You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@ignite.apache.org by "Pavel Pereslegin (Jira)" <ji...@apache.org> on 2025/12/16 13:42:00 UTC

[jira] [Assigned] (IGNITE-22303) Sql. Retry operation when plan gets outdated by the time of execution

     [ https://issues.apache.org/jira/browse/IGNITE-22303?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Pavel Pereslegin reassigned IGNITE-22303:
-----------------------------------------

    Assignee: Pavel Pereslegin

> Sql. Retry operation when plan gets outdated by the time of execution
> ---------------------------------------------------------------------
>
>                 Key: IGNITE-22303
>                 URL: https://issues.apache.org/jira/browse/IGNITE-22303
>             Project: Ignite
>          Issue Type: Bug
>          Components: sql
>            Reporter: Konstantin Orlov
>            Assignee: Pavel Pereslegin
>            Priority: Major
>              Labels: ignite-3
>             Fix For: 3.2
>
>
> In IGNITE-22263 start of the transaction was moved to execution phase. This may cause situation, when plan gets outdated by the time of execution. Such cases should be detected and handled properly (by retrying operation one more time).



--
This message was sent by Atlassian Jira
(v8.20.10#820010)