You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@beam.apache.org by "Kyle Weaver (Jira)" <ji...@apache.org> on 2019/12/23 16:28:00 UTC
[jira] [Updated] (BEAM-9021) Flink portable runner postcommit times
out
[ https://issues.apache.org/jira/browse/BEAM-9021?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Kyle Weaver updated BEAM-9021:
------------------------------
Status: Open (was: Triage Needed)
> Flink portable runner postcommit times out
> ------------------------------------------
>
> Key: BEAM-9021
> URL: https://issues.apache.org/jira/browse/BEAM-9021
> Project: Beam
> Issue Type: Improvement
> Components: runner-flink, test-failures
> Reporter: Kyle Weaver
> Assignee: Kyle Weaver
> Priority: Major
> Labels: currently-failing, portability-flink
>
> Build times appear to be inconsistent, with some builds taking 10-30 mins and others timing out at 2 hours.
> https://builds.apache.org/job/beam_PostCommit_PortableJar_Flink/buildTimeTrend
--
This message was sent by Atlassian Jira
(v8.3.4#803005)