash title="Upload artifacts to staging"
+svn mkdir https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+svn co https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+cp "$RELEASE_DIR"/* "$VERSION-rc$RC"
+cd "$VERSION-rc$RC"
+svn add *
+svn commit -m "Ozone $VERSION RC$RC"
+```
+
+ * Check the results using your browser by connecting to [https://dist.apache.org/repos/dist/dev/ozone/](https://dist.apache.org/repos/dist/dev/ozone/)
+### Upload the artifacts to the apache nexus
+
+Double check if your apache credentials are added to your local ~/.m2/settings.xml
Review Comment:
```suggestion
Double check that your apache credentials are added to your local `~/.m2/settings.xml`
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
+Before uploading the artifacts, run some basic tests on them, similar to what other devs will run before voting in favor of the release.
+
+ 1. Extract the contents of the source tarball and build it with an empty maven cache by renaming your `~/.m2` directory before doing the build.
+ 2. Check the size of the output binary tarball for significant size increase from the last release.
+ * A significant increase in size could indicate a dependency issue that needs to be fixed.
+ * The Apache svn repo has a size limit for release artifacts. If uploading svn fails because the tarball is too big, we need to contact INFRA to increase our repo size. [See here for details.](https://issues.apache.org/jira/browse/INFRA-23892)
+ 3. Verify signatures
+ * Download the KEYS file from [https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+ * Import its contents (which should include your public gpg key): `gpg --import KEYS`
+ * Verify each .tar.gz artifact: `gpg --verify <artifact>.tar.gz.asc <artifact>.tar.gz`
+ 4. Verify checksums
+ * Run `shasum -a 512 *.tar.gz`
+ * Verify that the output checksums for each artifact match the contents of its .sha512 file and the SHA512 line in its .mds file.
+ 5. Make sure docs are present in the release tarball
+ * There should be a directory called docs in the top level. If there is not, then `hugo` was not installed during the build and it must be re-done.
+ * Extract the release and open docs/index.html in your web browser, and check that the documentation website looks ok.
+ 6. Check the output of running `bin/ozone version` from the extracted release tarball
+ * After extracting the release, the output of this command should contain:
+ * The correct release
+ * The correct national park tag
+ * A non-snapshot version of Ratis.
+ * A link to the apache/ozone GitHub repository (not your fork).
+ * The git hash of the last commit the release was built on.
+ 7. Run the Ozone upgrade acceptance tests by running `test.sh` from the compose/upgrade directory in the extracted release tarball.<br />
+ * This check is also run by the GitHub actions CI for each commit, so it should pass with no surprises.
+
+### Upload the artifacts dev staging area
+
+ * Upload everything from the `$RELEASE_DIR` to the dev staging area.
+
+```bash title="Upload artifacts to staging"
+svn mkdir https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+svn co https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+cp "$RELEASE_DIR"/* "$VERSION-rc$RC"
+cd "$VERSION-rc$RC"
+svn add *
+svn commit -m "Ozone $VERSION RC$RC"
+```
+
+ * Check the results using your browser by connecting to [https://dist.apache.org/repos/dist/dev/ozone/](https://dist.apache.org/repos/dist/dev/ozone/)
+### Upload the artifacts to the apache nexus
Review Comment:
```suggestion
### Upload the Artifacts to Apache Nexus
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
+Before uploading the artifacts, run some basic tests on them, similar to what other devs will run before voting in favor of the release.
+
+ 1. Extract the contents of the source tarball and build it with an empty maven cache by renaming your `~/.m2` directory before doing the build.
+ 2. Check the size of the output binary tarball for significant size increase from the last release.
+ * A significant increase in size could indicate a dependency issue that needs to be fixed.
+ * The Apache svn repo has a size limit for release artifacts. If uploading svn fails because the tarball is too big, we need to contact INFRA to increase our repo size. [See here for details.](https://issues.apache.org/jira/browse/INFRA-23892)
+ 3. Verify signatures
+ * Download the KEYS file from [https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+ * Import its contents (which should include your public gpg key): `gpg --import KEYS`
+ * Verify each .tar.gz artifact: `gpg --verify <artifact>.tar.gz.asc <artifact>.tar.gz`
+ 4. Verify checksums
+ * Run `shasum -a 512 *.tar.gz`
+ * Verify that the output checksums for each artifact match the contents of its .sha512 file and the SHA512 line in its .mds file.
+ 5. Make sure docs are present in the release tarball
+ * There should be a directory called docs in the top level. If there is not, then `hugo` was not installed during the build and it must be re-done.
+ * Extract the release and open docs/index.html in your web browser, and check that the documentation website looks ok.
+ 6. Check the output of running `bin/ozone version` from the extracted release tarball
+ * After extracting the release, the output of this command should contain:
+ * The correct release
+ * The correct national park tag
+ * A non-snapshot version of Ratis.
+ * A link to the apache/ozone GitHub repository (not your fork).
+ * The git hash of the last commit the release was built on.
+ 7. Run the Ozone upgrade acceptance tests by running `test.sh` from the compose/upgrade directory in the extracted release tarball.<br />
+ * This check is also run by the GitHub actions CI for each commit, so it should pass with no surprises.
+
+### Upload the artifacts dev staging area
+
+ * Upload everything from the `$RELEASE_DIR` to the dev staging area.
+
+```bash title="Upload artifacts to staging"
+svn mkdir https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+svn co https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+cp "$RELEASE_DIR"/* "$VERSION-rc$RC"
+cd "$VERSION-rc$RC"
+svn add *
+svn commit -m "Ozone $VERSION RC$RC"
+```
+
+ * Check the results using your browser by connecting to [https://dist.apache.org/repos/dist/dev/ozone/](https://dist.apache.org/repos/dist/dev/ozone/)
+### Upload the artifacts to the apache nexus
+
+Double check if your apache credentials are added to your local ~/.m2/settings.xml
+
+```xml
+<settings>
+ <servers>
+ <server>
+ <id>apache.snapshots.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ <!-- To stage a release of some part of Maven -->
+ <server>
+ <id>apache.staging.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ </servers>
+</settings>
+```
+
+Return to your Ozone repository being used for the release, and run the following command:
+
+```bash title="Upload Release Artifacts"
+mvn deploy -Psign -pl '!:ozone-dist' -DskipTests -Dbuildhelper.skipAttach
+```
+
+Go to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories) and **close** the newly created orgapacheozone repository.
+
+### Push the release candidate tag to github
+
+```bash title="Push the tag"
+git push origin "ozone-$VERSION-RC$RC"
+```
+
+## Vote
+
+### Send the voting mail to below mailing list
+
+dev@ozone <dev@ozone.apache.org>
+Include the following items in the email:
+
+ * Link to the release candidate tag on Github
+ * Link to a Jira query showing all resolved issues for this release. Something like [this](https://issues.apache.org/jira/issues/?jql=project%20%3D%20HDDS%20AND%20status%20in%20(Resolved%2C%20Closed)%20AND%20fixVersion%20%3D%201.4.0).
+ * Location of the source and binary tarballs. This link will look something like [https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/](https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/)
+ * Location where the maven artifacts are staged. This link will look something like [https://repository.apache.org/content/repositories/orgapacheozone-1001/](https://repository.apache.org/content/repositories/orgapacheozone-1001/)
+ * Link to the public key used to sign the artifacts. This should always be in the KEYS file and you can just link to that: [https://dist.apache.org/repos/dist/dev/ozone/KEYS](https://dist.apache.org/repos/dist/dev/ozone/KEYS)
+ * Fingerprint of the key used to sign the artifacts.
+
+If no issues are found with the artifacts, let the vote run for 7 days. Review [https://www.apache.org/legal/release-policy.html#release-approval](https://www.apache.org/legal/release-policy.html#release-approval) for the ASF wide release voting policy. Note what is required of binding voters, and that binding votes can only come from PMC members. Sometimes responders will not specify whether or not their vote is binding. If in doubt check [https://people.apache.org/committer-index.htm](https://people.apache.org/committer-index.html)l. Users whose group membership includes ozone-pmc can cast binding votes.
Review Comment:
```suggestion
If no issues are found with the artifacts, let the vote run for 7 days. Review the [ASF wide release voting policy](https://www.apache.org/legal/release-policy.html#release-approval), and note the requirements for binding votes which can only come from PMC members. Sometimes responders will not specify whether or not their vote is binding. If in doubt check [The ASF committer index](https://people.apache.org/committer-index.html). Users whose group membership includes `ozone-pmc` can cast binding votes.
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
+Before uploading the artifacts, run some basic tests on them, similar to what other devs will run before voting in favor of the release.
+
+ 1. Extract the contents of the source tarball and build it with an empty maven cache by renaming your `~/.m2` directory before doing the build.
+ 2. Check the size of the output binary tarball for significant size increase from the last release.
+ * A significant increase in size could indicate a dependency issue that needs to be fixed.
+ * The Apache svn repo has a size limit for release artifacts. If uploading svn fails because the tarball is too big, we need to contact INFRA to increase our repo size. [See here for details.](https://issues.apache.org/jira/browse/INFRA-23892)
+ 3. Verify signatures
+ * Download the KEYS file from [https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+ * Import its contents (which should include your public gpg key): `gpg --import KEYS`
+ * Verify each .tar.gz artifact: `gpg --verify <artifact>.tar.gz.asc <artifact>.tar.gz`
+ 4. Verify checksums
+ * Run `shasum -a 512 *.tar.gz`
+ * Verify that the output checksums for each artifact match the contents of its .sha512 file and the SHA512 line in its .mds file.
+ 5. Make sure docs are present in the release tarball
+ * There should be a directory called docs in the top level. If there is not, then `hugo` was not installed during the build and it must be re-done.
+ * Extract the release and open docs/index.html in your web browser, and check that the documentation website looks ok.
+ 6. Check the output of running `bin/ozone version` from the extracted release tarball
+ * After extracting the release, the output of this command should contain:
+ * The correct release
+ * The correct national park tag
+ * A non-snapshot version of Ratis.
+ * A link to the apache/ozone GitHub repository (not your fork).
+ * The git hash of the last commit the release was built on.
+ 7. Run the Ozone upgrade acceptance tests by running `test.sh` from the compose/upgrade directory in the extracted release tarball.<br />
+ * This check is also run by the GitHub actions CI for each commit, so it should pass with no surprises.
+
+### Upload the artifacts dev staging area
+
+ * Upload everything from the `$RELEASE_DIR` to the dev staging area.
+
+```bash title="Upload artifacts to staging"
+svn mkdir https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+svn co https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+cp "$RELEASE_DIR"/* "$VERSION-rc$RC"
+cd "$VERSION-rc$RC"
+svn add *
+svn commit -m "Ozone $VERSION RC$RC"
+```
+
+ * Check the results using your browser by connecting to [https://dist.apache.org/repos/dist/dev/ozone/](https://dist.apache.org/repos/dist/dev/ozone/)
+### Upload the artifacts to the apache nexus
+
+Double check if your apache credentials are added to your local ~/.m2/settings.xml
+
+```xml
+<settings>
+ <servers>
+ <server>
+ <id>apache.snapshots.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ <!-- To stage a release of some part of Maven -->
+ <server>
+ <id>apache.staging.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ </servers>
+</settings>
+```
+
+Return to your Ozone repository being used for the release, and run the following command:
+
+```bash title="Upload Release Artifacts"
+mvn deploy -Psign -pl '!:ozone-dist' -DskipTests -Dbuildhelper.skipAttach
+```
+
+Go to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories) and **close** the newly created orgapacheozone repository.
+
+### Push the release candidate tag to github
+
+```bash title="Push the tag"
+git push origin "ozone-$VERSION-RC$RC"
+```
+
+## Vote
+
+### Send the voting mail to below mailing list
+
+dev@ozone <dev@ozone.apache.org>
+Include the following items in the email:
Review Comment:
```suggestion
Send a vote email to the dev@ozone.apache.org mailing list. Include the following items in the email:
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
+Before uploading the artifacts, run some basic tests on them, similar to what other devs will run before voting in favor of the release.
+
+ 1. Extract the contents of the source tarball and build it with an empty maven cache by renaming your `~/.m2` directory before doing the build.
+ 2. Check the size of the output binary tarball for significant size increase from the last release.
+ * A significant increase in size could indicate a dependency issue that needs to be fixed.
+ * The Apache svn repo has a size limit for release artifacts. If uploading svn fails because the tarball is too big, we need to contact INFRA to increase our repo size. [See here for details.](https://issues.apache.org/jira/browse/INFRA-23892)
+ 3. Verify signatures
+ * Download the KEYS file from [https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+ * Import its contents (which should include your public gpg key): `gpg --import KEYS`
+ * Verify each .tar.gz artifact: `gpg --verify <artifact>.tar.gz.asc <artifact>.tar.gz`
+ 4. Verify checksums
+ * Run `shasum -a 512 *.tar.gz`
+ * Verify that the output checksums for each artifact match the contents of its .sha512 file and the SHA512 line in its .mds file.
+ 5. Make sure docs are present in the release tarball
+ * There should be a directory called docs in the top level. If there is not, then `hugo` was not installed during the build and it must be re-done.
+ * Extract the release and open docs/index.html in your web browser, and check that the documentation website looks ok.
+ 6. Check the output of running `bin/ozone version` from the extracted release tarball
+ * After extracting the release, the output of this command should contain:
+ * The correct release
+ * The correct national park tag
+ * A non-snapshot version of Ratis.
+ * A link to the apache/ozone GitHub repository (not your fork).
+ * The git hash of the last commit the release was built on.
+ 7. Run the Ozone upgrade acceptance tests by running `test.sh` from the compose/upgrade directory in the extracted release tarball.<br />
+ * This check is also run by the GitHub actions CI for each commit, so it should pass with no surprises.
+
+### Upload the artifacts dev staging area
+
+ * Upload everything from the `$RELEASE_DIR` to the dev staging area.
+
+```bash title="Upload artifacts to staging"
+svn mkdir https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+svn co https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+cp "$RELEASE_DIR"/* "$VERSION-rc$RC"
+cd "$VERSION-rc$RC"
+svn add *
+svn commit -m "Ozone $VERSION RC$RC"
+```
+
+ * Check the results using your browser by connecting to [https://dist.apache.org/repos/dist/dev/ozone/](https://dist.apache.org/repos/dist/dev/ozone/)
+### Upload the artifacts to the apache nexus
+
+Double check if your apache credentials are added to your local ~/.m2/settings.xml
+
+```xml
+<settings>
+ <servers>
+ <server>
+ <id>apache.snapshots.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ <!-- To stage a release of some part of Maven -->
+ <server>
+ <id>apache.staging.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ </servers>
+</settings>
+```
+
+Return to your Ozone repository being used for the release, and run the following command:
+
+```bash title="Upload Release Artifacts"
+mvn deploy -Psign -pl '!:ozone-dist' -DskipTests -Dbuildhelper.skipAttach
+```
+
+Go to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories) and **close** the newly created orgapacheozone repository.
+
+### Push the release candidate tag to github
+
+```bash title="Push the tag"
+git push origin "ozone-$VERSION-RC$RC"
+```
+
+## Vote
+
+### Send the voting mail to below mailing list
+
+dev@ozone <dev@ozone.apache.org>
+Include the following items in the email:
+
+ * Link to the release candidate tag on Github
+ * Link to a Jira query showing all resolved issues for this release. Something like [this](https://issues.apache.org/jira/issues/?jql=project%20%3D%20HDDS%20AND%20status%20in%20(Resolved%2C%20Closed)%20AND%20fixVersion%20%3D%201.4.0).
+ * Location of the source and binary tarballs. This link will look something like [https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/](https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/)
+ * Location where the maven artifacts are staged. This link will look something like [https://repository.apache.org/content/repositories/orgapacheozone-1001/](https://repository.apache.org/content/repositories/orgapacheozone-1001/)
+ * Link to the public key used to sign the artifacts. This should always be in the KEYS file and you can just link to that: [https://dist.apache.org/repos/dist/dev/ozone/KEYS](https://dist.apache.org/repos/dist/dev/ozone/KEYS)
+ * Fingerprint of the key used to sign the artifacts.
+
+If no issues are found with the artifacts, let the vote run for 7 days. Review [https://www.apache.org/legal/release-policy.html#release-approval](https://www.apache.org/legal/release-policy.html#release-approval) for the ASF wide release voting policy. Note what is required of binding voters, and that binding votes can only come from PMC members. Sometimes responders will not specify whether or not their vote is binding. If in doubt check [https://people.apache.org/committer-index.htm](https://people.apache.org/committer-index.html)l. Users whose group membership includes ozone-pmc can cast binding votes.
+
+Once voting is finished, send an email summarizing the results (binding +1s, non-binding +1s, -1s, 0s) and, if the vote passed, indicate that the release artifacts will be published. If an issue is found with the artifacts, apply fixes to the release branch and repeat the steps starting from **tagging the commit for the release candidate** with the $RC variable incremented by 1 for all steps.
+
+## After-Vote
+
+### Publish the artifacts
+
+You should commit the artifacts to the SVN repository. If you are not a PMC member you can commit it to the dev zone first and ask a PMC for the final move.
+
+Checkout the svn folder &commit the artifacts to a new directory.
+
+```
+svn checkout https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+svn mkdir "$VERSION"
+cp "$RELEASE_DIR"/* "$VERSION"/
+svn add "$VERSION"/*
+svn commit -m "Added ozone-$VERSION directory"
+```
+
+PMC members can move it to the final location:
+
+```
+svn mv -m "commit msg" https://dist.apache.org/repos/dist/dev/ozone/"$VERSION" https://dist.apache.org/repos/dist/release/ozone/"$VERSION"
+```
+
+To publish the artifacts to the central maven, login to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories)[,](https://repository.apache.org,) select your **staging** repository and **release** it.
+
+### Write a haiku
+
+Check the tag from the [Ozone Roadmap](https://cwiki.apache.org/confluence/display/OZONE/Ozone+Roadmap) page (it's a national park).
+Find a photo which is under the CC license.
+Write a haiku to the photo with Future font.
+
+### Update the ozone website
+
+ * Create release notes and add them to the Ozone website with your haiku image. An example pull request showing how to do this is [here](https://github.com/apache/ozone-site/pull/17). Note that the target branch is `master`.
+ * Extract the docs folder from the release tarball, and add its contents to the website. An example pull request for this is [here](https://github.com/apache/ozone-site/pull/18). Note that the target branch is `asf-site` , and that the docs/current symlink has been updated to point to the latest release's directory.
+ * Test the website locally by running `hugo serve` from the repository root with the master branch checked out. Check that links for the new release are working. Links to the documentation will not work until the PR to the `asf-site` branch is merged.
+
+### Add the final git tag and push it
+
+```bash title="Add final release tag"
+git checkout "ozone-$VERSION-RC$RC"
+git tag -s "ozone-$VERSION" -m "Ozone $VERSION release"
+git push origin "ozone-$VERSION"
+```
+
+### Update the master branch
+
+ * Cherry pick your commit updating the protolock files to a branch on your fork, and merge it to master with a pull request.
+ * Update the Ozone SNAPSHOT version and national park tag on master with a pull request. Here you will pick the [national park](https://en.wikipedia.org/wiki/List_of_national_parks_of_the_United_States) to use for the next release of Ozone and set it in the project's top level pom at <ozone.release>. [Example](https://github.com/apache/ozone/pull/2863)
+
+### Update the Ozone Roadmap
+
+ * Update the [Ozone Roadmap](https://cwiki.apache.org/confluence/display/OZONE/Ozone+Roadmap) so that the release notes for the just completed release are correct.
+ * Move its row to the `Past Releases` section.
+ * Create a row for the next release in the `Upcoming Releases` section, and add planned features that you are aware of.
+
+### Write an announcement mail to the Ozone mailing lists
+
+Include the following links:
+
+ * Release notes: [https://ozone.apache.org/release/1.2.0/](https://ozone.apache.org/release/1.2.0/). Replace the version in the URL with the version being released.
+ * Download link: [https://ozone.apache.org/downloads/](https://ozone.apache.org/downloads/)
+ * Link to versioned documentation: [https://ozone.apache.org/docs/](https://ozone.apache.org/docs/)
+
+### Publish a docker image for the release
+
+The Ozone docker image is intended for testing purposes only, not production use. Therefore, it is ok to update this after announcing the release. An example pull request to update the docker image is [here](https://github.com/apache/ozone-docker/pull/22/files). The target branch for your pull request should be `latest`. After the pull request is merged, it can be published to docker hub by fast-forwarding the `ozone-latest` branch to match the `latest` branch. Also, create a new branch named like `ozone-1.5.0` (replace the version) and push it to [GitHub](https://github.com/apache/ozone-docker).
+
+```bash
+git checkout ozone-latest
+git pull
+git merge --ff-only origin/latest
+git checkout -b "ozone-$VERSION"
+git push origin ozone-latest "ozone-$VERSION"
+```
+
+## Patch Release
+
+If there is a security vulnerability or critical bug uncovered in a major or minor Ozone release, a patch release may be necessary to fix this. The process is a bit simpler than a major or minor release, since there is already a solid foundation on the release's maintenance branch.
+
+ 1. Cherry pick the fix(es) on to the maintenance branch. For example, for Ozone's 1.2.0 release, this is the branch called ozone-1.2.
+ 2. Run all steps from the sections **Update the versions** through **Publish a docker image for the release**, with the following modifications:
Review Comment:
```suggestion
2. Run all steps from the sections [Update the Versions](#update-the-versions) through [Publish a Docker Image for the Release](#publish-a-docker-image-for-the-release), with the following modifications:
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
+Before uploading the artifacts, run some basic tests on them, similar to what other devs will run before voting in favor of the release.
+
+ 1. Extract the contents of the source tarball and build it with an empty maven cache by renaming your `~/.m2` directory before doing the build.
+ 2. Check the size of the output binary tarball for significant size increase from the last release.
+ * A significant increase in size could indicate a dependency issue that needs to be fixed.
+ * The Apache svn repo has a size limit for release artifacts. If uploading svn fails because the tarball is too big, we need to contact INFRA to increase our repo size. [See here for details.](https://issues.apache.org/jira/browse/INFRA-23892)
+ 3. Verify signatures
+ * Download the KEYS file from [https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+ * Import its contents (which should include your public gpg key): `gpg --import KEYS`
+ * Verify each .tar.gz artifact: `gpg --verify <artifact>.tar.gz.asc <artifact>.tar.gz`
+ 4. Verify checksums
+ * Run `shasum -a 512 *.tar.gz`
+ * Verify that the output checksums for each artifact match the contents of its .sha512 file and the SHA512 line in its .mds file.
+ 5. Make sure docs are present in the release tarball
+ * There should be a directory called docs in the top level. If there is not, then `hugo` was not installed during the build and it must be re-done.
+ * Extract the release and open docs/index.html in your web browser, and check that the documentation website looks ok.
+ 6. Check the output of running `bin/ozone version` from the extracted release tarball
+ * After extracting the release, the output of this command should contain:
+ * The correct release
+ * The correct national park tag
+ * A non-snapshot version of Ratis.
+ * A link to the apache/ozone GitHub repository (not your fork).
+ * The git hash of the last commit the release was built on.
+ 7. Run the Ozone upgrade acceptance tests by running `test.sh` from the compose/upgrade directory in the extracted release tarball.<br />
+ * This check is also run by the GitHub actions CI for each commit, so it should pass with no surprises.
+
+### Upload the artifacts dev staging area
+
+ * Upload everything from the `$RELEASE_DIR` to the dev staging area.
+
+```bash title="Upload artifacts to staging"
+svn mkdir https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+svn co https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+cp "$RELEASE_DIR"/* "$VERSION-rc$RC"
+cd "$VERSION-rc$RC"
+svn add *
+svn commit -m "Ozone $VERSION RC$RC"
+```
+
+ * Check the results using your browser by connecting to [https://dist.apache.org/repos/dist/dev/ozone/](https://dist.apache.org/repos/dist/dev/ozone/)
+### Upload the artifacts to the apache nexus
+
+Double check if your apache credentials are added to your local ~/.m2/settings.xml
+
+```xml
+<settings>
+ <servers>
+ <server>
+ <id>apache.snapshots.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ <!-- To stage a release of some part of Maven -->
+ <server>
+ <id>apache.staging.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ </servers>
+</settings>
+```
+
+Return to your Ozone repository being used for the release, and run the following command:
+
+```bash title="Upload Release Artifacts"
+mvn deploy -Psign -pl '!:ozone-dist' -DskipTests -Dbuildhelper.skipAttach
+```
+
+Go to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories) and **close** the newly created orgapacheozone repository.
+
+### Push the release candidate tag to github
+
+```bash title="Push the tag"
+git push origin "ozone-$VERSION-RC$RC"
+```
+
+## Vote
+
+### Send the voting mail to below mailing list
+
+dev@ozone <dev@ozone.apache.org>
+Include the following items in the email:
+
+ * Link to the release candidate tag on Github
+ * Link to a Jira query showing all resolved issues for this release. Something like [this](https://issues.apache.org/jira/issues/?jql=project%20%3D%20HDDS%20AND%20status%20in%20(Resolved%2C%20Closed)%20AND%20fixVersion%20%3D%201.4.0).
+ * Location of the source and binary tarballs. This link will look something like [https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/](https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/)
+ * Location where the maven artifacts are staged. This link will look something like [https://repository.apache.org/content/repositories/orgapacheozone-1001/](https://repository.apache.org/content/repositories/orgapacheozone-1001/)
+ * Link to the public key used to sign the artifacts. This should always be in the KEYS file and you can just link to that: [https://dist.apache.org/repos/dist/dev/ozone/KEYS](https://dist.apache.org/repos/dist/dev/ozone/KEYS)
+ * Fingerprint of the key used to sign the artifacts.
+
+If no issues are found with the artifacts, let the vote run for 7 days. Review [https://www.apache.org/legal/release-policy.html#release-approval](https://www.apache.org/legal/release-policy.html#release-approval) for the ASF wide release voting policy. Note what is required of binding voters, and that binding votes can only come from PMC members. Sometimes responders will not specify whether or not their vote is binding. If in doubt check [https://people.apache.org/committer-index.htm](https://people.apache.org/committer-index.html)l. Users whose group membership includes ozone-pmc can cast binding votes.
+
+Once voting is finished, send an email summarizing the results (binding +1s, non-binding +1s, -1s, 0s) and, if the vote passed, indicate that the release artifacts will be published. If an issue is found with the artifacts, apply fixes to the release branch and repeat the steps starting from **tagging the commit for the release candidate** with the $RC variable incremented by 1 for all steps.
+
+## After-Vote
+
+### Publish the artifacts
+
+You should commit the artifacts to the SVN repository. If you are not a PMC member you can commit it to the dev zone first and ask a PMC for the final move.
+
+Checkout the svn folder &commit the artifacts to a new directory.
Review Comment:
```suggestion
Checkout the svn folder and commit the artifacts to a new directory:
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
+Before uploading the artifacts, run some basic tests on them, similar to what other devs will run before voting in favor of the release.
+
+ 1. Extract the contents of the source tarball and build it with an empty maven cache by renaming your `~/.m2` directory before doing the build.
+ 2. Check the size of the output binary tarball for significant size increase from the last release.
+ * A significant increase in size could indicate a dependency issue that needs to be fixed.
+ * The Apache svn repo has a size limit for release artifacts. If uploading svn fails because the tarball is too big, we need to contact INFRA to increase our repo size. [See here for details.](https://issues.apache.org/jira/browse/INFRA-23892)
+ 3. Verify signatures
+ * Download the KEYS file from [https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+ * Import its contents (which should include your public gpg key): `gpg --import KEYS`
+ * Verify each .tar.gz artifact: `gpg --verify <artifact>.tar.gz.asc <artifact>.tar.gz`
+ 4. Verify checksums
+ * Run `shasum -a 512 *.tar.gz`
+ * Verify that the output checksums for each artifact match the contents of its .sha512 file and the SHA512 line in its .mds file.
+ 5. Make sure docs are present in the release tarball
+ * There should be a directory called docs in the top level. If there is not, then `hugo` was not installed during the build and it must be re-done.
+ * Extract the release and open docs/index.html in your web browser, and check that the documentation website looks ok.
+ 6. Check the output of running `bin/ozone version` from the extracted release tarball
+ * After extracting the release, the output of this command should contain:
+ * The correct release
+ * The correct national park tag
+ * A non-snapshot version of Ratis.
+ * A link to the apache/ozone GitHub repository (not your fork).
+ * The git hash of the last commit the release was built on.
+ 7. Run the Ozone upgrade acceptance tests by running `test.sh` from the compose/upgrade directory in the extracted release tarball.<br />
+ * This check is also run by the GitHub actions CI for each commit, so it should pass with no surprises.
+
+### Upload the artifacts dev staging area
+
+ * Upload everything from the `$RELEASE_DIR` to the dev staging area.
+
+```bash title="Upload artifacts to staging"
+svn mkdir https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+svn co https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+cp "$RELEASE_DIR"/* "$VERSION-rc$RC"
+cd "$VERSION-rc$RC"
+svn add *
+svn commit -m "Ozone $VERSION RC$RC"
+```
+
+ * Check the results using your browser by connecting to [https://dist.apache.org/repos/dist/dev/ozone/](https://dist.apache.org/repos/dist/dev/ozone/)
+### Upload the artifacts to the apache nexus
+
+Double check if your apache credentials are added to your local ~/.m2/settings.xml
+
+```xml
+<settings>
+ <servers>
+ <server>
+ <id>apache.snapshots.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ <!-- To stage a release of some part of Maven -->
+ <server>
+ <id>apache.staging.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ </servers>
+</settings>
+```
+
+Return to your Ozone repository being used for the release, and run the following command:
+
+```bash title="Upload Release Artifacts"
+mvn deploy -Psign -pl '!:ozone-dist' -DskipTests -Dbuildhelper.skipAttach
+```
+
+Go to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories) and **close** the newly created orgapacheozone repository.
+
+### Push the release candidate tag to github
+
+```bash title="Push the tag"
+git push origin "ozone-$VERSION-RC$RC"
+```
+
+## Vote
+
+### Send the voting mail to below mailing list
+
+dev@ozone <dev@ozone.apache.org>
+Include the following items in the email:
+
+ * Link to the release candidate tag on Github
+ * Link to a Jira query showing all resolved issues for this release. Something like [this](https://issues.apache.org/jira/issues/?jql=project%20%3D%20HDDS%20AND%20status%20in%20(Resolved%2C%20Closed)%20AND%20fixVersion%20%3D%201.4.0).
+ * Location of the source and binary tarballs. This link will look something like [https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/](https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/)
+ * Location where the maven artifacts are staged. This link will look something like [https://repository.apache.org/content/repositories/orgapacheozone-1001/](https://repository.apache.org/content/repositories/orgapacheozone-1001/)
+ * Link to the public key used to sign the artifacts. This should always be in the KEYS file and you can just link to that: [https://dist.apache.org/repos/dist/dev/ozone/KEYS](https://dist.apache.org/repos/dist/dev/ozone/KEYS)
+ * Fingerprint of the key used to sign the artifacts.
+
+If no issues are found with the artifacts, let the vote run for 7 days. Review [https://www.apache.org/legal/release-policy.html#release-approval](https://www.apache.org/legal/release-policy.html#release-approval) for the ASF wide release voting policy. Note what is required of binding voters, and that binding votes can only come from PMC members. Sometimes responders will not specify whether or not their vote is binding. If in doubt check [https://people.apache.org/committer-index.htm](https://people.apache.org/committer-index.html)l. Users whose group membership includes ozone-pmc can cast binding votes.
+
+Once voting is finished, send an email summarizing the results (binding +1s, non-binding +1s, -1s, 0s) and, if the vote passed, indicate that the release artifacts will be published. If an issue is found with the artifacts, apply fixes to the release branch and repeat the steps starting from **tagging the commit for the release candidate** with the $RC variable incremented by 1 for all steps.
Review Comment:
Let's use heading links to reference other parts of the document. I'm not sure this was possible in Confluence.
```suggestion
Once voting is finished, send an email summarizing the results (binding +1s, non-binding +1s, -1s, 0s) and, if the vote passed, indicate that the release artifacts will be published. If an issue is found with the artifacts, apply fixes to the release branch and repeat the steps starting from [Tag the Commit for the Release Candidate](#tag-the-commit-for-the-release-candidate) with the `$RC` variable incremented by 1 for all steps.
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
+Before uploading the artifacts, run some basic tests on them, similar to what other devs will run before voting in favor of the release.
+
+ 1. Extract the contents of the source tarball and build it with an empty maven cache by renaming your `~/.m2` directory before doing the build.
+ 2. Check the size of the output binary tarball for significant size increase from the last release.
+ * A significant increase in size could indicate a dependency issue that needs to be fixed.
+ * The Apache svn repo has a size limit for release artifacts. If uploading svn fails because the tarball is too big, we need to contact INFRA to increase our repo size. [See here for details.](https://issues.apache.org/jira/browse/INFRA-23892)
+ 3. Verify signatures
+ * Download the KEYS file from [https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+ * Import its contents (which should include your public gpg key): `gpg --import KEYS`
+ * Verify each .tar.gz artifact: `gpg --verify <artifact>.tar.gz.asc <artifact>.tar.gz`
+ 4. Verify checksums
+ * Run `shasum -a 512 *.tar.gz`
+ * Verify that the output checksums for each artifact match the contents of its .sha512 file and the SHA512 line in its .mds file.
+ 5. Make sure docs are present in the release tarball
+ * There should be a directory called docs in the top level. If there is not, then `hugo` was not installed during the build and it must be re-done.
+ * Extract the release and open docs/index.html in your web browser, and check that the documentation website looks ok.
+ 6. Check the output of running `bin/ozone version` from the extracted release tarball
+ * After extracting the release, the output of this command should contain:
+ * The correct release
+ * The correct national park tag
+ * A non-snapshot version of Ratis.
+ * A link to the apache/ozone GitHub repository (not your fork).
+ * The git hash of the last commit the release was built on.
+ 7. Run the Ozone upgrade acceptance tests by running `test.sh` from the compose/upgrade directory in the extracted release tarball.<br />
+ * This check is also run by the GitHub actions CI for each commit, so it should pass with no surprises.
+
+### Upload the artifacts dev staging area
+
+ * Upload everything from the `$RELEASE_DIR` to the dev staging area.
+
+```bash title="Upload artifacts to staging"
+svn mkdir https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+svn co https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+cp "$RELEASE_DIR"/* "$VERSION-rc$RC"
+cd "$VERSION-rc$RC"
+svn add *
+svn commit -m "Ozone $VERSION RC$RC"
+```
+
+ * Check the results using your browser by connecting to [https://dist.apache.org/repos/dist/dev/ozone/](https://dist.apache.org/repos/dist/dev/ozone/)
+### Upload the artifacts to the apache nexus
+
+Double check if your apache credentials are added to your local ~/.m2/settings.xml
+
+```xml
+<settings>
+ <servers>
+ <server>
+ <id>apache.snapshots.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ <!-- To stage a release of some part of Maven -->
+ <server>
+ <id>apache.staging.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ </servers>
+</settings>
+```
+
+Return to your Ozone repository being used for the release, and run the following command:
+
+```bash title="Upload Release Artifacts"
+mvn deploy -Psign -pl '!:ozone-dist' -DskipTests -Dbuildhelper.skipAttach
+```
+
+Go to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories) and **close** the newly created orgapacheozone repository.
+
+### Push the release candidate tag to github
+
+```bash title="Push the tag"
+git push origin "ozone-$VERSION-RC$RC"
+```
+
+## Vote
+
+### Send the voting mail to below mailing list
+
+dev@ozone <dev@ozone.apache.org>
+Include the following items in the email:
+
+ * Link to the release candidate tag on Github
+ * Link to a Jira query showing all resolved issues for this release. Something like [this](https://issues.apache.org/jira/issues/?jql=project%20%3D%20HDDS%20AND%20status%20in%20(Resolved%2C%20Closed)%20AND%20fixVersion%20%3D%201.4.0).
+ * Location of the source and binary tarballs. This link will look something like [https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/](https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/)
+ * Location where the maven artifacts are staged. This link will look something like [https://repository.apache.org/content/repositories/orgapacheozone-1001/](https://repository.apache.org/content/repositories/orgapacheozone-1001/)
+ * Link to the public key used to sign the artifacts. This should always be in the KEYS file and you can just link to that: [https://dist.apache.org/repos/dist/dev/ozone/KEYS](https://dist.apache.org/repos/dist/dev/ozone/KEYS)
+ * Fingerprint of the key used to sign the artifacts.
+
+If no issues are found with the artifacts, let the vote run for 7 days. Review [https://www.apache.org/legal/release-policy.html#release-approval](https://www.apache.org/legal/release-policy.html#release-approval) for the ASF wide release voting policy. Note what is required of binding voters, and that binding votes can only come from PMC members. Sometimes responders will not specify whether or not their vote is binding. If in doubt check [https://people.apache.org/committer-index.htm](https://people.apache.org/committer-index.html)l. Users whose group membership includes ozone-pmc can cast binding votes.
+
+Once voting is finished, send an email summarizing the results (binding +1s, non-binding +1s, -1s, 0s) and, if the vote passed, indicate that the release artifacts will be published. If an issue is found with the artifacts, apply fixes to the release branch and repeat the steps starting from **tagging the commit for the release candidate** with the $RC variable incremented by 1 for all steps.
+
+## After-Vote
+
+### Publish the artifacts
+
+You should commit the artifacts to the SVN repository. If you are not a PMC member you can commit it to the dev zone first and ask a PMC for the final move.
+
+Checkout the svn folder &commit the artifacts to a new directory.
+
+```
+svn checkout https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+svn mkdir "$VERSION"
+cp "$RELEASE_DIR"/* "$VERSION"/
+svn add "$VERSION"/*
+svn commit -m "Added ozone-$VERSION directory"
+```
+
+PMC members can move it to the final location:
+
+```
+svn mv -m "commit msg" https://dist.apache.org/repos/dist/dev/ozone/"$VERSION" https://dist.apache.org/repos/dist/release/ozone/"$VERSION"
+```
+
+To publish the artifacts to the central maven, login to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories)[,](https://repository.apache.org,) select your **staging** repository and **release** it.
+
+### Write a haiku
+
+Check the tag from the [Ozone Roadmap](https://cwiki.apache.org/confluence/display/OZONE/Ozone+Roadmap) page (it's a national park).
+Find a photo which is under the CC license.
+Write a haiku to the photo with Future font.
+
+### Update the ozone website
+
+ * Create release notes and add them to the Ozone website with your haiku image. An example pull request showing how to do this is [here](https://github.com/apache/ozone-site/pull/17). Note that the target branch is `master`.
+ * Extract the docs folder from the release tarball, and add its contents to the website. An example pull request for this is [here](https://github.com/apache/ozone-site/pull/18). Note that the target branch is `asf-site` , and that the docs/current symlink has been updated to point to the latest release's directory.
+ * Test the website locally by running `hugo serve` from the repository root with the master branch checked out. Check that links for the new release are working. Links to the documentation will not work until the PR to the `asf-site` branch is merged.
+
+### Add the final git tag and push it
+
+```bash title="Add final release tag"
+git checkout "ozone-$VERSION-RC$RC"
+git tag -s "ozone-$VERSION" -m "Ozone $VERSION release"
+git push origin "ozone-$VERSION"
+```
+
+### Update the master branch
+
+ * Cherry pick your commit updating the protolock files to a branch on your fork, and merge it to master with a pull request.
+ * Update the Ozone SNAPSHOT version and national park tag on master with a pull request. Here you will pick the [national park](https://en.wikipedia.org/wiki/List_of_national_parks_of_the_United_States) to use for the next release of Ozone and set it in the project's top level pom at <ozone.release>. [Example](https://github.com/apache/ozone/pull/2863)
Review Comment:
```suggestion
* Update the Ozone SNAPSHOT version and national park tag on master with a pull request. Here you will pick the [national park](https://en.wikipedia.org/wiki/List_of_national_parks_of_the_United_States) to use for the next release of Ozone and set it in the project's top level pom at `<ozone.release>`. See [this pull request](https://github.com/apache/ozone/pull/2863) for an example.
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
+Before uploading the artifacts, run some basic tests on them, similar to what other devs will run before voting in favor of the release.
+
+ 1. Extract the contents of the source tarball and build it with an empty maven cache by renaming your `~/.m2` directory before doing the build.
+ 2. Check the size of the output binary tarball for significant size increase from the last release.
+ * A significant increase in size could indicate a dependency issue that needs to be fixed.
+ * The Apache svn repo has a size limit for release artifacts. If uploading svn fails because the tarball is too big, we need to contact INFRA to increase our repo size. [See here for details.](https://issues.apache.org/jira/browse/INFRA-23892)
+ 3. Verify signatures
+ * Download the KEYS file from [https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+ * Import its contents (which should include your public gpg key): `gpg --import KEYS`
+ * Verify each .tar.gz artifact: `gpg --verify <artifact>.tar.gz.asc <artifact>.tar.gz`
+ 4. Verify checksums
+ * Run `shasum -a 512 *.tar.gz`
+ * Verify that the output checksums for each artifact match the contents of its .sha512 file and the SHA512 line in its .mds file.
+ 5. Make sure docs are present in the release tarball
+ * There should be a directory called docs in the top level. If there is not, then `hugo` was not installed during the build and it must be re-done.
+ * Extract the release and open docs/index.html in your web browser, and check that the documentation website looks ok.
+ 6. Check the output of running `bin/ozone version` from the extracted release tarball
+ * After extracting the release, the output of this command should contain:
+ * The correct release
+ * The correct national park tag
+ * A non-snapshot version of Ratis.
+ * A link to the apache/ozone GitHub repository (not your fork).
+ * The git hash of the last commit the release was built on.
+ 7. Run the Ozone upgrade acceptance tests by running `test.sh` from the compose/upgrade directory in the extracted release tarball.<br />
+ * This check is also run by the GitHub actions CI for each commit, so it should pass with no surprises.
+
+### Upload the artifacts dev staging area
+
+ * Upload everything from the `$RELEASE_DIR` to the dev staging area.
+
+```bash title="Upload artifacts to staging"
+svn mkdir https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+svn co https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+cp "$RELEASE_DIR"/* "$VERSION-rc$RC"
+cd "$VERSION-rc$RC"
+svn add *
+svn commit -m "Ozone $VERSION RC$RC"
+```
+
+ * Check the results using your browser by connecting to [https://dist.apache.org/repos/dist/dev/ozone/](https://dist.apache.org/repos/dist/dev/ozone/)
+### Upload the artifacts to the apache nexus
+
+Double check if your apache credentials are added to your local ~/.m2/settings.xml
+
+```xml
+<settings>
+ <servers>
+ <server>
+ <id>apache.snapshots.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ <!-- To stage a release of some part of Maven -->
+ <server>
+ <id>apache.staging.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ </servers>
+</settings>
+```
+
+Return to your Ozone repository being used for the release, and run the following command:
+
+```bash title="Upload Release Artifacts"
+mvn deploy -Psign -pl '!:ozone-dist' -DskipTests -Dbuildhelper.skipAttach
+```
+
+Go to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories) and **close** the newly created orgapacheozone repository.
+
+### Push the release candidate tag to github
+
+```bash title="Push the tag"
+git push origin "ozone-$VERSION-RC$RC"
+```
+
+## Vote
+
+### Send the voting mail to below mailing list
+
+dev@ozone <dev@ozone.apache.org>
+Include the following items in the email:
+
+ * Link to the release candidate tag on Github
+ * Link to a Jira query showing all resolved issues for this release. Something like [this](https://issues.apache.org/jira/issues/?jql=project%20%3D%20HDDS%20AND%20status%20in%20(Resolved%2C%20Closed)%20AND%20fixVersion%20%3D%201.4.0).
+ * Location of the source and binary tarballs. This link will look something like [https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/](https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/)
+ * Location where the maven artifacts are staged. This link will look something like [https://repository.apache.org/content/repositories/orgapacheozone-1001/](https://repository.apache.org/content/repositories/orgapacheozone-1001/)
+ * Link to the public key used to sign the artifacts. This should always be in the KEYS file and you can just link to that: [https://dist.apache.org/repos/dist/dev/ozone/KEYS](https://dist.apache.org/repos/dist/dev/ozone/KEYS)
+ * Fingerprint of the key used to sign the artifacts.
+
+If no issues are found with the artifacts, let the vote run for 7 days. Review [https://www.apache.org/legal/release-policy.html#release-approval](https://www.apache.org/legal/release-policy.html#release-approval) for the ASF wide release voting policy. Note what is required of binding voters, and that binding votes can only come from PMC members. Sometimes responders will not specify whether or not their vote is binding. If in doubt check [https://people.apache.org/committer-index.htm](https://people.apache.org/committer-index.html)l. Users whose group membership includes ozone-pmc can cast binding votes.
+
+Once voting is finished, send an email summarizing the results (binding +1s, non-binding +1s, -1s, 0s) and, if the vote passed, indicate that the release artifacts will be published. If an issue is found with the artifacts, apply fixes to the release branch and repeat the steps starting from **tagging the commit for the release candidate** with the $RC variable incremented by 1 for all steps.
+
+## After-Vote
+
+### Publish the artifacts
+
+You should commit the artifacts to the SVN repository. If you are not a PMC member you can commit it to the dev zone first and ask a PMC for the final move.
+
+Checkout the svn folder &commit the artifacts to a new directory.
+
+```
+svn checkout https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+svn mkdir "$VERSION"
+cp "$RELEASE_DIR"/* "$VERSION"/
+svn add "$VERSION"/*
+svn commit -m "Added ozone-$VERSION directory"
+```
+
+PMC members can move it to the final location:
+
+```
+svn mv -m "commit msg" https://dist.apache.org/repos/dist/dev/ozone/"$VERSION" https://dist.apache.org/repos/dist/release/ozone/"$VERSION"
Review Comment:
```suggestion
svn mv -m "Move ozone-$VERSION to release" https://dist.apache.org/repos/dist/dev/ozone/"$VERSION" https://dist.apache.org/repos/dist/release/ozone/"$VERSION"
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
+Before uploading the artifacts, run some basic tests on them, similar to what other devs will run before voting in favor of the release.
+
+ 1. Extract the contents of the source tarball and build it with an empty maven cache by renaming your `~/.m2` directory before doing the build.
+ 2. Check the size of the output binary tarball for significant size increase from the last release.
+ * A significant increase in size could indicate a dependency issue that needs to be fixed.
+ * The Apache svn repo has a size limit for release artifacts. If uploading svn fails because the tarball is too big, we need to contact INFRA to increase our repo size. [See here for details.](https://issues.apache.org/jira/browse/INFRA-23892)
+ 3. Verify signatures
+ * Download the KEYS file from [https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+ * Import its contents (which should include your public gpg key): `gpg --import KEYS`
+ * Verify each .tar.gz artifact: `gpg --verify <artifact>.tar.gz.asc <artifact>.tar.gz`
+ 4. Verify checksums
+ * Run `shasum -a 512 *.tar.gz`
+ * Verify that the output checksums for each artifact match the contents of its .sha512 file and the SHA512 line in its .mds file.
+ 5. Make sure docs are present in the release tarball
+ * There should be a directory called docs in the top level. If there is not, then `hugo` was not installed during the build and it must be re-done.
+ * Extract the release and open docs/index.html in your web browser, and check that the documentation website looks ok.
+ 6. Check the output of running `bin/ozone version` from the extracted release tarball
+ * After extracting the release, the output of this command should contain:
+ * The correct release
+ * The correct national park tag
+ * A non-snapshot version of Ratis.
+ * A link to the apache/ozone GitHub repository (not your fork).
+ * The git hash of the last commit the release was built on.
+ 7. Run the Ozone upgrade acceptance tests by running `test.sh` from the compose/upgrade directory in the extracted release tarball.<br />
+ * This check is also run by the GitHub actions CI for each commit, so it should pass with no surprises.
+
+### Upload the artifacts dev staging area
+
+ * Upload everything from the `$RELEASE_DIR` to the dev staging area.
+
+```bash title="Upload artifacts to staging"
+svn mkdir https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+svn co https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+cp "$RELEASE_DIR"/* "$VERSION-rc$RC"
+cd "$VERSION-rc$RC"
+svn add *
+svn commit -m "Ozone $VERSION RC$RC"
+```
+
+ * Check the results using your browser by connecting to [https://dist.apache.org/repos/dist/dev/ozone/](https://dist.apache.org/repos/dist/dev/ozone/)
+### Upload the artifacts to the apache nexus
+
+Double check if your apache credentials are added to your local ~/.m2/settings.xml
+
+```xml
+<settings>
+ <servers>
+ <server>
+ <id>apache.snapshots.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ <!-- To stage a release of some part of Maven -->
+ <server>
+ <id>apache.staging.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ </servers>
+</settings>
+```
+
+Return to your Ozone repository being used for the release, and run the following command:
+
+```bash title="Upload Release Artifacts"
+mvn deploy -Psign -pl '!:ozone-dist' -DskipTests -Dbuildhelper.skipAttach
+```
+
+Go to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories) and **close** the newly created orgapacheozone repository.
+
+### Push the release candidate tag to github
+
+```bash title="Push the tag"
+git push origin "ozone-$VERSION-RC$RC"
+```
+
+## Vote
+
+### Send the voting mail to below mailing list
+
+dev@ozone <dev@ozone.apache.org>
+Include the following items in the email:
+
+ * Link to the release candidate tag on Github
+ * Link to a Jira query showing all resolved issues for this release. Something like [this](https://issues.apache.org/jira/issues/?jql=project%20%3D%20HDDS%20AND%20status%20in%20(Resolved%2C%20Closed)%20AND%20fixVersion%20%3D%201.4.0).
+ * Location of the source and binary tarballs. This link will look something like [https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/](https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/)
Review Comment:
I think we can just include the links without the `[]()` syntax if the link text is just the URL. For example we could just write
```suggestion
* Location of the source and binary tarballs. This link will look something like https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
+Before uploading the artifacts, run some basic tests on them, similar to what other devs will run before voting in favor of the release.
+
+ 1. Extract the contents of the source tarball and build it with an empty maven cache by renaming your `~/.m2` directory before doing the build.
+ 2. Check the size of the output binary tarball for significant size increase from the last release.
+ * A significant increase in size could indicate a dependency issue that needs to be fixed.
+ * The Apache svn repo has a size limit for release artifacts. If uploading svn fails because the tarball is too big, we need to contact INFRA to increase our repo size. [See here for details.](https://issues.apache.org/jira/browse/INFRA-23892)
+ 3. Verify signatures
+ * Download the KEYS file from [https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+ * Import its contents (which should include your public gpg key): `gpg --import KEYS`
+ * Verify each .tar.gz artifact: `gpg --verify <artifact>.tar.gz.asc <artifact>.tar.gz`
+ 4. Verify checksums
+ * Run `shasum -a 512 *.tar.gz`
+ * Verify that the output checksums for each artifact match the contents of its .sha512 file and the SHA512 line in its .mds file.
+ 5. Make sure docs are present in the release tarball
+ * There should be a directory called docs in the top level. If there is not, then `hugo` was not installed during the build and it must be re-done.
+ * Extract the release and open docs/index.html in your web browser, and check that the documentation website looks ok.
+ 6. Check the output of running `bin/ozone version` from the extracted release tarball
+ * After extracting the release, the output of this command should contain:
+ * The correct release
+ * The correct national park tag
+ * A non-snapshot version of Ratis.
+ * A link to the apache/ozone GitHub repository (not your fork).
+ * The git hash of the last commit the release was built on.
+ 7. Run the Ozone upgrade acceptance tests by running `test.sh` from the compose/upgrade directory in the extracted release tarball.<br />
+ * This check is also run by the GitHub actions CI for each commit, so it should pass with no surprises.
+
+### Upload the artifacts dev staging area
+
+ * Upload everything from the `$RELEASE_DIR` to the dev staging area.
+
+```bash title="Upload artifacts to staging"
+svn mkdir https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+svn co https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+cp "$RELEASE_DIR"/* "$VERSION-rc$RC"
+cd "$VERSION-rc$RC"
+svn add *
+svn commit -m "Ozone $VERSION RC$RC"
+```
+
+ * Check the results using your browser by connecting to [https://dist.apache.org/repos/dist/dev/ozone/](https://dist.apache.org/repos/dist/dev/ozone/)
+### Upload the artifacts to the apache nexus
+
+Double check if your apache credentials are added to your local ~/.m2/settings.xml
+
+```xml
+<settings>
+ <servers>
+ <server>
+ <id>apache.snapshots.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ <!-- To stage a release of some part of Maven -->
+ <server>
+ <id>apache.staging.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ </servers>
+</settings>
+```
+
+Return to your Ozone repository being used for the release, and run the following command:
+
+```bash title="Upload Release Artifacts"
+mvn deploy -Psign -pl '!:ozone-dist' -DskipTests -Dbuildhelper.skipAttach
+```
+
+Go to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories) and **close** the newly created orgapacheozone repository.
+
+### Push the release candidate tag to github
+
+```bash title="Push the tag"
+git push origin "ozone-$VERSION-RC$RC"
+```
+
+## Vote
+
+### Send the voting mail to below mailing list
+
+dev@ozone <dev@ozone.apache.org>
+Include the following items in the email:
+
+ * Link to the release candidate tag on Github
+ * Link to a Jira query showing all resolved issues for this release. Something like [this](https://issues.apache.org/jira/issues/?jql=project%20%3D%20HDDS%20AND%20status%20in%20(Resolved%2C%20Closed)%20AND%20fixVersion%20%3D%201.4.0).
+ * Location of the source and binary tarballs. This link will look something like [https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/](https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/)
+ * Location where the maven artifacts are staged. This link will look something like [https://repository.apache.org/content/repositories/orgapacheozone-1001/](https://repository.apache.org/content/repositories/orgapacheozone-1001/)
+ * Link to the public key used to sign the artifacts. This should always be in the KEYS file and you can just link to that: [https://dist.apache.org/repos/dist/dev/ozone/KEYS](https://dist.apache.org/repos/dist/dev/ozone/KEYS)
+ * Fingerprint of the key used to sign the artifacts.
+
+If no issues are found with the artifacts, let the vote run for 7 days. Review [https://www.apache.org/legal/release-policy.html#release-approval](https://www.apache.org/legal/release-policy.html#release-approval) for the ASF wide release voting policy. Note what is required of binding voters, and that binding votes can only come from PMC members. Sometimes responders will not specify whether or not their vote is binding. If in doubt check [https://people.apache.org/committer-index.htm](https://people.apache.org/committer-index.html)l. Users whose group membership includes ozone-pmc can cast binding votes.
+
+Once voting is finished, send an email summarizing the results (binding +1s, non-binding +1s, -1s, 0s) and, if the vote passed, indicate that the release artifacts will be published. If an issue is found with the artifacts, apply fixes to the release branch and repeat the steps starting from **tagging the commit for the release candidate** with the $RC variable incremented by 1 for all steps.
+
+## After-Vote
+
+### Publish the artifacts
+
+You should commit the artifacts to the SVN repository. If you are not a PMC member you can commit it to the dev zone first and ask a PMC for the final move.
+
+Checkout the svn folder &commit the artifacts to a new directory.
+
+```
+svn checkout https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+svn mkdir "$VERSION"
+cp "$RELEASE_DIR"/* "$VERSION"/
+svn add "$VERSION"/*
+svn commit -m "Added ozone-$VERSION directory"
+```
+
+PMC members can move it to the final location:
+
+```
+svn mv -m "commit msg" https://dist.apache.org/repos/dist/dev/ozone/"$VERSION" https://dist.apache.org/repos/dist/release/ozone/"$VERSION"
+```
+
+To publish the artifacts to the central maven, login to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories)[,](https://repository.apache.org,) select your **staging** repository and **release** it.
+
+### Write a haiku
+
+Check the tag from the [Ozone Roadmap](https://cwiki.apache.org/confluence/display/OZONE/Ozone+Roadmap) page (it's a national park).
+Find a photo which is under the CC license.
+Write a haiku to the photo with Future font.
+
+### Update the ozone website
+
+ * Create release notes and add them to the Ozone website with your haiku image. An example pull request showing how to do this is [here](https://github.com/apache/ozone-site/pull/17). Note that the target branch is `master`.
+ * Extract the docs folder from the release tarball, and add its contents to the website. An example pull request for this is [here](https://github.com/apache/ozone-site/pull/18). Note that the target branch is `asf-site` , and that the docs/current symlink has been updated to point to the latest release's directory.
+ * Test the website locally by running `hugo serve` from the repository root with the master branch checked out. Check that links for the new release are working. Links to the documentation will not work until the PR to the `asf-site` branch is merged.
+
+### Add the final git tag and push it
+
+```bash title="Add final release tag"
+git checkout "ozone-$VERSION-RC$RC"
+git tag -s "ozone-$VERSION" -m "Ozone $VERSION release"
+git push origin "ozone-$VERSION"
+```
+
+### Update the master branch
+
+ * Cherry pick your commit updating the protolock files to a branch on your fork, and merge it to master with a pull request.
+ * Update the Ozone SNAPSHOT version and national park tag on master with a pull request. Here you will pick the [national park](https://en.wikipedia.org/wiki/List_of_national_parks_of_the_United_States) to use for the next release of Ozone and set it in the project's top level pom at <ozone.release>. [Example](https://github.com/apache/ozone/pull/2863)
+
+### Update the Ozone Roadmap
+
+ * Update the [Ozone Roadmap](https://cwiki.apache.org/confluence/display/OZONE/Ozone+Roadmap) so that the release notes for the just completed release are correct.
+ * Move its row to the `Past Releases` section.
+ * Create a row for the next release in the `Upcoming Releases` section, and add planned features that you are aware of.
+
+### Write an announcement mail to the Ozone mailing lists
+
+Include the following links:
+
+ * Release notes: [https://ozone.apache.org/release/1.2.0/](https://ozone.apache.org/release/1.2.0/). Replace the version in the URL with the version being released.
+ * Download link: [https://ozone.apache.org/downloads/](https://ozone.apache.org/downloads/)
+ * Link to versioned documentation: [https://ozone.apache.org/docs/](https://ozone.apache.org/docs/)
+
+### Publish a docker image for the release
+
+The Ozone docker image is intended for testing purposes only, not production use. Therefore, it is ok to update this after announcing the release. An example pull request to update the docker image is [here](https://github.com/apache/ozone-docker/pull/22/files). The target branch for your pull request should be `latest`. After the pull request is merged, it can be published to docker hub by fast-forwarding the `ozone-latest` branch to match the `latest` branch. Also, create a new branch named like `ozone-1.5.0` (replace the version) and push it to [GitHub](https://github.com/apache/ozone-docker).
+
+```bash
+git checkout ozone-latest
+git pull
+git merge --ff-only origin/latest
+git checkout -b "ozone-$VERSION"
+git push origin ozone-latest "ozone-$VERSION"
+```
+
+## Patch Release
+
+If there is a security vulnerability or critical bug uncovered in a major or minor Ozone release, a patch release may be necessary to fix this. The process is a bit simpler than a major or minor release, since there is already a solid foundation on the release's maintenance branch.
+
+ 1. Cherry pick the fix(es) on to the maintenance branch. For example, for Ozone's 1.2.0 release, this is the branch called ozone-1.2.
+ 2. Run all steps from the sections **Update the versions** through **Publish a docker image for the release**, with the following modifications:
+ * Do not update the protolock files unless protocol buffers were changed as part of the fix.
+ * When updating the website, all instances of the original major/minor release should be replaced with this patch version, since we do not want users downloading the original release anymore.
+ * For example, any website text referring to 1.2.0 should be changed to refer to 1.2.1.
+ * Continuing the 1.2.0 → 1.2.1 example, the release/1.2.0 page should redirect to release/1.2.1.
+ * An example pull request to do this is [here](https://github.com/apache/ozone-site/pull/23).
+ * The docs can be added to the website normally as described above in **Update the ozone website**. The docs link for the original major/minor release can remain alongside the docs link for the patch release.
+
+In the event of a critical security vulnerability or seriously harmful bug with a small set of changes in the patch, PMC members may vote to forgo the usual 72 hour minimum time for a release vote and publish once there are enough binding +1s.
Review Comment:
We can include this paragraph in the above list of modifications unique to doing a patch release.
```suggestion
- In the event of a critical security vulnerability or seriously harmful bug with a small set of changes in the patch, PMC members may vote to forgo the usual 72 hour minimum time for a release vote and publish once there are enough binding +1s.
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
+Before uploading the artifacts, run some basic tests on them, similar to what other devs will run before voting in favor of the release.
+
+ 1. Extract the contents of the source tarball and build it with an empty maven cache by renaming your `~/.m2` directory before doing the build.
+ 2. Check the size of the output binary tarball for significant size increase from the last release.
+ * A significant increase in size could indicate a dependency issue that needs to be fixed.
+ * The Apache svn repo has a size limit for release artifacts. If uploading svn fails because the tarball is too big, we need to contact INFRA to increase our repo size. [See here for details.](https://issues.apache.org/jira/browse/INFRA-23892)
+ 3. Verify signatures
+ * Download the KEYS file from [https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+ * Import its contents (which should include your public gpg key): `gpg --import KEYS`
+ * Verify each .tar.gz artifact: `gpg --verify <artifact>.tar.gz.asc <artifact>.tar.gz`
+ 4. Verify checksums
+ * Run `shasum -a 512 *.tar.gz`
+ * Verify that the output checksums for each artifact match the contents of its .sha512 file and the SHA512 line in its .mds file.
+ 5. Make sure docs are present in the release tarball
+ * There should be a directory called docs in the top level. If there is not, then `hugo` was not installed during the build and it must be re-done.
+ * Extract the release and open docs/index.html in your web browser, and check that the documentation website looks ok.
+ 6. Check the output of running `bin/ozone version` from the extracted release tarball
+ * After extracting the release, the output of this command should contain:
+ * The correct release
+ * The correct national park tag
+ * A non-snapshot version of Ratis.
+ * A link to the apache/ozone GitHub repository (not your fork).
+ * The git hash of the last commit the release was built on.
+ 7. Run the Ozone upgrade acceptance tests by running `test.sh` from the compose/upgrade directory in the extracted release tarball.<br />
+ * This check is also run by the GitHub actions CI for each commit, so it should pass with no surprises.
+
+### Upload the artifacts dev staging area
+
+ * Upload everything from the `$RELEASE_DIR` to the dev staging area.
+
+```bash title="Upload artifacts to staging"
+svn mkdir https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+svn co https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+cp "$RELEASE_DIR"/* "$VERSION-rc$RC"
+cd "$VERSION-rc$RC"
+svn add *
+svn commit -m "Ozone $VERSION RC$RC"
+```
+
+ * Check the results using your browser by connecting to [https://dist.apache.org/repos/dist/dev/ozone/](https://dist.apache.org/repos/dist/dev/ozone/)
+### Upload the artifacts to the apache nexus
+
+Double check if your apache credentials are added to your local ~/.m2/settings.xml
+
+```xml
+<settings>
+ <servers>
+ <server>
+ <id>apache.snapshots.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ <!-- To stage a release of some part of Maven -->
+ <server>
+ <id>apache.staging.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ </servers>
+</settings>
+```
+
+Return to your Ozone repository being used for the release, and run the following command:
+
+```bash title="Upload Release Artifacts"
+mvn deploy -Psign -pl '!:ozone-dist' -DskipTests -Dbuildhelper.skipAttach
+```
+
+Go to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories) and **close** the newly created orgapacheozone repository.
+
+### Push the release candidate tag to github
+
+```bash title="Push the tag"
+git push origin "ozone-$VERSION-RC$RC"
+```
+
+## Vote
+
+### Send the voting mail to below mailing list
+
+dev@ozone <dev@ozone.apache.org>
+Include the following items in the email:
+
+ * Link to the release candidate tag on Github
+ * Link to a Jira query showing all resolved issues for this release. Something like [this](https://issues.apache.org/jira/issues/?jql=project%20%3D%20HDDS%20AND%20status%20in%20(Resolved%2C%20Closed)%20AND%20fixVersion%20%3D%201.4.0).
+ * Location of the source and binary tarballs. This link will look something like [https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/](https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/)
+ * Location where the maven artifacts are staged. This link will look something like [https://repository.apache.org/content/repositories/orgapacheozone-1001/](https://repository.apache.org/content/repositories/orgapacheozone-1001/)
+ * Link to the public key used to sign the artifacts. This should always be in the KEYS file and you can just link to that: [https://dist.apache.org/repos/dist/dev/ozone/KEYS](https://dist.apache.org/repos/dist/dev/ozone/KEYS)
+ * Fingerprint of the key used to sign the artifacts.
+
+If no issues are found with the artifacts, let the vote run for 7 days. Review [https://www.apache.org/legal/release-policy.html#release-approval](https://www.apache.org/legal/release-policy.html#release-approval) for the ASF wide release voting policy. Note what is required of binding voters, and that binding votes can only come from PMC members. Sometimes responders will not specify whether or not their vote is binding. If in doubt check [https://people.apache.org/committer-index.htm](https://people.apache.org/committer-index.html)l. Users whose group membership includes ozone-pmc can cast binding votes.
+
+Once voting is finished, send an email summarizing the results (binding +1s, non-binding +1s, -1s, 0s) and, if the vote passed, indicate that the release artifacts will be published. If an issue is found with the artifacts, apply fixes to the release branch and repeat the steps starting from **tagging the commit for the release candidate** with the $RC variable incremented by 1 for all steps.
+
+## After-Vote
+
+### Publish the artifacts
+
+You should commit the artifacts to the SVN repository. If you are not a PMC member you can commit it to the dev zone first and ask a PMC for the final move.
+
+Checkout the svn folder &commit the artifacts to a new directory.
+
+```
+svn checkout https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+svn mkdir "$VERSION"
+cp "$RELEASE_DIR"/* "$VERSION"/
+svn add "$VERSION"/*
+svn commit -m "Added ozone-$VERSION directory"
+```
+
+PMC members can move it to the final location:
+
+```
+svn mv -m "commit msg" https://dist.apache.org/repos/dist/dev/ozone/"$VERSION" https://dist.apache.org/repos/dist/release/ozone/"$VERSION"
+```
+
+To publish the artifacts to the central maven, login to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories)[,](https://repository.apache.org,) select your **staging** repository and **release** it.
Review Comment:
```suggestion
To publish the artifacts to [Maven Central](https://central.sonatype.com), login to https://repository.apache.org/#stagingRepositories, select your **staging** repository and **release** it.
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
Review Comment:
```suggestion
## Publish Your GPG Key
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
+Before uploading the artifacts, run some basic tests on them, similar to what other devs will run before voting in favor of the release.
+
+ 1. Extract the contents of the source tarball and build it with an empty maven cache by renaming your `~/.m2` directory before doing the build.
+ 2. Check the size of the output binary tarball for significant size increase from the last release.
+ * A significant increase in size could indicate a dependency issue that needs to be fixed.
+ * The Apache svn repo has a size limit for release artifacts. If uploading svn fails because the tarball is too big, we need to contact INFRA to increase our repo size. [See here for details.](https://issues.apache.org/jira/browse/INFRA-23892)
+ 3. Verify signatures
+ * Download the KEYS file from [https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+ * Import its contents (which should include your public gpg key): `gpg --import KEYS`
+ * Verify each .tar.gz artifact: `gpg --verify <artifact>.tar.gz.asc <artifact>.tar.gz`
+ 4. Verify checksums
+ * Run `shasum -a 512 *.tar.gz`
+ * Verify that the output checksums for each artifact match the contents of its .sha512 file and the SHA512 line in its .mds file.
+ 5. Make sure docs are present in the release tarball
+ * There should be a directory called docs in the top level. If there is not, then `hugo` was not installed during the build and it must be re-done.
+ * Extract the release and open docs/index.html in your web browser, and check that the documentation website looks ok.
+ 6. Check the output of running `bin/ozone version` from the extracted release tarball
+ * After extracting the release, the output of this command should contain:
+ * The correct release
+ * The correct national park tag
+ * A non-snapshot version of Ratis.
+ * A link to the apache/ozone GitHub repository (not your fork).
+ * The git hash of the last commit the release was built on.
+ 7. Run the Ozone upgrade acceptance tests by running `test.sh` from the compose/upgrade directory in the extracted release tarball.<br />
+ * This check is also run by the GitHub actions CI for each commit, so it should pass with no surprises.
+
+### Upload the artifacts dev staging area
+
+ * Upload everything from the `$RELEASE_DIR` to the dev staging area.
+
+```bash title="Upload artifacts to staging"
+svn mkdir https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+svn co https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+cp "$RELEASE_DIR"/* "$VERSION-rc$RC"
+cd "$VERSION-rc$RC"
+svn add *
+svn commit -m "Ozone $VERSION RC$RC"
+```
+
+ * Check the results using your browser by connecting to [https://dist.apache.org/repos/dist/dev/ozone/](https://dist.apache.org/repos/dist/dev/ozone/)
+### Upload the artifacts to the apache nexus
+
+Double check if your apache credentials are added to your local ~/.m2/settings.xml
+
+```xml
+<settings>
+ <servers>
+ <server>
+ <id>apache.snapshots.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ <!-- To stage a release of some part of Maven -->
+ <server>
+ <id>apache.staging.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ </servers>
+</settings>
+```
+
+Return to your Ozone repository being used for the release, and run the following command:
+
+```bash title="Upload Release Artifacts"
+mvn deploy -Psign -pl '!:ozone-dist' -DskipTests -Dbuildhelper.skipAttach
+```
+
+Go to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories) and **close** the newly created orgapacheozone repository.
+
+### Push the release candidate tag to github
+
+```bash title="Push the tag"
+git push origin "ozone-$VERSION-RC$RC"
+```
+
+## Vote
+
+### Send the voting mail to below mailing list
+
+dev@ozone <dev@ozone.apache.org>
+Include the following items in the email:
+
+ * Link to the release candidate tag on Github
+ * Link to a Jira query showing all resolved issues for this release. Something like [this](https://issues.apache.org/jira/issues/?jql=project%20%3D%20HDDS%20AND%20status%20in%20(Resolved%2C%20Closed)%20AND%20fixVersion%20%3D%201.4.0).
+ * Location of the source and binary tarballs. This link will look something like [https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/](https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/)
+ * Location where the maven artifacts are staged. This link will look something like [https://repository.apache.org/content/repositories/orgapacheozone-1001/](https://repository.apache.org/content/repositories/orgapacheozone-1001/)
+ * Link to the public key used to sign the artifacts. This should always be in the KEYS file and you can just link to that: [https://dist.apache.org/repos/dist/dev/ozone/KEYS](https://dist.apache.org/repos/dist/dev/ozone/KEYS)
+ * Fingerprint of the key used to sign the artifacts.
+
+If no issues are found with the artifacts, let the vote run for 7 days. Review [https://www.apache.org/legal/release-policy.html#release-approval](https://www.apache.org/legal/release-policy.html#release-approval) for the ASF wide release voting policy. Note what is required of binding voters, and that binding votes can only come from PMC members. Sometimes responders will not specify whether or not their vote is binding. If in doubt check [https://people.apache.org/committer-index.htm](https://people.apache.org/committer-index.html)l. Users whose group membership includes ozone-pmc can cast binding votes.
+
+Once voting is finished, send an email summarizing the results (binding +1s, non-binding +1s, -1s, 0s) and, if the vote passed, indicate that the release artifacts will be published. If an issue is found with the artifacts, apply fixes to the release branch and repeat the steps starting from **tagging the commit for the release candidate** with the $RC variable incremented by 1 for all steps.
+
+## After-Vote
+
+### Publish the artifacts
+
+You should commit the artifacts to the SVN repository. If you are not a PMC member you can commit it to the dev zone first and ask a PMC for the final move.
+
+Checkout the svn folder &commit the artifacts to a new directory.
+
+```
+svn checkout https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+svn mkdir "$VERSION"
+cp "$RELEASE_DIR"/* "$VERSION"/
+svn add "$VERSION"/*
+svn commit -m "Added ozone-$VERSION directory"
+```
+
+PMC members can move it to the final location:
+
+```
+svn mv -m "commit msg" https://dist.apache.org/repos/dist/dev/ozone/"$VERSION" https://dist.apache.org/repos/dist/release/ozone/"$VERSION"
+```
+
+To publish the artifacts to the central maven, login to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories)[,](https://repository.apache.org,) select your **staging** repository and **release** it.
+
+### Write a haiku
+
+Check the tag from the [Ozone Roadmap](https://cwiki.apache.org/confluence/display/OZONE/Ozone+Roadmap) page (it's a national park).
+Find a photo which is under the CC license.
+Write a haiku to the photo with Future font.
+
+### Update the ozone website
+
+ * Create release notes and add them to the Ozone website with your haiku image. An example pull request showing how to do this is [here](https://github.com/apache/ozone-site/pull/17). Note that the target branch is `master`.
+ * Extract the docs folder from the release tarball, and add its contents to the website. An example pull request for this is [here](https://github.com/apache/ozone-site/pull/18). Note that the target branch is `asf-site` , and that the docs/current symlink has been updated to point to the latest release's directory.
+ * Test the website locally by running `hugo serve` from the repository root with the master branch checked out. Check that links for the new release are working. Links to the documentation will not work until the PR to the `asf-site` branch is merged.
+
+### Add the final git tag and push it
+
+```bash title="Add final release tag"
+git checkout "ozone-$VERSION-RC$RC"
+git tag -s "ozone-$VERSION" -m "Ozone $VERSION release"
+git push origin "ozone-$VERSION"
+```
+
+### Update the master branch
+
+ * Cherry pick your commit updating the protolock files to a branch on your fork, and merge it to master with a pull request.
+ * Update the Ozone SNAPSHOT version and national park tag on master with a pull request. Here you will pick the [national park](https://en.wikipedia.org/wiki/List_of_national_parks_of_the_United_States) to use for the next release of Ozone and set it in the project's top level pom at <ozone.release>. [Example](https://github.com/apache/ozone/pull/2863)
+
+### Update the Ozone Roadmap
+
+ * Update the [Ozone Roadmap](https://cwiki.apache.org/confluence/display/OZONE/Ozone+Roadmap) so that the release notes for the just completed release are correct.
+ * Move its row to the `Past Releases` section.
+ * Create a row for the next release in the `Upcoming Releases` section, and add planned features that you are aware of.
+
+### Write an announcement mail to the Ozone mailing lists
+
+Include the following links:
+
+ * Release notes: [https://ozone.apache.org/release/1.2.0/](https://ozone.apache.org/release/1.2.0/). Replace the version in the URL with the version being released.
+ * Download link: [https://ozone.apache.org/downloads/](https://ozone.apache.org/downloads/)
+ * Link to versioned documentation: [https://ozone.apache.org/docs/](https://ozone.apache.org/docs/)
+
+### Publish a docker image for the release
+
+The Ozone docker image is intended for testing purposes only, not production use. Therefore, it is ok to update this after announcing the release. An example pull request to update the docker image is [here](https://github.com/apache/ozone-docker/pull/22/files). The target branch for your pull request should be `latest`. After the pull request is merged, it can be published to docker hub by fast-forwarding the `ozone-latest` branch to match the `latest` branch. Also, create a new branch named like `ozone-1.5.0` (replace the version) and push it to [GitHub](https://github.com/apache/ozone-docker).
+
+```bash
+git checkout ozone-latest
+git pull
+git merge --ff-only origin/latest
+git checkout -b "ozone-$VERSION"
+git push origin ozone-latest "ozone-$VERSION"
+```
+
+## Patch Release
+
+If there is a security vulnerability or critical bug uncovered in a major or minor Ozone release, a patch release may be necessary to fix this. The process is a bit simpler than a major or minor release, since there is already a solid foundation on the release's maintenance branch.
+
+ 1. Cherry pick the fix(es) on to the maintenance branch. For example, for Ozone's 1.2.0 release, this is the branch called ozone-1.2.
Review Comment:
```suggestion
1. Cherry pick the fix(es) on to the maintenance branch. For example, for Ozone's 1.2.0 release, this is the branch called `ozone-1.2`.
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
+Before uploading the artifacts, run some basic tests on them, similar to what other devs will run before voting in favor of the release.
+
+ 1. Extract the contents of the source tarball and build it with an empty maven cache by renaming your `~/.m2` directory before doing the build.
+ 2. Check the size of the output binary tarball for significant size increase from the last release.
+ * A significant increase in size could indicate a dependency issue that needs to be fixed.
+ * The Apache svn repo has a size limit for release artifacts. If uploading svn fails because the tarball is too big, we need to contact INFRA to increase our repo size. [See here for details.](https://issues.apache.org/jira/browse/INFRA-23892)
+ 3. Verify signatures
+ * Download the KEYS file from [https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+ * Import its contents (which should include your public gpg key): `gpg --import KEYS`
+ * Verify each .tar.gz artifact: `gpg --verify <artifact>.tar.gz.asc <artifact>.tar.gz`
+ 4. Verify checksums
+ * Run `shasum -a 512 *.tar.gz`
+ * Verify that the output checksums for each artifact match the contents of its .sha512 file and the SHA512 line in its .mds file.
+ 5. Make sure docs are present in the release tarball
+ * There should be a directory called docs in the top level. If there is not, then `hugo` was not installed during the build and it must be re-done.
+ * Extract the release and open docs/index.html in your web browser, and check that the documentation website looks ok.
+ 6. Check the output of running `bin/ozone version` from the extracted release tarball
+ * After extracting the release, the output of this command should contain:
+ * The correct release
+ * The correct national park tag
+ * A non-snapshot version of Ratis.
+ * A link to the apache/ozone GitHub repository (not your fork).
+ * The git hash of the last commit the release was built on.
+ 7. Run the Ozone upgrade acceptance tests by running `test.sh` from the compose/upgrade directory in the extracted release tarball.<br />
+ * This check is also run by the GitHub actions CI for each commit, so it should pass with no surprises.
+
+### Upload the artifacts dev staging area
+
+ * Upload everything from the `$RELEASE_DIR` to the dev staging area.
+
+```bash title="Upload artifacts to staging"
+svn mkdir https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+svn co https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+cp "$RELEASE_DIR"/* "$VERSION-rc$RC"
+cd "$VERSION-rc$RC"
+svn add *
+svn commit -m "Ozone $VERSION RC$RC"
+```
+
+ * Check the results using your browser by connecting to [https://dist.apache.org/repos/dist/dev/ozone/](https://dist.apache.org/repos/dist/dev/ozone/)
+### Upload the artifacts to the apache nexus
+
+Double check if your apache credentials are added to your local ~/.m2/settings.xml
+
+```xml
+<settings>
+ <servers>
+ <server>
+ <id>apache.snapshots.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ <!-- To stage a release of some part of Maven -->
+ <server>
+ <id>apache.staging.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ </servers>
+</settings>
+```
+
+Return to your Ozone repository being used for the release, and run the following command:
+
+```bash title="Upload Release Artifacts"
+mvn deploy -Psign -pl '!:ozone-dist' -DskipTests -Dbuildhelper.skipAttach
+```
+
+Go to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories) and **close** the newly created orgapacheozone repository.
+
+### Push the release candidate tag to github
+
+```bash title="Push the tag"
+git push origin "ozone-$VERSION-RC$RC"
+```
+
+## Vote
+
+### Send the voting mail to below mailing list
+
+dev@ozone <dev@ozone.apache.org>
+Include the following items in the email:
+
+ * Link to the release candidate tag on Github
+ * Link to a Jira query showing all resolved issues for this release. Something like [this](https://issues.apache.org/jira/issues/?jql=project%20%3D%20HDDS%20AND%20status%20in%20(Resolved%2C%20Closed)%20AND%20fixVersion%20%3D%201.4.0).
+ * Location of the source and binary tarballs. This link will look something like [https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/](https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/)
+ * Location where the maven artifacts are staged. This link will look something like [https://repository.apache.org/content/repositories/orgapacheozone-1001/](https://repository.apache.org/content/repositories/orgapacheozone-1001/)
+ * Link to the public key used to sign the artifacts. This should always be in the KEYS file and you can just link to that: [https://dist.apache.org/repos/dist/dev/ozone/KEYS](https://dist.apache.org/repos/dist/dev/ozone/KEYS)
+ * Fingerprint of the key used to sign the artifacts.
+
+If no issues are found with the artifacts, let the vote run for 7 days. Review [https://www.apache.org/legal/release-policy.html#release-approval](https://www.apache.org/legal/release-policy.html#release-approval) for the ASF wide release voting policy. Note what is required of binding voters, and that binding votes can only come from PMC members. Sometimes responders will not specify whether or not their vote is binding. If in doubt check [https://people.apache.org/committer-index.htm](https://people.apache.org/committer-index.html)l. Users whose group membership includes ozone-pmc can cast binding votes.
+
+Once voting is finished, send an email summarizing the results (binding +1s, non-binding +1s, -1s, 0s) and, if the vote passed, indicate that the release artifacts will be published. If an issue is found with the artifacts, apply fixes to the release branch and repeat the steps starting from **tagging the commit for the release candidate** with the $RC variable incremented by 1 for all steps.
+
+## After-Vote
+
+### Publish the artifacts
+
+You should commit the artifacts to the SVN repository. If you are not a PMC member you can commit it to the dev zone first and ask a PMC for the final move.
+
+Checkout the svn folder &commit the artifacts to a new directory.
+
+```
+svn checkout https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+svn mkdir "$VERSION"
+cp "$RELEASE_DIR"/* "$VERSION"/
+svn add "$VERSION"/*
+svn commit -m "Added ozone-$VERSION directory"
+```
+
+PMC members can move it to the final location:
+
+```
+svn mv -m "commit msg" https://dist.apache.org/repos/dist/dev/ozone/"$VERSION" https://dist.apache.org/repos/dist/release/ozone/"$VERSION"
+```
+
+To publish the artifacts to the central maven, login to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories)[,](https://repository.apache.org,) select your **staging** repository and **release** it.
+
+### Write a haiku
+
+Check the tag from the [Ozone Roadmap](https://cwiki.apache.org/confluence/display/OZONE/Ozone+Roadmap) page (it's a national park).
+Find a photo which is under the CC license.
+Write a haiku to the photo with Future font.
+
+### Update the ozone website
+
+ * Create release notes and add them to the Ozone website with your haiku image. An example pull request showing how to do this is [here](https://github.com/apache/ozone-site/pull/17). Note that the target branch is `master`.
+ * Extract the docs folder from the release tarball, and add its contents to the website. An example pull request for this is [here](https://github.com/apache/ozone-site/pull/18). Note that the target branch is `asf-site` , and that the docs/current symlink has been updated to point to the latest release's directory.
+ * Test the website locally by running `hugo serve` from the repository root with the master branch checked out. Check that links for the new release are working. Links to the documentation will not work until the PR to the `asf-site` branch is merged.
+
+### Add the final git tag and push it
+
+```bash title="Add final release tag"
+git checkout "ozone-$VERSION-RC$RC"
+git tag -s "ozone-$VERSION" -m "Ozone $VERSION release"
+git push origin "ozone-$VERSION"
+```
+
+### Update the master branch
+
+ * Cherry pick your commit updating the protolock files to a branch on your fork, and merge it to master with a pull request.
+ * Update the Ozone SNAPSHOT version and national park tag on master with a pull request. Here you will pick the [national park](https://en.wikipedia.org/wiki/List_of_national_parks_of_the_United_States) to use for the next release of Ozone and set it in the project's top level pom at <ozone.release>. [Example](https://github.com/apache/ozone/pull/2863)
+
+### Update the Ozone Roadmap
+
+ * Update the [Ozone Roadmap](https://cwiki.apache.org/confluence/display/OZONE/Ozone+Roadmap) so that the release notes for the just completed release are correct.
+ * Move its row to the `Past Releases` section.
+ * Create a row for the next release in the `Upcoming Releases` section, and add planned features that you are aware of.
+
+### Write an announcement mail to the Ozone mailing lists
+
+Include the following links:
+
+ * Release notes: [https://ozone.apache.org/release/1.2.0/](https://ozone.apache.org/release/1.2.0/). Replace the version in the URL with the version being released.
+ * Download link: [https://ozone.apache.org/downloads/](https://ozone.apache.org/downloads/)
+ * Link to versioned documentation: [https://ozone.apache.org/docs/](https://ozone.apache.org/docs/)
+
+### Publish a docker image for the release
+
+The Ozone docker image is intended for testing purposes only, not production use. Therefore, it is ok to update this after announcing the release. An example pull request to update the docker image is [here](https://github.com/apache/ozone-docker/pull/22/files). The target branch for your pull request should be `latest`. After the pull request is merged, it can be published to docker hub by fast-forwarding the `ozone-latest` branch to match the `latest` branch. Also, create a new branch named like `ozone-1.5.0` (replace the version) and push it to [GitHub](https://github.com/apache/ozone-docker).
+
+```bash
+git checkout ozone-latest
+git pull
+git merge --ff-only origin/latest
+git checkout -b "ozone-$VERSION"
+git push origin ozone-latest "ozone-$VERSION"
+```
+
+## Patch Release
+
+If there is a security vulnerability or critical bug uncovered in a major or minor Ozone release, a patch release may be necessary to fix this. The process is a bit simpler than a major or minor release, since there is already a solid foundation on the release's maintenance branch.
+
+ 1. Cherry pick the fix(es) on to the maintenance branch. For example, for Ozone's 1.2.0 release, this is the branch called ozone-1.2.
+ 2. Run all steps from the sections **Update the versions** through **Publish a docker image for the release**, with the following modifications:
+ * Do not update the protolock files unless protocol buffers were changed as part of the fix.
+ * When updating the website, all instances of the original major/minor release should be replaced with this patch version, since we do not want users downloading the original release anymore.
+ * For example, any website text referring to 1.2.0 should be changed to refer to 1.2.1.
+ * Continuing the 1.2.0 → 1.2.1 example, the release/1.2.0 page should redirect to release/1.2.1.
+ * An example pull request to do this is [here](https://github.com/apache/ozone-site/pull/23).
+ * The docs can be added to the website normally as described above in **Update the ozone website**. The docs link for the original major/minor release can remain alongside the docs link for the patch release.
Review Comment:
```suggestion
* The docs can be added to the website normally as described above in [Update the Ozone Website](#update-the-ozone-website). The docs link for the original major/minor release can remain alongside the docs link for the patch release.
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
Review Comment:
I think we should combine this part under `Publish Your GPG Key` since it is just one line, and then move `Publish Your GPG Key` under `Pre-Vote`. IMO this makes the mini-map flow better.
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
+Before uploading the artifacts, run some basic tests on them, similar to what other devs will run before voting in favor of the release.
+
+ 1. Extract the contents of the source tarball and build it with an empty maven cache by renaming your `~/.m2` directory before doing the build.
+ 2. Check the size of the output binary tarball for significant size increase from the last release.
+ * A significant increase in size could indicate a dependency issue that needs to be fixed.
+ * The Apache svn repo has a size limit for release artifacts. If uploading svn fails because the tarball is too big, we need to contact INFRA to increase our repo size. [See here for details.](https://issues.apache.org/jira/browse/INFRA-23892)
+ 3. Verify signatures
+ * Download the KEYS file from [https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+ * Import its contents (which should include your public gpg key): `gpg --import KEYS`
+ * Verify each .tar.gz artifact: `gpg --verify <artifact>.tar.gz.asc <artifact>.tar.gz`
+ 4. Verify checksums
+ * Run `shasum -a 512 *.tar.gz`
+ * Verify that the output checksums for each artifact match the contents of its .sha512 file and the SHA512 line in its .mds file.
+ 5. Make sure docs are present in the release tarball
+ * There should be a directory called docs in the top level. If there is not, then `hugo` was not installed during the build and it must be re-done.
+ * Extract the release and open docs/index.html in your web browser, and check that the documentation website looks ok.
+ 6. Check the output of running `bin/ozone version` from the extracted release tarball
+ * After extracting the release, the output of this command should contain:
+ * The correct release
+ * The correct national park tag
+ * A non-snapshot version of Ratis.
+ * A link to the apache/ozone GitHub repository (not your fork).
+ * The git hash of the last commit the release was built on.
+ 7. Run the Ozone upgrade acceptance tests by running `test.sh` from the compose/upgrade directory in the extracted release tarball.<br />
+ * This check is also run by the GitHub actions CI for each commit, so it should pass with no surprises.
+
+### Upload the artifacts dev staging area
+
+ * Upload everything from the `$RELEASE_DIR` to the dev staging area.
+
+```bash title="Upload artifacts to staging"
+svn mkdir https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+svn co https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+cp "$RELEASE_DIR"/* "$VERSION-rc$RC"
+cd "$VERSION-rc$RC"
+svn add *
+svn commit -m "Ozone $VERSION RC$RC"
+```
+
+ * Check the results using your browser by connecting to [https://dist.apache.org/repos/dist/dev/ozone/](https://dist.apache.org/repos/dist/dev/ozone/)
+### Upload the artifacts to the apache nexus
+
+Double check if your apache credentials are added to your local ~/.m2/settings.xml
+
+```xml
+<settings>
+ <servers>
+ <server>
+ <id>apache.snapshots.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ <!-- To stage a release of some part of Maven -->
+ <server>
+ <id>apache.staging.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ </servers>
+</settings>
+```
+
+Return to your Ozone repository being used for the release, and run the following command:
+
+```bash title="Upload Release Artifacts"
+mvn deploy -Psign -pl '!:ozone-dist' -DskipTests -Dbuildhelper.skipAttach
+```
+
+Go to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories) and **close** the newly created orgapacheozone repository.
+
+### Push the release candidate tag to github
+
+```bash title="Push the tag"
+git push origin "ozone-$VERSION-RC$RC"
+```
+
+## Vote
+
+### Send the voting mail to below mailing list
+
+dev@ozone <dev@ozone.apache.org>
+Include the following items in the email:
+
+ * Link to the release candidate tag on Github
+ * Link to a Jira query showing all resolved issues for this release. Something like [this](https://issues.apache.org/jira/issues/?jql=project%20%3D%20HDDS%20AND%20status%20in%20(Resolved%2C%20Closed)%20AND%20fixVersion%20%3D%201.4.0).
+ * Location of the source and binary tarballs. This link will look something like [https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/](https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/)
+ * Location where the maven artifacts are staged. This link will look something like [https://repository.apache.org/content/repositories/orgapacheozone-1001/](https://repository.apache.org/content/repositories/orgapacheozone-1001/)
+ * Link to the public key used to sign the artifacts. This should always be in the KEYS file and you can just link to that: [https://dist.apache.org/repos/dist/dev/ozone/KEYS](https://dist.apache.org/repos/dist/dev/ozone/KEYS)
+ * Fingerprint of the key used to sign the artifacts.
+
+If no issues are found with the artifacts, let the vote run for 7 days. Review [https://www.apache.org/legal/release-policy.html#release-approval](https://www.apache.org/legal/release-policy.html#release-approval) for the ASF wide release voting policy. Note what is required of binding voters, and that binding votes can only come from PMC members. Sometimes responders will not specify whether or not their vote is binding. If in doubt check [https://people.apache.org/committer-index.htm](https://people.apache.org/committer-index.html)l. Users whose group membership includes ozone-pmc can cast binding votes.
+
+Once voting is finished, send an email summarizing the results (binding +1s, non-binding +1s, -1s, 0s) and, if the vote passed, indicate that the release artifacts will be published. If an issue is found with the artifacts, apply fixes to the release branch and repeat the steps starting from **tagging the commit for the release candidate** with the $RC variable incremented by 1 for all steps.
+
+## After-Vote
+
+### Publish the artifacts
+
+You should commit the artifacts to the SVN repository. If you are not a PMC member you can commit it to the dev zone first and ask a PMC for the final move.
+
+Checkout the svn folder &commit the artifacts to a new directory.
+
+```
+svn checkout https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+svn mkdir "$VERSION"
+cp "$RELEASE_DIR"/* "$VERSION"/
+svn add "$VERSION"/*
+svn commit -m "Added ozone-$VERSION directory"
+```
+
+PMC members can move it to the final location:
+
+```
+svn mv -m "commit msg" https://dist.apache.org/repos/dist/dev/ozone/"$VERSION" https://dist.apache.org/repos/dist/release/ozone/"$VERSION"
+```
+
+To publish the artifacts to the central maven, login to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories)[,](https://repository.apache.org,) select your **staging** repository and **release** it.
+
+### Write a haiku
+
+Check the tag from the [Ozone Roadmap](https://cwiki.apache.org/confluence/display/OZONE/Ozone+Roadmap) page (it's a national park).
+Find a photo which is under the CC license.
+Write a haiku to the photo with Future font.
+
+### Update the ozone website
+
+ * Create release notes and add them to the Ozone website with your haiku image. An example pull request showing how to do this is [here](https://github.com/apache/ozone-site/pull/17). Note that the target branch is `master`.
+ * Extract the docs folder from the release tarball, and add its contents to the website. An example pull request for this is [here](https://github.com/apache/ozone-site/pull/18). Note that the target branch is `asf-site` , and that the docs/current symlink has been updated to point to the latest release's directory.
+ * Test the website locally by running `hugo serve` from the repository root with the master branch checked out. Check that links for the new release are working. Links to the documentation will not work until the PR to the `asf-site` branch is merged.
+
+### Add the final git tag and push it
+
+```bash title="Add final release tag"
+git checkout "ozone-$VERSION-RC$RC"
+git tag -s "ozone-$VERSION" -m "Ozone $VERSION release"
+git push origin "ozone-$VERSION"
+```
+
+### Update the master branch
+
+ * Cherry pick your commit updating the protolock files to a branch on your fork, and merge it to master with a pull request.
+ * Update the Ozone SNAPSHOT version and national park tag on master with a pull request. Here you will pick the [national park](https://en.wikipedia.org/wiki/List_of_national_parks_of_the_United_States) to use for the next release of Ozone and set it in the project's top level pom at <ozone.release>. [Example](https://github.com/apache/ozone/pull/2863)
+
+### Update the Ozone Roadmap
+
+ * Update the [Ozone Roadmap](https://cwiki.apache.org/confluence/display/OZONE/Ozone+Roadmap) so that the release notes for the just completed release are correct.
+ * Move its row to the `Past Releases` section.
+ * Create a row for the next release in the `Upcoming Releases` section, and add planned features that you are aware of.
+
+### Write an announcement mail to the Ozone mailing lists
+
+Include the following links:
+
+ * Release notes: [https://ozone.apache.org/release/1.2.0/](https://ozone.apache.org/release/1.2.0/). Replace the version in the URL with the version being released.
+ * Download link: [https://ozone.apache.org/downloads/](https://ozone.apache.org/downloads/)
+ * Link to versioned documentation: [https://ozone.apache.org/docs/](https://ozone.apache.org/docs/)
+
+### Publish a docker image for the release
+
+The Ozone docker image is intended for testing purposes only, not production use. Therefore, it is ok to update this after announcing the release. An example pull request to update the docker image is [here](https://github.com/apache/ozone-docker/pull/22/files). The target branch for your pull request should be `latest`. After the pull request is merged, it can be published to docker hub by fast-forwarding the `ozone-latest` branch to match the `latest` branch. Also, create a new branch named like `ozone-1.5.0` (replace the version) and push it to [GitHub](https://github.com/apache/ozone-docker).
+
+```bash
+git checkout ozone-latest
+git pull
+git merge --ff-only origin/latest
+git checkout -b "ozone-$VERSION"
+git push origin ozone-latest "ozone-$VERSION"
+```
+
+## Patch Release
+
+If there is a security vulnerability or critical bug uncovered in a major or minor Ozone release, a patch release may be necessary to fix this. The process is a bit simpler than a major or minor release, since there is already a solid foundation on the release's maintenance branch.
+
+ 1. Cherry pick the fix(es) on to the maintenance branch. For example, for Ozone's 1.2.0 release, this is the branch called ozone-1.2.
+ 2. Run all steps from the sections **Update the versions** through **Publish a docker image for the release**, with the following modifications:
+ * Do not update the protolock files unless protocol buffers were changed as part of the fix.
+ * When updating the website, all instances of the original major/minor release should be replaced with this patch version, since we do not want users downloading the original release anymore.
+ * For example, any website text referring to 1.2.0 should be changed to refer to 1.2.1.
+ * Continuing the 1.2.0 → 1.2.1 example, the release/1.2.0 page should redirect to release/1.2.1.
+ * An example pull request to do this is [here](https://github.com/apache/ozone-site/pull/23).
+ * The docs can be added to the website normally as described above in **Update the ozone website**. The docs link for the original major/minor release can remain alongside the docs link for the patch release.
+
+In the event of a critical security vulnerability or seriously harmful bug with a small set of changes in the patch, PMC members may vote to forgo the usual 72 hour minimum time for a release vote and publish once there are enough binding +1s.
+
+Remove the previous patch release from Apache distribution site:
Review Comment:
```suggestion
3. Remove the previous release from the Apache distribution site:
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
Review Comment:
nit. Lets try to keep spacing around headers consistent
```suggestion
### Calculate the checksum and sign the artifacts
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
Review Comment:
We might want to specify the list of protolock files present in Ozone and what part of the system they correspond to in order to help release managers realize a lock file update was missed. I know we had problems with this in the last release.
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
Review Comment:
Keeping the header names formatted as commands makes the mini-map read like an instruction manual. All other headings are in this form except this one.
```suggestion
### Create a Release Branch
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
+Before uploading the artifacts, run some basic tests on them, similar to what other devs will run before voting in favor of the release.
+
+ 1. Extract the contents of the source tarball and build it with an empty maven cache by renaming your `~/.m2` directory before doing the build.
+ 2. Check the size of the output binary tarball for significant size increase from the last release.
+ * A significant increase in size could indicate a dependency issue that needs to be fixed.
+ * The Apache svn repo has a size limit for release artifacts. If uploading svn fails because the tarball is too big, we need to contact INFRA to increase our repo size. [See here for details.](https://issues.apache.org/jira/browse/INFRA-23892)
+ 3. Verify signatures
+ * Download the KEYS file from [https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+ * Import its contents (which should include your public gpg key): `gpg --import KEYS`
+ * Verify each .tar.gz artifact: `gpg --verify <artifact>.tar.gz.asc <artifact>.tar.gz`
+ 4. Verify checksums
+ * Run `shasum -a 512 *.tar.gz`
+ * Verify that the output checksums for each artifact match the contents of its .sha512 file and the SHA512 line in its .mds file.
+ 5. Make sure docs are present in the release tarball
+ * There should be a directory called docs in the top level. If there is not, then `hugo` was not installed during the build and it must be re-done.
+ * Extract the release and open docs/index.html in your web browser, and check that the documentation website looks ok.
+ 6. Check the output of running `bin/ozone version` from the extracted release tarball
+ * After extracting the release, the output of this command should contain:
+ * The correct release
+ * The correct national park tag
+ * A non-snapshot version of Ratis.
+ * A link to the apache/ozone GitHub repository (not your fork).
+ * The git hash of the last commit the release was built on.
+ 7. Run the Ozone upgrade acceptance tests by running `test.sh` from the compose/upgrade directory in the extracted release tarball.<br />
+ * This check is also run by the GitHub actions CI for each commit, so it should pass with no surprises.
+
+### Upload the artifacts dev staging area
+
+ * Upload everything from the `$RELEASE_DIR` to the dev staging area.
+
+```bash title="Upload artifacts to staging"
+svn mkdir https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+svn co https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+cp "$RELEASE_DIR"/* "$VERSION-rc$RC"
+cd "$VERSION-rc$RC"
+svn add *
+svn commit -m "Ozone $VERSION RC$RC"
+```
+
+ * Check the results using your browser by connecting to [https://dist.apache.org/repos/dist/dev/ozone/](https://dist.apache.org/repos/dist/dev/ozone/)
+### Upload the artifacts to the apache nexus
+
+Double check if your apache credentials are added to your local ~/.m2/settings.xml
+
+```xml
+<settings>
+ <servers>
+ <server>
+ <id>apache.snapshots.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ <!-- To stage a release of some part of Maven -->
+ <server>
+ <id>apache.staging.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ </servers>
+</settings>
+```
+
+Return to your Ozone repository being used for the release, and run the following command:
+
+```bash title="Upload Release Artifacts"
+mvn deploy -Psign -pl '!:ozone-dist' -DskipTests -Dbuildhelper.skipAttach
+```
+
+Go to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories) and **close** the newly created orgapacheozone repository.
+
+### Push the release candidate tag to github
+
+```bash title="Push the tag"
+git push origin "ozone-$VERSION-RC$RC"
+```
+
+## Vote
+
+### Send the voting mail to below mailing list
+
+dev@ozone <dev@ozone.apache.org>
+Include the following items in the email:
+
+ * Link to the release candidate tag on Github
+ * Link to a Jira query showing all resolved issues for this release. Something like [this](https://issues.apache.org/jira/issues/?jql=project%20%3D%20HDDS%20AND%20status%20in%20(Resolved%2C%20Closed)%20AND%20fixVersion%20%3D%201.4.0).
+ * Location of the source and binary tarballs. This link will look something like [https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/](https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/)
+ * Location where the maven artifacts are staged. This link will look something like [https://repository.apache.org/content/repositories/orgapacheozone-1001/](https://repository.apache.org/content/repositories/orgapacheozone-1001/)
+ * Link to the public key used to sign the artifacts. This should always be in the KEYS file and you can just link to that: [https://dist.apache.org/repos/dist/dev/ozone/KEYS](https://dist.apache.org/repos/dist/dev/ozone/KEYS)
+ * Fingerprint of the key used to sign the artifacts.
+
+If no issues are found with the artifacts, let the vote run for 7 days. Review [https://www.apache.org/legal/release-policy.html#release-approval](https://www.apache.org/legal/release-policy.html#release-approval) for the ASF wide release voting policy. Note what is required of binding voters, and that binding votes can only come from PMC members. Sometimes responders will not specify whether or not their vote is binding. If in doubt check [https://people.apache.org/committer-index.htm](https://people.apache.org/committer-index.html)l. Users whose group membership includes ozone-pmc can cast binding votes.
+
+Once voting is finished, send an email summarizing the results (binding +1s, non-binding +1s, -1s, 0s) and, if the vote passed, indicate that the release artifacts will be published. If an issue is found with the artifacts, apply fixes to the release branch and repeat the steps starting from **tagging the commit for the release candidate** with the $RC variable incremented by 1 for all steps.
+
+## After-Vote
+
+### Publish the artifacts
+
+You should commit the artifacts to the SVN repository. If you are not a PMC member you can commit it to the dev zone first and ask a PMC for the final move.
+
+Checkout the svn folder &commit the artifacts to a new directory.
+
+```
+svn checkout https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+svn mkdir "$VERSION"
+cp "$RELEASE_DIR"/* "$VERSION"/
+svn add "$VERSION"/*
+svn commit -m "Added ozone-$VERSION directory"
+```
+
+PMC members can move it to the final location:
+
+```
+svn mv -m "commit msg" https://dist.apache.org/repos/dist/dev/ozone/"$VERSION" https://dist.apache.org/repos/dist/release/ozone/"$VERSION"
+```
+
+To publish the artifacts to the central maven, login to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories)[,](https://repository.apache.org,) select your **staging** repository and **release** it.
+
+### Write a haiku
+
+Check the tag from the [Ozone Roadmap](https://cwiki.apache.org/confluence/display/OZONE/Ozone+Roadmap) page (it's a national park).
+Find a photo which is under the CC license.
+Write a haiku to the photo with Future font.
+
+### Update the ozone website
+
+ * Create release notes and add them to the Ozone website with your haiku image. An example pull request showing how to do this is [here](https://github.com/apache/ozone-site/pull/17). Note that the target branch is `master`.
+ * Extract the docs folder from the release tarball, and add its contents to the website. An example pull request for this is [here](https://github.com/apache/ozone-site/pull/18). Note that the target branch is `asf-site` , and that the docs/current symlink has been updated to point to the latest release's directory.
+ * Test the website locally by running `hugo serve` from the repository root with the master branch checked out. Check that links for the new release are working. Links to the documentation will not work until the PR to the `asf-site` branch is merged.
+
+### Add the final git tag and push it
+
+```bash title="Add final release tag"
+git checkout "ozone-$VERSION-RC$RC"
+git tag -s "ozone-$VERSION" -m "Ozone $VERSION release"
+git push origin "ozone-$VERSION"
+```
+
+### Update the master branch
+
+ * Cherry pick your commit updating the protolock files to a branch on your fork, and merge it to master with a pull request.
+ * Update the Ozone SNAPSHOT version and national park tag on master with a pull request. Here you will pick the [national park](https://en.wikipedia.org/wiki/List_of_national_parks_of_the_United_States) to use for the next release of Ozone and set it in the project's top level pom at <ozone.release>. [Example](https://github.com/apache/ozone/pull/2863)
+
+### Update the Ozone Roadmap
+
+ * Update the [Ozone Roadmap](https://cwiki.apache.org/confluence/display/OZONE/Ozone+Roadmap) so that the release notes for the just completed release are correct.
+ * Move its row to the `Past Releases` section.
+ * Create a row for the next release in the `Upcoming Releases` section, and add planned features that you are aware of.
+
+### Write an announcement mail to the Ozone mailing lists
+
+Include the following links:
+
+ * Release notes: [https://ozone.apache.org/release/1.2.0/](https://ozone.apache.org/release/1.2.0/). Replace the version in the URL with the version being released.
+ * Download link: [https://ozone.apache.org/downloads/](https://ozone.apache.org/downloads/)
+ * Link to versioned documentation: [https://ozone.apache.org/docs/](https://ozone.apache.org/docs/)
+
+### Publish a docker image for the release
+
+The Ozone docker image is intended for testing purposes only, not production use. Therefore, it is ok to update this after announcing the release. An example pull request to update the docker image is [here](https://github.com/apache/ozone-docker/pull/22/files). The target branch for your pull request should be `latest`. After the pull request is merged, it can be published to docker hub by fast-forwarding the `ozone-latest` branch to match the `latest` branch. Also, create a new branch named like `ozone-1.5.0` (replace the version) and push it to [GitHub](https://github.com/apache/ozone-docker).
Review Comment:
We may want to divide the CLI commands under these two steps as well.
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
+Before uploading the artifacts, run some basic tests on them, similar to what other devs will run before voting in favor of the release.
+
+ 1. Extract the contents of the source tarball and build it with an empty maven cache by renaming your `~/.m2` directory before doing the build.
+ 2. Check the size of the output binary tarball for significant size increase from the last release.
+ * A significant increase in size could indicate a dependency issue that needs to be fixed.
+ * The Apache svn repo has a size limit for release artifacts. If uploading svn fails because the tarball is too big, we need to contact INFRA to increase our repo size. [See here for details.](https://issues.apache.org/jira/browse/INFRA-23892)
+ 3. Verify signatures
+ * Download the KEYS file from [https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+ * Import its contents (which should include your public gpg key): `gpg --import KEYS`
+ * Verify each .tar.gz artifact: `gpg --verify <artifact>.tar.gz.asc <artifact>.tar.gz`
+ 4. Verify checksums
+ * Run `shasum -a 512 *.tar.gz`
+ * Verify that the output checksums for each artifact match the contents of its .sha512 file and the SHA512 line in its .mds file.
+ 5. Make sure docs are present in the release tarball
+ * There should be a directory called docs in the top level. If there is not, then `hugo` was not installed during the build and it must be re-done.
+ * Extract the release and open docs/index.html in your web browser, and check that the documentation website looks ok.
+ 6. Check the output of running `bin/ozone version` from the extracted release tarball
+ * After extracting the release, the output of this command should contain:
+ * The correct release
+ * The correct national park tag
+ * A non-snapshot version of Ratis.
+ * A link to the apache/ozone GitHub repository (not your fork).
+ * The git hash of the last commit the release was built on.
+ 7. Run the Ozone upgrade acceptance tests by running `test.sh` from the compose/upgrade directory in the extracted release tarball.<br />
+ * This check is also run by the GitHub actions CI for each commit, so it should pass with no surprises.
+
+### Upload the artifacts dev staging area
+
+ * Upload everything from the `$RELEASE_DIR` to the dev staging area.
+
+```bash title="Upload artifacts to staging"
+svn mkdir https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+svn co https://dist.apache.org/repos/dist/dev/ozone/"$VERSION-rc$RC"
+cp "$RELEASE_DIR"/* "$VERSION-rc$RC"
+cd "$VERSION-rc$RC"
+svn add *
+svn commit -m "Ozone $VERSION RC$RC"
+```
+
+ * Check the results using your browser by connecting to [https://dist.apache.org/repos/dist/dev/ozone/](https://dist.apache.org/repos/dist/dev/ozone/)
+### Upload the artifacts to the apache nexus
+
+Double check if your apache credentials are added to your local ~/.m2/settings.xml
+
+```xml
+<settings>
+ <servers>
+ <server>
+ <id>apache.snapshots.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ <!-- To stage a release of some part of Maven -->
+ <server>
+ <id>apache.staging.https</id>
+ <username>your_apache_id</username>
+ <password>your_apache_password</password>
+ </server>
+ </servers>
+</settings>
+```
+
+Return to your Ozone repository being used for the release, and run the following command:
+
+```bash title="Upload Release Artifacts"
+mvn deploy -Psign -pl '!:ozone-dist' -DskipTests -Dbuildhelper.skipAttach
+```
+
+Go to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories) and **close** the newly created orgapacheozone repository.
+
+### Push the release candidate tag to github
+
+```bash title="Push the tag"
+git push origin "ozone-$VERSION-RC$RC"
+```
+
+## Vote
+
+### Send the voting mail to below mailing list
+
+dev@ozone <dev@ozone.apache.org>
+Include the following items in the email:
+
+ * Link to the release candidate tag on Github
+ * Link to a Jira query showing all resolved issues for this release. Something like [this](https://issues.apache.org/jira/issues/?jql=project%20%3D%20HDDS%20AND%20status%20in%20(Resolved%2C%20Closed)%20AND%20fixVersion%20%3D%201.4.0).
+ * Location of the source and binary tarballs. This link will look something like [https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/](https://dist.apache.org/repos/dist/dev/ozone/1.2.0-rc0/)
+ * Location where the maven artifacts are staged. This link will look something like [https://repository.apache.org/content/repositories/orgapacheozone-1001/](https://repository.apache.org/content/repositories/orgapacheozone-1001/)
+ * Link to the public key used to sign the artifacts. This should always be in the KEYS file and you can just link to that: [https://dist.apache.org/repos/dist/dev/ozone/KEYS](https://dist.apache.org/repos/dist/dev/ozone/KEYS)
+ * Fingerprint of the key used to sign the artifacts.
+
+If no issues are found with the artifacts, let the vote run for 7 days. Review [https://www.apache.org/legal/release-policy.html#release-approval](https://www.apache.org/legal/release-policy.html#release-approval) for the ASF wide release voting policy. Note what is required of binding voters, and that binding votes can only come from PMC members. Sometimes responders will not specify whether or not their vote is binding. If in doubt check [https://people.apache.org/committer-index.htm](https://people.apache.org/committer-index.html)l. Users whose group membership includes ozone-pmc can cast binding votes.
+
+Once voting is finished, send an email summarizing the results (binding +1s, non-binding +1s, -1s, 0s) and, if the vote passed, indicate that the release artifacts will be published. If an issue is found with the artifacts, apply fixes to the release branch and repeat the steps starting from **tagging the commit for the release candidate** with the $RC variable incremented by 1 for all steps.
+
+## After-Vote
+
+### Publish the artifacts
+
+You should commit the artifacts to the SVN repository. If you are not a PMC member you can commit it to the dev zone first and ask a PMC for the final move.
+
+Checkout the svn folder &commit the artifacts to a new directory.
+
+```
+svn checkout https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+svn mkdir "$VERSION"
+cp "$RELEASE_DIR"/* "$VERSION"/
+svn add "$VERSION"/*
+svn commit -m "Added ozone-$VERSION directory"
+```
+
+PMC members can move it to the final location:
+
+```
+svn mv -m "commit msg" https://dist.apache.org/repos/dist/dev/ozone/"$VERSION" https://dist.apache.org/repos/dist/release/ozone/"$VERSION"
+```
+
+To publish the artifacts to the central maven, login to [https://repository.apache.org/#stagingRepositories](https://repository.apache.org/#stagingRepositories)[,](https://repository.apache.org,) select your **staging** repository and **release** it.
+
+### Write a haiku
+
+Check the tag from the [Ozone Roadmap](https://cwiki.apache.org/confluence/display/OZONE/Ozone+Roadmap) page (it's a national park).
+Find a photo which is under the CC license.
+Write a haiku to the photo with Future font.
+
+### Update the ozone website
+
+ * Create release notes and add them to the Ozone website with your haiku image. An example pull request showing how to do this is [here](https://github.com/apache/ozone-site/pull/17). Note that the target branch is `master`.
+ * Extract the docs folder from the release tarball, and add its contents to the website. An example pull request for this is [here](https://github.com/apache/ozone-site/pull/18). Note that the target branch is `asf-site` , and that the docs/current symlink has been updated to point to the latest release's directory.
+ * Test the website locally by running `hugo serve` from the repository root with the master branch checked out. Check that links for the new release are working. Links to the documentation will not work until the PR to the `asf-site` branch is merged.
+
+### Add the final git tag and push it
+
+```bash title="Add final release tag"
+git checkout "ozone-$VERSION-RC$RC"
+git tag -s "ozone-$VERSION" -m "Ozone $VERSION release"
+git push origin "ozone-$VERSION"
+```
+
+### Update the master branch
+
+ * Cherry pick your commit updating the protolock files to a branch on your fork, and merge it to master with a pull request.
+ * Update the Ozone SNAPSHOT version and national park tag on master with a pull request. Here you will pick the [national park](https://en.wikipedia.org/wiki/List_of_national_parks_of_the_United_States) to use for the next release of Ozone and set it in the project's top level pom at <ozone.release>. [Example](https://github.com/apache/ozone/pull/2863)
+
+### Update the Ozone Roadmap
+
+ * Update the [Ozone Roadmap](https://cwiki.apache.org/confluence/display/OZONE/Ozone+Roadmap) so that the release notes for the just completed release are correct.
+ * Move its row to the `Past Releases` section.
+ * Create a row for the next release in the `Upcoming Releases` section, and add planned features that you are aware of.
+
+### Write an announcement mail to the Ozone mailing lists
+
+Include the following links:
+
+ * Release notes: [https://ozone.apache.org/release/1.2.0/](https://ozone.apache.org/release/1.2.0/). Replace the version in the URL with the version being released.
+ * Download link: [https://ozone.apache.org/downloads/](https://ozone.apache.org/downloads/)
+ * Link to versioned documentation: [https://ozone.apache.org/docs/](https://ozone.apache.org/docs/)
+
+### Publish a docker image for the release
+
+The Ozone docker image is intended for testing purposes only, not production use. Therefore, it is ok to update this after announcing the release. An example pull request to update the docker image is [here](https://github.com/apache/ozone-docker/pull/22/files). The target branch for your pull request should be `latest`. After the pull request is merged, it can be published to docker hub by fast-forwarding the `ozone-latest` branch to match the `latest` branch. Also, create a new branch named like `ozone-1.5.0` (replace the version) and push it to [GitHub](https://github.com/apache/ozone-docker).
+
+```bash
+git checkout ozone-latest
+git pull
+git merge --ff-only origin/latest
+git checkout -b "ozone-$VERSION"
+git push origin ozone-latest "ozone-$VERSION"
+```
+
+## Patch Release
+
+If there is a security vulnerability or critical bug uncovered in a major or minor Ozone release, a patch release may be necessary to fix this. The process is a bit simpler than a major or minor release, since there is already a solid foundation on the release's maintenance branch.
+
+ 1. Cherry pick the fix(es) on to the maintenance branch. For example, for Ozone's 1.2.0 release, this is the branch called ozone-1.2.
+ 2. Run all steps from the sections **Update the versions** through **Publish a docker image for the release**, with the following modifications:
+ * Do not update the protolock files unless protocol buffers were changed as part of the fix.
+ * When updating the website, all instances of the original major/minor release should be replaced with this patch version, since we do not want users downloading the original release anymore.
+ * For example, any website text referring to 1.2.0 should be changed to refer to 1.2.1.
+ * Continuing the 1.2.0 → 1.2.1 example, the release/1.2.0 page should redirect to release/1.2.1.
Review Comment:
nit. Just removing the special symbol for simplicity.
```suggestion
* Continuing the 1.2.0 to 1.2.1 example, the release/1.2.0 page should redirect to release/1.2.1.
```
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
-Port from confluence
+## Pre-Requisite
+
+The release manager should have a gpg key setup to sign the artifacts. For more details refer to below link.
+[https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys](https://www.apache.org/dev/new-committers-guide.html#set-up-security-and-pgp-keys)
+
+## Publish your key
+
+The key is supposed to be published together with the release. Please append it to the end of KEYS files:<br /><br />[https://dist.apache.org/repos/dist/release/ozone/KEYS](https://dist.apache.org/repos/dist/release/ozone/KEYS)
+
+```bash title="Publish key (committer)"
+svn co https://dist.apache.org/repos/dist/release/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+In case you are only a committer and not a PMC member, you can add your key to the dev KEYS file and a PMC can move it to the final destination
+
+```bash title="Move key (PMC)"
+#use latest KEYS as the base
+svn rm https://dist.apache.org/repos/dist/dev/ozone/KEYS
+svn cp https://dist.apache.org/repos/dist/release/ozone/KEYS https://dist.apache.org/repos/dist/dev/ozone/KEYS
+
+svn co https://dist.apache.org/repos/dist/dev/ozone
+cd ozone
+export CODESIGNINGKEY=your_gpg_key_id
+gpg --list-sigs $CODESIGNINGKEY >> KEYS
+gpg --armor --export $CODESIGNINGKEY >> KEYS
+svn commit -m "ozone: adding key of XXXX to the KEYS"
+```
+
+## Pre-Vote
+
+### Create a parent Jira for the release
+
+This provides visibility into the progress of the release for the community. Tasks mentioned in this guide like cherry-picking fixes on to the release branch, updating the ozone website, publishing the docker image, etc can be added as subtasks.
+
+### Bulk comment on Jiras targeting this release
+
+Issue a Jira query like [this](https://issues.apache.org/jira/browse/HDDS-4183?jql=project%20%3D%20HDDS%20AND%20resolution%20%3D%20Unresolved%20AND%20(cf%5B12310320%5D%20%3D%201.3.0%20OR%20fixVersion%20%3D%201.3.0)%20ORDER%20BY%20priority%20DESC%2C%20updated%20DESC), modified for the release number you are working with, to find all unresolved Jiras that have the target version field set to this release. Note that some people incorrectly use Fix Version as the Target Version, so Fix Version is included in this search. Use the following steps to issue a bulk update to these Jiras:
+
+ 1. In the top right corner, click `Tools` and under `Bulk Change` , select `all ... issues`.
+ 2. Click the top check box to select all the issues. Click `Next`.
+ 3. Select `Edit Issues` , then click `Next`.
+ 4. Select `Change Fix Version/s` , and in the drop down select `Clear field`.
+ :::note
+ This corrects unresolved issues which incorrectly set a fix version for this release.
+ 5. Select `Change Target Version/s`, and enter the version of the release after the one you are managing.
+ 6. Select `Change Comment`, and add a comment saying that you have moved the release field out, but if the issue is being actively worked on, is close to completion, and would like to be included in this release, to contact you by a given date, probably a week in the future.
+ :::note
+ Even though the action is called `Change Comment`, it actually adds a comment to the Jira and does not affect existing comments.
+ 7. Keep clicking through until the operation is started. It may take a while for Jira to finish the bulk update once it is started.
+
+### Branching
+
+After the date specified in the Jira comments has passed and blocking issues have been resolved, you can create a release branch in the main apache/ozone github repo. Name the branch after the major and minor version of the release, so patch releases can also be done off this branch. For example, If releasing 1.2.0, create a branch called `ozone-1.2` . All release related changes will go to this branch until the release is complete, after which some changes mentioned below will be cherry picked to `master`.
+
+### Set up local environment
+
+The following variables will be referenced in commands.
+
+```bash title="Export Vars"
+export VERSION=1.1.0 # Set to the version of ozone being released.
+export RELEASE_DIR=~/ozone-release/ # ozone-release needs to be created
+export CODESIGNINGKEY=<your_gpg_key_id>
+export RC=0 # Set to the number of the current release candidate, starting at 0.
+```
+
+It is probably best to clone a fresh ozone repository locally to work on the release, and leave your existing repository intact for dev tasks you may be working on simultaneously. After cloning, make sure the apache/ozone upstream repo is named `origin`. This is required for release build metadata to be correctly populated. Assume all following commands are executed from within this repo with your release branch checked out.
+
+### Reset the git repository
+
+```bash title="Reset the Git Repo"
+git reset --hard
+git clean -dfx
+```
+
+### Update the versions
+
+Use below command or use IDE to replace "$VERSION-SNAPSHOT" with "$VERSION".
+
+import Tabs from '@theme/Tabs';
+import TabItem from '@theme/TabItem';
+
+<Tabs>
+<TabItem value="linux" label="Linux">
+```bash title="Update the Versions"
+find . -name pom.xml -type f | xargs sed -i "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+<TabItem value="mac" label="Mac">
+```bash title="Update the Versions (Mac)"
+find . -name pom.xml -type f -print0 | xargs -0 sed -i '' "s/$VERSION-SNAPSHOT/$VERSION/g"
+```
+</TabItem>
+</Tabs>
+
+### Commit the changes
+
+```bash title="Commit the version changes "
+git commit -am "Update Ozone version to $VERSION"
+```
+
+### Build and commit the proto.lock change
+
+Protolock files are used to check backwards compatibility of protocol buffers between releases. The ozone build checks protocol buffers against these lock files and fails if an incompatibility is detected. They should be updated for each release, and require [protolock](https://github.com/nilslice/protolock) to be installed. Save and run the following script from your ozone repo root, and then commit the changed files to git. Double check that only files called proto.lock are being committed, and that the changes to the files makes sense based on new features added in this release.
+
+```bash title="update_protolocks.sh"
+#!/usr/bin/env sh
+
+for lock in $(find . -name proto.lock); do
+ lockdir="$(dirname "$lock")"
+ protoroot="$lockdir"/../proto
+ if protolock status --lockdir="$lockdir" --protoroot="$protoroot"; then
+ protolock commit --lockdir="$lockdir" --protoroot="$protoroot"
+ else
+ echo "protolock update failed for $protoroot"
+ fi
+done
+```
+
+```bash title="Build and commit the proto.lock change"
+git commit -m "update proto.lock for Ozone $VERSION"
+```
+
+### Tag the commit for the release candidate
+
+This will sign the tag with the gpg key matching the git mailing address. Make sure that the email given by git config user.email matches the email for the key you want to use shown by `gpg --list-secret-keys`.
+
+```bash title="Tag the Release"
+git tag -s "ozone-$VERSION-RC$RC"
+```
+
+If the command fails on MacOS, you may need to do the following additional steps:
+ * Install a program to prompt you for your gpg key passphrase (example using homebrew): `brew install pinentry-mac`
+ * Tell git to use this program for signing:`git config --global gpg.program "$(which gpg)"`
+ * Tell git which key to sign with: `git config --global user.signingKey <gpg_key_id>`
+ * Tell gpg to use this program to prompt for passphrase: `echo "pinentry-program $(which pinentry-mac)" > ~/.gnupg/gpg-agent.conf`
+ * Reload gpg-agent: `gpgconf --kill gpg-agent`
+
+### Create the release artifacts
+
+ * Run rat check and ensure there are no failures.
+ ```bash title="Run RAT Check"
+ ./hadoop-ozone/dev-support/checks/rat.sh
+ ```
+ * Clean the Repo of all Rat output
+ ```bash title="Reset the Git Repo"
+ git reset --hard
+ git clean -dfx
+ ```
+ * Build the Release Tarballs. Make sure that [Hugo](https://gohugo.io/) is installed so that this step will also build the documentation. Also make sure you are using GNU-tar instead of BSD-tar.
+ ```bash title="Build Ozone"
+ mvn clean install -Dmaven.javadoc.skip=true -DskipTests -Psign,dist,src -Dtar -Dgpg.keyname="$CODESIGNINGKEY"
+ ```
+ * Now that we have built the release artifacts, we will copy them to the release directory.
+ ```bash title="Copy to Release Directory"
+ cp hadoop-ozone/dist/target/ozone-*.tar.gz "$RELEASE_DIR"/
+ ```
+
+### Calculate the checksum and sign the artifacts
+```bash
+cd "$RELEASE_DIR"
+for i in $(ls -1 *.tar.gz); do gpg -u "$CODESIGNINGKEY" --armor --output "$i.asc" --detach-sig "$i"; done
+
+for i in $(ls -1 *.tar.gz); do sha512sum "$i" > "$i.sha512"; done
+
+for i in $(ls -1 *.tar.gz); do gpg --print-mds "$i" > "$i.mds"; done
+```
+Now each .tar.gz file should have an associated .mds file, .asc file, and .sha512 file
+### Check the artifacts
Review Comment:
```suggestion
### Check the artifacts
```
--
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For queries about this service, please contact Infrastructure at:
users@infra.apache.org
---------------------------------------------------------------------
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For additional commands, e-mail: issues-help@ozone.apache.org
Re: [PR] HDDS-10233. Apache Release Manager Guide [ozone-site]
Posted by "symious (via GitHub)" <gi...@apache.org>.
symious commented on PR #66:
URL: https://github.com/apache/ozone-site/pull/66#issuecomment-1916229615
LGTM with the no-change switch.
--
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For queries about this service, please contact Infrastructure at:
users@infra.apache.org
---------------------------------------------------------------------
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For additional commands, e-mail: issues-help@ozone.apache.org
Re: [PR] HDDS-10233. Apache Release Manager Guide [ozone-site]
Posted by "adoroszlai (via GitHub)" <gi...@apache.org>.
adoroszlai commented on PR #66:
URL: https://github.com/apache/ozone-site/pull/66#issuecomment-1919501837
Content from this PR is now available in the staging site.
--
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For queries about this service, please contact Infrastructure at:
users@infra.apache.org
---------------------------------------------------------------------
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For additional commands, e-mail: issues-help@ozone.apache.org
Re: [PR] HDDS-10233. Apache Release Manager Guide [ozone-site]
Posted by "symious (via GitHub)" <gi...@apache.org>.
symious commented on PR #66:
URL: https://github.com/apache/ozone-site/pull/66#issuecomment-1915919413
@errose28 Thank you for the explaination. Looks good to me to use Github as the standard.
--
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For queries about this service, please contact Infrastructure at:
users@infra.apache.org
---------------------------------------------------------------------
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For additional commands, e-mail: issues-help@ozone.apache.org
Re: [PR] HDDS-10233. Apache Release Manager Guide [ozone-site]
Posted by "adoroszlai (via GitHub)" <gi...@apache.org>.
adoroszlai commented on code in PR #66:
URL: https://github.com/apache/ozone-site/pull/66#discussion_r1470775995
##########
docs/08-developer-guide/04-project/03-release-guide.md:
##########
@@ -4,6 +4,372 @@ sidebar_label: Release Manager Guide
# Apache Release Manager Guide
-**TODO:** File a subtask under [HDDS-9861](https://issues.apache.org/jira/browse/HDDS-9861) and complete this page or section.
+This document describes the process to release Apache Ozone. The process is not yet scripted, and the documentation is **a work in progress**
Review Comment:
I prefer to keep "scripted".
As an example of the difference: the release process of Ratis is partly scripted, but not automated. The release manager can use a script named `make_rc.sh` to perform parts of the process. The steps are still separate, as the RM needs to verify the result of each step manually.
In contrast, this guide for releasing Ozone has several steps with code blocks that the RM needs to copy and tweak. So it's not even scripted. (We can improve that in the future.)
--
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For queries about this service, please contact Infrastructure at:
users@infra.apache.org
---------------------------------------------------------------------
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For additional commands, e-mail: issues-help@ozone.apache.org
Re: [PR] HDDS-10233. Apache Release Manager Guide [ozone-site]
Posted by "adoroszlai (via GitHub)" <gi...@apache.org>.
adoroszlai commented on PR #66:
URL: https://github.com/apache/ozone-site/pull/66#issuecomment-1916225573
Thanks @errose28, @symious for the reviews so far.
I fully support further reviewing and improving the contents of this guide (and other pages to be ported). I also have a couple of items in mind for that. However, I suggest making improvements over the original content in follow-up PR(s). Both Confluence Wiki and Git can show history of changes, but we cannot diff between states in CWiki and Git. All content added here will be seen as one initial commit for this page.
For the same reason, I don't think we should keep the CWiki page as is (or even improved in the future). Keeping both pages alive will be a pain. Especially if we start making improvements to the website content in follow-up PRs (or even in this PR). I would add a warning at the top of the cwiki page to direct readers to the specific page on the new website. The site may be in progress, but the same is true for cwiki. I don't see any problem exposing the staged website to the audience of the cwiki.
Summary of the process I suggest:
1. port contents as is (adapt formatting from cwiki to mdx)
2. edit original page to link to the website
3. improve in follow-up PRs
This applies to pages that are 1:1 ported from cwiki or other "remote" source. For pages curated from various sources, we should combine steps 1 and 3, since the content will be new anyway.
--
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For queries about this service, please contact Infrastructure at:
users@infra.apache.org
---------------------------------------------------------------------
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org