You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@geode.apache.org by "Kenneth Howe (JIRA)" <ji...@apache.org> on 2018/03/08 16:57:00 UTC

[jira] [Created] (GEODE-4803) CI: ConcurrentDeployDUnitTest needs tuning

Kenneth Howe created GEODE-4803:
-----------------------------------

             Summary: CI: ConcurrentDeployDUnitTest needs tuning
                 Key: GEODE-4803
                 URL: https://issues.apache.org/jira/browse/GEODE-4803
             Project: Geode
          Issue Type: Bug
          Components: gfsh
            Reporter: Kenneth Howe


The test concurrently runs iterations of gfsh commands to deploy and undeploy .jar's from 3 gfsh clients to the same server, then waits up to 5 minutes for the gfsh clients to finish. Sometimes in the CI pipelines one or more of the clients don't complete their iterations within the 5 minute wait.

Test timing and/or client iterations needs to be adjusted for variations in machine and network speed.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)