You are viewing a plain text version of this content. The canonical link for it is here.
Posted to users@continuum.apache.org by Michael Böckling <mi...@giniality.com> on 2006/02/22 15:32:29 UTC
Configuring schedules in pom
Hi!
Is there a way I an specify the default schedules to use in my project
POM, instead of having it to configure in Continuum for every project
that I import? Maybe even in a parent POM? That would be great!
Bye,
Michael
--
Giniality AG - Michael Böckling; Steinenberg 21, CH-4051 Basel
P: +41 61 226 99 63 - F: +41 61 226 99 69
michael.boeckling@giniality.ch; http://www.giniality.com/
Re: Configuring schedules in pom
Posted by Emmanuel Venisse <em...@venisse.net>.
The default schedule is always assign to the build definition for each project imported.
Do you want to assign different schedules for different type of project? In this case, it isn't
possible actually.
Emmanuel
Michael Böckling a écrit :
> Hi!
>
> Is there a way I an specify the default schedules to use in my project
> POM, instead of having it to configure in Continuum for every project
> that I import? Maybe even in a parent POM? That would be great!
>
> Bye,
> Michael
>