You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hbase.apache.org by "Nick Dimiduk (Jira)" <ji...@apache.org> on 2020/08/07 22:58:00 UTC
[jira] [Created] (HBASE-24835) Normalizer should log a successful
run at INFO level
Nick Dimiduk created HBASE-24835:
------------------------------------
Summary: Normalizer should log a successful run at INFO level
Key: HBASE-24835
URL: https://issues.apache.org/jira/browse/HBASE-24835
Project: HBase
Issue Type: Task
Components: Normalizer
Affects Versions: 3.0.0-alpha-1
Reporter: Nick Dimiduk
Assignee: Nick Dimiduk
A successful or uneventful Normalizer run gives no indication that it ran at INFO level. I'm thinking a simple summary message like "Normalizer ran successfully in T. Submitted X plans across Y tables."
--
This message was sent by Atlassian Jira
(v8.3.4#803005)