Re: Features for 0.8 release

Hi All,

Are we good to announce feature freeze and concentrate on more bug fixes ?
If we do the feature freeze soon, we will be able to release on time.

6 week release cycle finishes end of May !

Amila and Saminda, do you have any comments on the features posted in this
thread ?

Regards
Lahiru


On Fri, Apr 19, 2013 at 9:50 AM, Saminda Wijeratne <sa...@gmail.com>wrote:

> Got it Suresh... Will do surely next week... I'm a little tied up at the
> moment...
>
>
> On Fri, Apr 19, 2013 at 6:39 AM, Suresh Marru <sm...@apache.org> wrote:
>
> > Saminda,
> >
> > This is great to hear and since it will not be included in 0.8, we don't
> > need to discuss in detail now. But, once you have a prototype, before you
> > go too far with the full implementation, please discuss the design on the
> > list.
> >
> > Raman,
> >
> > I would still suggest to follow the release time line and not keep the
> > feature additions open ended through the release cycle. So please add all
> > improvements which needs to go into 0.8 within the first two weeks. Lets
> > avoid adding any new feature or API additions after this period. We all
> > need to work within this time line, so we can ensure the releases happen
> > within 6 weeks and more importantly the code is well tested.
> >
> > Suresh
> >
> > On Apr 18, 2013, at 5:58 PM, Saminda Wijeratne <sa...@gmail.com>
> wrote:
> >
> > > Hi Lahiru,,
> > >
> > > I'm going to work on a prototype workflow engine for Airavata. While it
> > > will not go in to the 0.8 release, I will be making changes in the code
> > to
> > > allow future transition from current workflow interpreter to this
> > prototype
> > > workflow engine to allow prototype testing (which is again not part of
> > 0.8
> > > release) without affecting any of the 0.8 functionality.
> > >
> > > Thanks,
> > > Saminda
> > >
> > >
> > > On Thu, Apr 18, 2013 at 4:52 PM, Raminder Singh <
> > raminderjsingh@gmail.com>wrote:
> > >
> > >> Hi Lahiru,
> > >>
> > >> I am working on migrating Ultrascan to Airavata. I may find bugs or
> > >> improvements in the existing code during the process. I don't have any
> > new
> > >> feature request but want to give you heads up about the changes
> > expected. I
> > >> am marking most of the defects under 0.8 and will make sure to update
> > the
> > >> fixed version as 0.8. I will be able to provide the list of JIRA
> before
> > the
> > >> testing.
> > >>
> > >> Thanks
> > >> Raminder
> > >>
> > >> On Apr 18, 2013, at 12:52 PM, Lahiru Gunathilake wrote:
> > >>
> > >>> Hi Amila,
> > >>>
> > >>> Please create Jiras for each feature and set the fixed version for
> 0.8
> > >> and
> > >>> please post those jira urls here. So we are good to do testing once
> we
> > >> have
> > >>> resolved all the issue for 0.8 posted here (there are multiple 0.8
> > fixed
> > >>> version issues created sometimes back).
> > >>>
> > >>>
> > >>> On Thu, Apr 18, 2013 at 12:49 PM, Amila Jayasekara
> > >>> <th...@gmail.com>wrote:
> > >>>
> > >>>> 1. Credential Store
> > >>>> 2. Ability to communicate over HTTPS (Was this fixed in last release
> > ?)
> > >>>> If I recall the issue, we had problems saving https URL in registry.
> > >>>>
> > >>> This wasn't fixed in 0.7.
> > >>>
> > >>> Lahiru
> > >>>
> > >>>>
> > >>>> Thanks
> > >>>> Amila
> > >>>>
> > >>>>
> > >>>> On Thu, Apr 18, 2013 at 10:29 AM, Lahiru Gunathilake <
> > glahiru@gmail.com
> > >>>>> wrote:
> > >>>>
> > >>>>> Hi All,
> > >>>>>
> > >>>>> We have done the 0.7 release now, and we are trying to adapt to 6
> > weeks
> > >>>>> release cycle so this is the right time to come up with features
> for
> > >> next
> > >>>>> release which is going to happen in 6 weeks from this week
> (Tuesday).
> > >>>>>
> > >>>>> So please come up with features you want to be there in 0.8 and
> > >>>>> realistically which can be finished in 5 weeks (atleast) from now.
> If
> > >> you
> > >>>>> have urgent features which you think cannot be implemented in 5
> weeks
> > >>>>> please shoot too.
> > >>>>>
> > >>>>> Regards
> > >>>>> Lahiru
> > >>>>>
> > >>>>> --
> > >>>>> System Analyst Programmer
> > >>>>> PTI Lab
> > >>>>> Indiana University
> > >>>>>
> > >>>>
> > >>>
> > >>>
> > >>>
> > >>> --
> > >>> System Analyst Programmer
> > >>> PTI Lab
> > >>> Indiana University
> > >>
> > >>
> >
> >
>



-- 
System Analyst Programmer
PTI Lab
Indiana University

Re: Features for 0.8 release

Posted by Amila Jayasekara <th...@gmail.com>.
On Tue, May 7, 2013 at 12:42 PM, Suresh Marru <sm...@apache.org> wrote:

> On May 7, 2013, at 12:36 PM, Amila Jayasekara <th...@gmail.com>
> wrote:
>
> > On Tue, May 7, 2013 at 12:17 PM, Lahiru Gunathilake <glahiru@gmail.com
> >wrote:
> >
> >> Hi All,
> >>
> >> Are we good to announce feature freeze and concentrate on more bug
> fixes ?
> >> If we do the feature freeze soon, we will be able to release on time.
> >>
> >> 6 week release cycle finishes end of May !
> >>
> >> Amila and Saminda, do you have any comments on the features posted in
> this
> >> thread ?
> >>
> >
> > I am not yet comfortable freezing features as I need to fix some issues.
>
> Hi Amila,
>
> Do you have more features to add to the release? I am parsing Lahiru's
> email as a feature freeze but not code freeze.
>

Sorry, i got confused. No I dont have any new features, only the
credential-store.

Thanks
Amila


>
> Suresh
>
>
> >
> > Thanks
> > Amila
> >
> >
> >>
> >> Regards
> >> Lahiru
> >>
> >>
> >> On Fri, Apr 19, 2013 at 9:50 AM, Saminda Wijeratne <samindaw@gmail.com
> >>> wrote:
> >>
> >>> Got it Suresh... Will do surely next week... I'm a little tied up at
> the
> >>> moment...
> >>>
> >>>
> >>> On Fri, Apr 19, 2013 at 6:39 AM, Suresh Marru <sm...@apache.org>
> wrote:
> >>>
> >>>> Saminda,
> >>>>
> >>>> This is great to hear and since it will not be included in 0.8, we
> >> don't
> >>>> need to discuss in detail now. But, once you have a prototype, before
> >> you
> >>>> go too far with the full implementation, please discuss the design on
> >> the
> >>>> list.
> >>>>
> >>>> Raman,
> >>>>
> >>>> I would still suggest to follow the release time line and not keep the
> >>>> feature additions open ended through the release cycle. So please add
> >> all
> >>>> improvements which needs to go into 0.8 within the first two weeks.
> >> Lets
> >>>> avoid adding any new feature or API additions after this period. We
> all
> >>>> need to work within this time line, so we can ensure the releases
> >> happen
> >>>> within 6 weeks and more importantly the code is well tested.
> >>>>
> >>>> Suresh
> >>>>
> >>>> On Apr 18, 2013, at 5:58 PM, Saminda Wijeratne <sa...@gmail.com>
> >>> wrote:
> >>>>
> >>>>> Hi Lahiru,,
> >>>>>
> >>>>> I'm going to work on a prototype workflow engine for Airavata. While
> >> it
> >>>>> will not go in to the 0.8 release, I will be making changes in the
> >> code
> >>>> to
> >>>>> allow future transition from current workflow interpreter to this
> >>>> prototype
> >>>>> workflow engine to allow prototype testing (which is again not part
> >> of
> >>>> 0.8
> >>>>> release) without affecting any of the 0.8 functionality.
> >>>>>
> >>>>> Thanks,
> >>>>> Saminda
> >>>>>
> >>>>>
> >>>>> On Thu, Apr 18, 2013 at 4:52 PM, Raminder Singh <
> >>>> raminderjsingh@gmail.com>wrote:
> >>>>>
> >>>>>> Hi Lahiru,
> >>>>>>
> >>>>>> I am working on migrating Ultrascan to Airavata. I may find bugs or
> >>>>>> improvements in the existing code during the process. I don't have
> >> any
> >>>> new
> >>>>>> feature request but want to give you heads up about the changes
> >>>> expected. I
> >>>>>> am marking most of the defects under 0.8 and will make sure to
> >> update
> >>>> the
> >>>>>> fixed version as 0.8. I will be able to provide the list of JIRA
> >>> before
> >>>> the
> >>>>>> testing.
> >>>>>>
> >>>>>> Thanks
> >>>>>> Raminder
> >>>>>>
> >>>>>> On Apr 18, 2013, at 12:52 PM, Lahiru Gunathilake wrote:
> >>>>>>
> >>>>>>> Hi Amila,
> >>>>>>>
> >>>>>>> Please create Jiras for each feature and set the fixed version for
> >>> 0.8
> >>>>>> and
> >>>>>>> please post those jira urls here. So we are good to do testing once
> >>> we
> >>>>>> have
> >>>>>>> resolved all the issue for 0.8 posted here (there are multiple 0.8
> >>>> fixed
> >>>>>>> version issues created sometimes back).
> >>>>>>>
> >>>>>>>
> >>>>>>> On Thu, Apr 18, 2013 at 12:49 PM, Amila Jayasekara
> >>>>>>> <th...@gmail.com>wrote:
> >>>>>>>
> >>>>>>>> 1. Credential Store
> >>>>>>>> 2. Ability to communicate over HTTPS (Was this fixed in last
> >> release
> >>>> ?)
> >>>>>>>> If I recall the issue, we had problems saving https URL in
> >> registry.
> >>>>>>>>
> >>>>>>> This wasn't fixed in 0.7.
> >>>>>>>
> >>>>>>> Lahiru
> >>>>>>>
> >>>>>>>>
> >>>>>>>> Thanks
> >>>>>>>> Amila
> >>>>>>>>
> >>>>>>>>
> >>>>>>>> On Thu, Apr 18, 2013 at 10:29 AM, Lahiru Gunathilake <
> >>>> glahiru@gmail.com
> >>>>>>>>> wrote:
> >>>>>>>>
> >>>>>>>>> Hi All,
> >>>>>>>>>
> >>>>>>>>> We have done the 0.7 release now, and we are trying to adapt to 6
> >>>> weeks
> >>>>>>>>> release cycle so this is the right time to come up with features
> >>> for
> >>>>>> next
> >>>>>>>>> release which is going to happen in 6 weeks from this week
> >>> (Tuesday).
> >>>>>>>>>
> >>>>>>>>> So please come up with features you want to be there in 0.8 and
> >>>>>>>>> realistically which can be finished in 5 weeks (atleast) from
> >> now.
> >>> If
> >>>>>> you
> >>>>>>>>> have urgent features which you think cannot be implemented in 5
> >>> weeks
> >>>>>>>>> please shoot too.
> >>>>>>>>>
> >>>>>>>>> Regards
> >>>>>>>>> Lahiru
> >>>>>>>>>
> >>>>>>>>> --
> >>>>>>>>> System Analyst Programmer
> >>>>>>>>> PTI Lab
> >>>>>>>>> Indiana University
> >>>>>>>>>
> >>>>>>>>
> >>>>>>>
> >>>>>>>
> >>>>>>>
> >>>>>>> --
> >>>>>>> System Analyst Programmer
> >>>>>>> PTI Lab
> >>>>>>> Indiana University
> >>>>>>
> >>>>>>
> >>>>
> >>>>
> >>>
> >>
> >>
> >>
> >> --
> >> System Analyst Programmer
> >> PTI Lab
> >> Indiana University
> >>
>
>

Re: Features for 0.8 release

Posted by Suresh Marru <sm...@apache.org>.
On May 7, 2013, at 12:36 PM, Amila Jayasekara <th...@gmail.com> wrote:

> On Tue, May 7, 2013 at 12:17 PM, Lahiru Gunathilake <gl...@gmail.com>wrote:
> 
>> Hi All,
>> 
>> Are we good to announce feature freeze and concentrate on more bug fixes ?
>> If we do the feature freeze soon, we will be able to release on time.
>> 
>> 6 week release cycle finishes end of May !
>> 
>> Amila and Saminda, do you have any comments on the features posted in this
>> thread ?
>> 
> 
> I am not yet comfortable freezing features as I need to fix some issues.

Hi Amila,

Do you have more features to add to the release? I am parsing Lahiru's email as a feature freeze but not code freeze. 

Suresh


> 
> Thanks
> Amila
> 
> 
>> 
>> Regards
>> Lahiru
>> 
>> 
>> On Fri, Apr 19, 2013 at 9:50 AM, Saminda Wijeratne <samindaw@gmail.com
>>> wrote:
>> 
>>> Got it Suresh... Will do surely next week... I'm a little tied up at the
>>> moment...
>>> 
>>> 
>>> On Fri, Apr 19, 2013 at 6:39 AM, Suresh Marru <sm...@apache.org> wrote:
>>> 
>>>> Saminda,
>>>> 
>>>> This is great to hear and since it will not be included in 0.8, we
>> don't
>>>> need to discuss in detail now. But, once you have a prototype, before
>> you
>>>> go too far with the full implementation, please discuss the design on
>> the
>>>> list.
>>>> 
>>>> Raman,
>>>> 
>>>> I would still suggest to follow the release time line and not keep the
>>>> feature additions open ended through the release cycle. So please add
>> all
>>>> improvements which needs to go into 0.8 within the first two weeks.
>> Lets
>>>> avoid adding any new feature or API additions after this period. We all
>>>> need to work within this time line, so we can ensure the releases
>> happen
>>>> within 6 weeks and more importantly the code is well tested.
>>>> 
>>>> Suresh
>>>> 
>>>> On Apr 18, 2013, at 5:58 PM, Saminda Wijeratne <sa...@gmail.com>
>>> wrote:
>>>> 
>>>>> Hi Lahiru,,
>>>>> 
>>>>> I'm going to work on a prototype workflow engine for Airavata. While
>> it
>>>>> will not go in to the 0.8 release, I will be making changes in the
>> code
>>>> to
>>>>> allow future transition from current workflow interpreter to this
>>>> prototype
>>>>> workflow engine to allow prototype testing (which is again not part
>> of
>>>> 0.8
>>>>> release) without affecting any of the 0.8 functionality.
>>>>> 
>>>>> Thanks,
>>>>> Saminda
>>>>> 
>>>>> 
>>>>> On Thu, Apr 18, 2013 at 4:52 PM, Raminder Singh <
>>>> raminderjsingh@gmail.com>wrote:
>>>>> 
>>>>>> Hi Lahiru,
>>>>>> 
>>>>>> I am working on migrating Ultrascan to Airavata. I may find bugs or
>>>>>> improvements in the existing code during the process. I don't have
>> any
>>>> new
>>>>>> feature request but want to give you heads up about the changes
>>>> expected. I
>>>>>> am marking most of the defects under 0.8 and will make sure to
>> update
>>>> the
>>>>>> fixed version as 0.8. I will be able to provide the list of JIRA
>>> before
>>>> the
>>>>>> testing.
>>>>>> 
>>>>>> Thanks
>>>>>> Raminder
>>>>>> 
>>>>>> On Apr 18, 2013, at 12:52 PM, Lahiru Gunathilake wrote:
>>>>>> 
>>>>>>> Hi Amila,
>>>>>>> 
>>>>>>> Please create Jiras for each feature and set the fixed version for
>>> 0.8
>>>>>> and
>>>>>>> please post those jira urls here. So we are good to do testing once
>>> we
>>>>>> have
>>>>>>> resolved all the issue for 0.8 posted here (there are multiple 0.8
>>>> fixed
>>>>>>> version issues created sometimes back).
>>>>>>> 
>>>>>>> 
>>>>>>> On Thu, Apr 18, 2013 at 12:49 PM, Amila Jayasekara
>>>>>>> <th...@gmail.com>wrote:
>>>>>>> 
>>>>>>>> 1. Credential Store
>>>>>>>> 2. Ability to communicate over HTTPS (Was this fixed in last
>> release
>>>> ?)
>>>>>>>> If I recall the issue, we had problems saving https URL in
>> registry.
>>>>>>>> 
>>>>>>> This wasn't fixed in 0.7.
>>>>>>> 
>>>>>>> Lahiru
>>>>>>> 
>>>>>>>> 
>>>>>>>> Thanks
>>>>>>>> Amila
>>>>>>>> 
>>>>>>>> 
>>>>>>>> On Thu, Apr 18, 2013 at 10:29 AM, Lahiru Gunathilake <
>>>> glahiru@gmail.com
>>>>>>>>> wrote:
>>>>>>>> 
>>>>>>>>> Hi All,
>>>>>>>>> 
>>>>>>>>> We have done the 0.7 release now, and we are trying to adapt to 6
>>>> weeks
>>>>>>>>> release cycle so this is the right time to come up with features
>>> for
>>>>>> next
>>>>>>>>> release which is going to happen in 6 weeks from this week
>>> (Tuesday).
>>>>>>>>> 
>>>>>>>>> So please come up with features you want to be there in 0.8 and
>>>>>>>>> realistically which can be finished in 5 weeks (atleast) from
>> now.
>>> If
>>>>>> you
>>>>>>>>> have urgent features which you think cannot be implemented in 5
>>> weeks
>>>>>>>>> please shoot too.
>>>>>>>>> 
>>>>>>>>> Regards
>>>>>>>>> Lahiru
>>>>>>>>> 
>>>>>>>>> --
>>>>>>>>> System Analyst Programmer
>>>>>>>>> PTI Lab
>>>>>>>>> Indiana University
>>>>>>>>> 
>>>>>>>> 
>>>>>>> 
>>>>>>> 
>>>>>>> 
>>>>>>> --
>>>>>>> System Analyst Programmer
>>>>>>> PTI Lab
>>>>>>> Indiana University
>>>>>> 
>>>>>> 
>>>> 
>>>> 
>>> 
>> 
>> 
>> 
>> --
>> System Analyst Programmer
>> PTI Lab
>> Indiana University
>> 


Re: Features for 0.8 release

Posted by Amila Jayasekara <th...@gmail.com>.
On Tue, May 7, 2013 at 12:17 PM, Lahiru Gunathilake <gl...@gmail.com>wrote:

> Hi All,
>
> Are we good to announce feature freeze and concentrate on more bug fixes ?
> If we do the feature freeze soon, we will be able to release on time.
>
> 6 week release cycle finishes end of May !
>
> Amila and Saminda, do you have any comments on the features posted in this
> thread ?
>

I am not yet comfortable freezing features as I need to fix some issues.

Thanks
Amila


>
> Regards
> Lahiru
>
>
> On Fri, Apr 19, 2013 at 9:50 AM, Saminda Wijeratne <samindaw@gmail.com
> >wrote:
>
> > Got it Suresh... Will do surely next week... I'm a little tied up at the
> > moment...
> >
> >
> > On Fri, Apr 19, 2013 at 6:39 AM, Suresh Marru <sm...@apache.org> wrote:
> >
> > > Saminda,
> > >
> > > This is great to hear and since it will not be included in 0.8, we
> don't
> > > need to discuss in detail now. But, once you have a prototype, before
> you
> > > go too far with the full implementation, please discuss the design on
> the
> > > list.
> > >
> > > Raman,
> > >
> > > I would still suggest to follow the release time line and not keep the
> > > feature additions open ended through the release cycle. So please add
> all
> > > improvements which needs to go into 0.8 within the first two weeks.
> Lets
> > > avoid adding any new feature or API additions after this period. We all
> > > need to work within this time line, so we can ensure the releases
> happen
> > > within 6 weeks and more importantly the code is well tested.
> > >
> > > Suresh
> > >
> > > On Apr 18, 2013, at 5:58 PM, Saminda Wijeratne <sa...@gmail.com>
> > wrote:
> > >
> > > > Hi Lahiru,,
> > > >
> > > > I'm going to work on a prototype workflow engine for Airavata. While
> it
> > > > will not go in to the 0.8 release, I will be making changes in the
> code
> > > to
> > > > allow future transition from current workflow interpreter to this
> > > prototype
> > > > workflow engine to allow prototype testing (which is again not part
> of
> > > 0.8
> > > > release) without affecting any of the 0.8 functionality.
> > > >
> > > > Thanks,
> > > > Saminda
> > > >
> > > >
> > > > On Thu, Apr 18, 2013 at 4:52 PM, Raminder Singh <
> > > raminderjsingh@gmail.com>wrote:
> > > >
> > > >> Hi Lahiru,
> > > >>
> > > >> I am working on migrating Ultrascan to Airavata. I may find bugs or
> > > >> improvements in the existing code during the process. I don't have
> any
> > > new
> > > >> feature request but want to give you heads up about the changes
> > > expected. I
> > > >> am marking most of the defects under 0.8 and will make sure to
> update
> > > the
> > > >> fixed version as 0.8. I will be able to provide the list of JIRA
> > before
> > > the
> > > >> testing.
> > > >>
> > > >> Thanks
> > > >> Raminder
> > > >>
> > > >> On Apr 18, 2013, at 12:52 PM, Lahiru Gunathilake wrote:
> > > >>
> > > >>> Hi Amila,
> > > >>>
> > > >>> Please create Jiras for each feature and set the fixed version for
> > 0.8
> > > >> and
> > > >>> please post those jira urls here. So we are good to do testing once
> > we
> > > >> have
> > > >>> resolved all the issue for 0.8 posted here (there are multiple 0.8
> > > fixed
> > > >>> version issues created sometimes back).
> > > >>>
> > > >>>
> > > >>> On Thu, Apr 18, 2013 at 12:49 PM, Amila Jayasekara
> > > >>> <th...@gmail.com>wrote:
> > > >>>
> > > >>>> 1. Credential Store
> > > >>>> 2. Ability to communicate over HTTPS (Was this fixed in last
> release
> > > ?)
> > > >>>> If I recall the issue, we had problems saving https URL in
> registry.
> > > >>>>
> > > >>> This wasn't fixed in 0.7.
> > > >>>
> > > >>> Lahiru
> > > >>>
> > > >>>>
> > > >>>> Thanks
> > > >>>> Amila
> > > >>>>
> > > >>>>
> > > >>>> On Thu, Apr 18, 2013 at 10:29 AM, Lahiru Gunathilake <
> > > glahiru@gmail.com
> > > >>>>> wrote:
> > > >>>>
> > > >>>>> Hi All,
> > > >>>>>
> > > >>>>> We have done the 0.7 release now, and we are trying to adapt to 6
> > > weeks
> > > >>>>> release cycle so this is the right time to come up with features
> > for
> > > >> next
> > > >>>>> release which is going to happen in 6 weeks from this week
> > (Tuesday).
> > > >>>>>
> > > >>>>> So please come up with features you want to be there in 0.8 and
> > > >>>>> realistically which can be finished in 5 weeks (atleast) from
> now.
> > If
> > > >> you
> > > >>>>> have urgent features which you think cannot be implemented in 5
> > weeks
> > > >>>>> please shoot too.
> > > >>>>>
> > > >>>>> Regards
> > > >>>>> Lahiru
> > > >>>>>
> > > >>>>> --
> > > >>>>> System Analyst Programmer
> > > >>>>> PTI Lab
> > > >>>>> Indiana University
> > > >>>>>
> > > >>>>
> > > >>>
> > > >>>
> > > >>>
> > > >>> --
> > > >>> System Analyst Programmer
> > > >>> PTI Lab
> > > >>> Indiana University
> > > >>
> > > >>
> > >
> > >
> >
>
>
>
> --
> System Analyst Programmer
> PTI Lab
> Indiana University
>