You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@drill.apache.org by "Steven Phillips (JIRA)" <ji...@apache.org> on 2015/04/09 02:38:13 UTC
[jira] [Updated] (DRILL-2725) Faster work assignment logic
[ https://issues.apache.org/jira/browse/DRILL-2725?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Steven Phillips updated DRILL-2725:
-----------------------------------
Attachment: DRILL-2725.patch
> Faster work assignment logic
> ----------------------------
>
> Key: DRILL-2725
> URL: https://issues.apache.org/jira/browse/DRILL-2725
> Project: Apache Drill
> Issue Type: Improvement
> Components: Storage - Other
> Reporter: Steven Phillips
> Assignee: Steven Phillips
> Attachments: DRILL-2725.patch
>
>
> The current AssignmentCreator logic for assigning work to drillbits takes a non-negligible amount of time once the number of work units is more than a few thousand
> We need a new algorithm to that will cut this time down to less than a second, even for tables with more than 100K files.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)