You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@pig.apache.org by "Daniel Dai (JIRA)" <ji...@apache.org> on 2014/03/01 06:51:21 UTC

[jira] [Updated] (PIG-3790) Several changes in Tez e2e

     [ https://issues.apache.org/jira/browse/PIG-3790?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Daniel Dai updated PIG-3790:
----------------------------

    Attachment: PIG-3790-1.patch

> Several changes in Tez e2e
> --------------------------
>
>                 Key: PIG-3790
>                 URL: https://issues.apache.org/jira/browse/PIG-3790
>             Project: Pig
>          Issue Type: Sub-task
>          Components: tez
>    Affects Versions: tez-branch
>            Reporter: Daniel Dai
>            Assignee: Daniel Dai
>             Fix For: tez-branch
>
>         Attachments: PIG-3790-1.patch
>
>
> Need to change several thing in e2e:
> 1. If test contains tag "verify_pig_script", "verify_pig_script" still run against tez, should run against MR
> 2. Have the following line in test:
> $ENV{'PIG_CLASSPATH'} = $ENV{'PIG_CLASSPATH'} . $separator . $pcp;
> PIG_CLASSPATH eventually get too long and exceed system limit
> 3. Some tests such as MultiQuery_11, perl command is enclosed in double quote (perl -ne "print $_;"), Pig runtime will do the parameter substitution and replace $_ to the last command executed. This seems should goes to MR as well, if so, I will open another ticket to fix in trunk.
> 4. Since e2e is now in a good shape, we need to enable all test suite instead of just tez.



--
This message was sent by Atlassian JIRA
(v6.1.5#6160)