You are viewing a plain text version of this content. The canonical link for it is here.
Posted to yarn-dev@hadoop.apache.org by "Yufei Gu (JIRA)" <ji...@apache.org> on 2016/10/24 21:09:58 UTC
[jira] [Created] (YARN-5774) A wrong parameter is passed when
normalizing resource requests
Yufei Gu created YARN-5774:
------------------------------
Summary: A wrong parameter is passed when normalizing resource requests
Key: YARN-5774
URL: https://issues.apache.org/jira/browse/YARN-5774
Project: Hadoop YARN
Issue Type: Bug
Components: resourcemanager
Affects Versions: 3.0.0-alpha1
Reporter: Yufei Gu
Assignee: Yufei Gu
{code}
SchedulerUtils.normalizeRequest(amReq, scheduler.getResourceCalculator(),
scheduler.getClusterResource(),
scheduler.getMinimumResourceCapability(),
scheduler.getMaximumResourceCapability(),
scheduler.getMinimumResourceCapability()); --> incrementResource should be passed here.
{code}
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)
---------------------------------------------------------------------
To unsubscribe, e-mail: yarn-dev-unsubscribe@hadoop.apache.org
For additional commands, e-mail: yarn-dev-help@hadoop.apache.org