You are viewing a plain text version of this content. The canonical link for it is here.
Posted to commits@tamaya.apache.org by wl...@apache.org on 2018/12/30 09:56:26 UTC
[incubator-tamaya-sandbox] branch master updated (ce8a574 ->
68d2516)
This is an automated email from the ASF dual-hosted git repository.
wlieurance pushed a change to branch master
in repository https://gitbox.apache.org/repos/asf/incubator-tamaya-sandbox.git.
from ce8a574 Adding myself (William Lieurance) to the developers list
add 3a964e3 Exclude the docs project from the OSGi scan.
add 0db3dd8 Block until the vertx deployment happens so we can get a clean (non-NPE) eventBus call.
new 68d2516 Merge pull request #12 from peculater/karaf-test-update
The 1 revisions listed above as "new" are entirely new to this
repository and will be described in separate emails. The revisions
listed as "add" were already present in the repository and have only
been added to this reference.
Summary of changes:
pom.xml | 7 +++-
.../apache/tamaya/vertx/ConfigVerticleTest.java | 45 +++++++++++++---------
2 files changed, 31 insertions(+), 21 deletions(-)
[incubator-tamaya-sandbox] 01/01: Merge pull request #12 from
peculater/karaf-test-update
Posted by wl...@apache.org.
This is an automated email from the ASF dual-hosted git repository.
wlieurance pushed a commit to branch master
in repository https://gitbox.apache.org/repos/asf/incubator-tamaya-sandbox.git
commit 68d251694b8204c24fb12961759fc998e8e514b7
Merge: ce8a574 0db3dd8
Author: William Lieurance <pe...@users.noreply.github.com>
AuthorDate: Sun Dec 30 03:56:22 2018 -0600
Merge pull request #12 from peculater/karaf-test-update
Get the tests passing before 2018 ends.
pom.xml | 7 +++-
.../apache/tamaya/vertx/ConfigVerticleTest.java | 45 +++++++++++++---------
2 files changed, 31 insertions(+), 21 deletions(-)