Posted to dev@beam.apache.org by Charles Chen <cc...@google.com> on 2018/08/20 18:29:29 UTC
[PROPOSAL] Prepare Beam 2.7.0 release
Hey everyone,
Our release calendar indicates that the process for the 2.7.0 Beam release
should start on September 7.
I volunteer to perform this release and propose the following schedule:
- We start triaging issues in JIRA this week.
- I will cut the initial 2.7.0 release branch on September 7.
- After September 7, any blockers will need to be manually cherry-picked
into the release branch.
- After tests pass and blockers are fully addressed, I will move on and
perform other release tasks.
What do you think?
Best,
Charles
Re: [PROPOSAL] Prepare Beam 2.7.0 release
Posted by Charles Chen <cc...@google.com>.
Making steady progress, but there is an issue compiling with Protobuf for
Python which I am investigating right now.
On Wed, Sep 5, 2018 at 11:13 PM Charles Chen <cc...@google.com> wrote:
> Thanks! I talked to Boyuan who indicated that this may be an issue
> specific to the JVM version I am running, since she saw a similar issue
> while performing the 2.5.0 release. Next step on my end is to set up
> another machine with a different JVM version to run these steps.
>
> On Wed, Sep 5, 2018 at 3:03 AM Alexey Romanenko <ar...@gmail.com>
> wrote:
>
>> Charles,
>> Does it happen when you run this task separately or as a part of the
>> whole project build? I run it independently and don’t see any issues on my
>> side. Also, I don’t remember that it failed on Jenkins recently. So,
>> probably this segfault is not related to exactly this task.
>>
>> On 5 Sep 2018, at 06:46, Charles Chen <cc...@google.com> wrote:
>>
>> I attempted to cut the 2.7.0 RC1 today, but encountered an issue where
>> the JVM consistently segfaulted at
>> the :beam-sdks-java-io-hadoop-input-format:test task. I will investigate
>> further tomorrow. Let me know if this anyone knows of this issue and has
>> any insight.
>>
>> On Wed, Aug 29, 2018 at 12:21 PM Jean-Baptiste Onofré <jb...@nanthrax.net>
>> wrote:
>>
>>> It sounds good to me. I'm late on my PRs, but not release blocker
>>> anyway. I will wait the next release cycle ;)
>>>
>>> Regards
>>> JB
>>>
>>> On 29/08/2018 21:18, Charles Chen wrote:
>>> > I have cut the release branch for 2.7.0, since there continue to be no
>>> > blockers listed in JIRA. I will build the first release candidate
>>> soon.
>>> >
>>> > On Mon, Aug 27, 2018 at 10:38 PM Charles Chen <ccy@google.com
>>> > <ma...@google.com>> wrote:
>>> >
>>> > Hey everyone, I want to highlight again to those who missed it that
>>> > if you are aware of any 2.7.0 release blockers, you should add it
>>> as
>>> > a blocker in JIRA with a target version of 2.7.0. It is very
>>> > helpful to know this information in advance. As of right now,
>>> there
>>> > are no such blockers listed in JIRA, and I will be cutting the
>>> > release branch on Wednesday 8/29.
>>> >
>>> > Best,
>>> > Charles
>>> >
>>> > On Fri, Aug 24, 2018 at 2:38 PM Charles Chen <ccy@google.com
>>> > <ma...@google.com>> wrote:
>>> >
>>> > Thanks everyone. Again, we will proceed with the initial
>>> > release cut on August 29.
>>> >
>>> > A reminder to please tag any blocking issues as "Priority:
>>> > Blocker" and "Fix version: 2.7.0" in JIRA. We recently
>>> > resolved https://issues.apache.org/jira/browse/BEAM-5180, and
>>> > there are no other blocking bugs at the moment.
>>> >
>>> > On Thu, Aug 23, 2018 at 8:19 PM Griselda Cuevas <
>>> gris@google.com
>>> > <ma...@google.com>> wrote:
>>> >
>>> > +1 Thanks for volunteering and keeping us in schedule!
>>> >
>>> >
>>> >
>>> >
>>> > On Thu, 23 Aug 2018 at 11:58, Udi Meiri <ehudm@google.com
>>> > <ma...@google.com>> wrote:
>>> >
>>> > +1
>>> >
>>> > On Mon, Aug 20, 2018 at 3:33 PM Boyuan Zhang
>>> > <boyuanz@google.com <ma...@google.com>>
>>> wrote:
>>> >
>>> > +1
>>> > Thanks for volunteering, Charles!
>>> >
>>> > On Mon, Aug 20, 2018 at 3:22 PM Rafael Fernandez
>>> > <rfernand@google.com <ma...@google.com>>
>>> > wrote:
>>> >
>>> > +1, thanks for volunteering, Charles!
>>> >
>>> > On Mon, Aug 20, 2018 at 12:09 PM Charles Chen
>>> > <ccy@google.com <ma...@google.com>>
>>> wrote:
>>> >
>>> > Thank you Andrew for pointing out my
>>> > mistake. We should follow the calendar and
>>> > aim to cut on 8/29, not 9/7 as I
>>> incorrectly
>>> > wrote earlier.
>>> >
>>> > On Mon, Aug 20, 2018 at 12:02 PM Andrew
>>> > Pilloud <apilloud@google.com
>>> > <ma...@google.com>> wrote:
>>> >
>>> > +1 Thanks for volunteering! The
>>> calendar
>>> > I have puts the cut date at August
>>> 29th,
>>> > which looks to be 6 weeks from when
>>> > 2.6.0 was cut. Do I have the wrong
>>> calendar?
>>> >
>>> > See:
>>> >
>>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com&ctz=America%2FLos_Angeles
>>> >
>>> > Andrew
>>> >
>>> > On Mon, Aug 20, 2018 at 11:43 AM
>>> Connell
>>> > O'Callaghan <connello@google.com
>>> > <ma...@google.com>> wrote:
>>> >
>>> > +1 Charles thank you for taking
>>> this
>>> > up and helping us maintain this
>>> > schedule.
>>> >
>>> > On Mon, Aug 20, 2018 at 11:29 AM
>>> > Charles Chen <ccy@google.com
>>> > <ma...@google.com>> wrote:
>>> >
>>> > Hey everyone,
>>> >
>>> > Our release calendar indicates
>>> > that the process for the 2.7.0
>>> > Beam release should start on
>>> > September 7.
>>> >
>>> > I volunteer to perform this
>>> > release and propose the
>>> > following schedule:
>>> >
>>> > * We start triaging issues in
>>> > JIRA this week.
>>> > * I will cut the initial
>>> 2.7.0
>>> > release branch on
>>> September 7.
>>> > * After September 7, any
>>> > blockers will need to be
>>> > manually cherry-picked into
>>> > the release branch.
>>> > * After tests pass and
>>> > blockers are fully
>>> > addressed, I will move on
>>> > and perform other release
>>> tasks.
>>> >
>>> > What do you think?
>>> >
>>> > Best,
>>> > Charles
>>> >
>>>
>>> --
>>> Jean-Baptiste Onofré
>>> jbonofre@apache.org
>>> http://blog.nanthrax.net
>>> Talend - http://www.talend.com
>>>
>>
>>
Re: [PROPOSAL] Prepare Beam 2.7.0 release
Posted by Charles Chen <cc...@google.com>.
Thanks! I talked to Boyuan who indicated that this may be an issue
specific to the JVM version I am running, since she saw a similar issue
while performing the 2.5.0 release. Next step on my end is to set up
another machine with a different JVM version to run these steps.
On Wed, Sep 5, 2018 at 3:03 AM Alexey Romanenko <ar...@gmail.com>
wrote:
> Charles,
> Does it happen when you run this task separately or as a part of the whole
> project build? I run it independently and don’t see any issues on my side.
> Also, I don’t remember that it failed on Jenkins recently. So, probably
> this segfault is not related to exactly this task.
>
> On 5 Sep 2018, at 06:46, Charles Chen <cc...@google.com> wrote:
>
> I attempted to cut the 2.7.0 RC1 today, but encountered an issue where the
> JVM consistently segfaulted at
> the :beam-sdks-java-io-hadoop-input-format:test task. I will investigate
> further tomorrow. Let me know if this anyone knows of this issue and has
> any insight.
>
> On Wed, Aug 29, 2018 at 12:21 PM Jean-Baptiste Onofré <jb...@nanthrax.net>
> wrote:
>
>> It sounds good to me. I'm late on my PRs, but not release blocker
>> anyway. I will wait the next release cycle ;)
>>
>> Regards
>> JB
>>
>> On 29/08/2018 21:18, Charles Chen wrote:
>> > I have cut the release branch for 2.7.0, since there continue to be no
>> > blockers listed in JIRA. I will build the first release candidate soon.
>> >
>> > On Mon, Aug 27, 2018 at 10:38 PM Charles Chen <ccy@google.com
>> > <ma...@google.com>> wrote:
>> >
>> > Hey everyone, I want to highlight again to those who missed it that
>> > if you are aware of any 2.7.0 release blockers, you should add it as
>> > a blocker in JIRA with a target version of 2.7.0. It is very
>> > helpful to know this information in advance. As of right now, there
>> > are no such blockers listed in JIRA, and I will be cutting the
>> > release branch on Wednesday 8/29.
>> >
>> > Best,
>> > Charles
>> >
>> > On Fri, Aug 24, 2018 at 2:38 PM Charles Chen <ccy@google.com
>> > <ma...@google.com>> wrote:
>> >
>> > Thanks everyone. Again, we will proceed with the initial
>> > release cut on August 29.
>> >
>> > A reminder to please tag any blocking issues as "Priority:
>> > Blocker" and "Fix version: 2.7.0" in JIRA. We recently
>> > resolved https://issues.apache.org/jira/browse/BEAM-5180, and
>> > there are no other blocking bugs at the moment.
>> >
>> > On Thu, Aug 23, 2018 at 8:19 PM Griselda Cuevas <
>> gris@google.com
>> > <ma...@google.com>> wrote:
>> >
>> > +1 Thanks for volunteering and keeping us in schedule!
>> >
>> >
>> >
>> >
>> > On Thu, 23 Aug 2018 at 11:58, Udi Meiri <ehudm@google.com
>> > <ma...@google.com>> wrote:
>> >
>> > +1
>> >
>> > On Mon, Aug 20, 2018 at 3:33 PM Boyuan Zhang
>> > <boyuanz@google.com <ma...@google.com>> wrote:
>> >
>> > +1
>> > Thanks for volunteering, Charles!
>> >
>> > On Mon, Aug 20, 2018 at 3:22 PM Rafael Fernandez
>> > <rfernand@google.com <ma...@google.com>>
>> > wrote:
>> >
>> > +1, thanks for volunteering, Charles!
>> >
>> > On Mon, Aug 20, 2018 at 12:09 PM Charles Chen
>> > <ccy@google.com <ma...@google.com>> wrote:
>> >
>> > Thank you Andrew for pointing out my
>> > mistake. We should follow the calendar and
>> > aim to cut on 8/29, not 9/7 as I incorrectly
>> > wrote earlier.
>> >
>> > On Mon, Aug 20, 2018 at 12:02 PM Andrew
>> > Pilloud <apilloud@google.com
>> > <ma...@google.com>> wrote:
>> >
>> > +1 Thanks for volunteering! The calendar
>> > I have puts the cut date at August 29th,
>> > which looks to be 6 weeks from when
>> > 2.6.0 was cut. Do I have the wrong
>> calendar?
>> >
>> > See:
>> >
>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com&ctz=America%2FLos_Angeles
>> >
>> > Andrew
>> >
>> > On Mon, Aug 20, 2018 at 11:43 AM Connell
>> > O'Callaghan <connello@google.com
>> > <ma...@google.com>> wrote:
>> >
>> > +1 Charles thank you for taking this
>> > up and helping us maintain this
>> > schedule.
>> >
>> > On Mon, Aug 20, 2018 at 11:29 AM
>> > Charles Chen <ccy@google.com
>> > <ma...@google.com>> wrote:
>> >
>> > Hey everyone,
>> >
>> > Our release calendar indicates
>> > that the process for the 2.7.0
>> > Beam release should start on
>> > September 7.
>> >
>> > I volunteer to perform this
>> > release and propose the
>> > following schedule:
>> >
>> > * We start triaging issues in
>> > JIRA this week.
>> > * I will cut the initial 2.7.0
>> > release branch on September
>> 7.
>> > * After September 7, any
>> > blockers will need to be
>> > manually cherry-picked into
>> > the release branch.
>> > * After tests pass and
>> > blockers are fully
>> > addressed, I will move on
>> > and perform other release
>> tasks.
>> >
>> > What do you think?
>> >
>> > Best,
>> > Charles
>> >
>>
>> --
>> Jean-Baptiste Onofré
>> jbonofre@apache.org
>> http://blog.nanthrax.net
>> Talend - http://www.talend.com
>>
>
>
Re: [PROPOSAL] Prepare Beam 2.7.0 release
Posted by Alexey Romanenko <ar...@gmail.com>.
Charles,
Does it happen when you run this task separately or as a part of the whole project build? I run it independently and don’t see any issues on my side. Also, I don’t remember that it failed on Jenkins recently. So, probably this segfault is not related to exactly this task.
> On 5 Sep 2018, at 06:46, Charles Chen <cc...@google.com> wrote:
>
> I attempted to cut the 2.7.0 RC1 today, but encountered an issue where the JVM consistently segfaulted at the :beam-sdks-java-io-hadoop-input-format:test task. I will investigate further tomorrow. Let me know if this anyone knows of this issue and has any insight.
>
> On Wed, Aug 29, 2018 at 12:21 PM Jean-Baptiste Onofré <jb@nanthrax.net <ma...@nanthrax.net>> wrote:
> It sounds good to me. I'm late on my PRs, but not release blocker
> anyway. I will wait the next release cycle ;)
>
> Regards
> JB
>
> On 29/08/2018 21:18, Charles Chen wrote:
> > I have cut the release branch for 2.7.0, since there continue to be no
> > blockers listed in JIRA. I will build the first release candidate soon.
> >
> > On Mon, Aug 27, 2018 at 10:38 PM Charles Chen <ccy@google.com <ma...@google.com>
> > <mailto:ccy@google.com <ma...@google.com>>> wrote:
> >
> > Hey everyone, I want to highlight again to those who missed it that
> > if you are aware of any 2.7.0 release blockers, you should add it as
> > a blocker in JIRA with a target version of 2.7.0. It is very
> > helpful to know this information in advance. As of right now, there
> > are no such blockers listed in JIRA, and I will be cutting the
> > release branch on Wednesday 8/29.
> >
> > Best,
> > Charles
> >
> > On Fri, Aug 24, 2018 at 2:38 PM Charles Chen <ccy@google.com <ma...@google.com>
> > <mailto:ccy@google.com <ma...@google.com>>> wrote:
> >
> > Thanks everyone. Again, we will proceed with the initial
> > release cut on August 29.
> >
> > A reminder to please tag any blocking issues as "Priority:
> > Blocker" and "Fix version: 2.7.0" in JIRA. We recently
> > resolved https://issues.apache.org/jira/browse/BEAM-5180 <https://issues.apache.org/jira/browse/BEAM-5180>, and
> > there are no other blocking bugs at the moment.
> >
> > On Thu, Aug 23, 2018 at 8:19 PM Griselda Cuevas <gris@google.com <ma...@google.com>
> > <mailto:gris@google.com <ma...@google.com>>> wrote:
> >
> > +1 Thanks for volunteering and keeping us in schedule!
> >
> >
> >
> >
> > On Thu, 23 Aug 2018 at 11:58, Udi Meiri <ehudm@google.com <ma...@google.com>
> > <mailto:ehudm@google.com <ma...@google.com>>> wrote:
> >
> > +1
> >
> > On Mon, Aug 20, 2018 at 3:33 PM Boyuan Zhang
> > <boyuanz@google.com <ma...@google.com> <mailto:boyuanz@google.com <ma...@google.com>>> wrote:
> >
> > +1
> > Thanks for volunteering, Charles!
> >
> > On Mon, Aug 20, 2018 at 3:22 PM Rafael Fernandez
> > <rfernand@google.com <ma...@google.com> <mailto:rfernand@google.com <ma...@google.com>>>
> > wrote:
> >
> > +1, thanks for volunteering, Charles!
> >
> > On Mon, Aug 20, 2018 at 12:09 PM Charles Chen
> > <ccy@google.com <ma...@google.com> <mailto:ccy@google.com <ma...@google.com>>> wrote:
> >
> > Thank you Andrew for pointing out my
> > mistake. We should follow the calendar and
> > aim to cut on 8/29, not 9/7 as I incorrectly
> > wrote earlier.
> >
> > On Mon, Aug 20, 2018 at 12:02 PM Andrew
> > Pilloud <apilloud@google.com <ma...@google.com>
> > <mailto:apilloud@google.com <ma...@google.com>>> wrote:
> >
> > +1 Thanks for volunteering! The calendar
> > I have puts the cut date at August 29th,
> > which looks to be 6 weeks from when
> > 2.6.0 was cut. Do I have the wrong calendar?
> >
> > See:
> > https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com&ctz=America%2FLos_Angeles <https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com&ctz=America%2FLos_Angeles>
> >
> > Andrew
> >
> > On Mon, Aug 20, 2018 at 11:43 AM Connell
> > O'Callaghan <connello@google.com <ma...@google.com>
> > <mailto:connello@google.com <ma...@google.com>>> wrote:
> >
> > +1 Charles thank you for taking this
> > up and helping us maintain this
> > schedule.
> >
> > On Mon, Aug 20, 2018 at 11:29 AM
> > Charles Chen <ccy@google.com <ma...@google.com>
> > <mailto:ccy@google.com <ma...@google.com>>> wrote:
> >
> > Hey everyone,
> >
> > Our release calendar indicates
> > that the process for the 2.7.0
> > Beam release should start on
> > September 7.
> >
> > I volunteer to perform this
> > release and propose the
> > following schedule:
> >
> > * We start triaging issues in
> > JIRA this week.
> > * I will cut the initial 2.7.0
> > release branch on September 7.
> > * After September 7, any
> > blockers will need to be
> > manually cherry-picked into
> > the release branch.
> > * After tests pass and
> > blockers are fully
> > addressed, I will move on
> > and perform other release tasks.
> >
> > What do you think?
> >
> > Best,
> > Charles
> >
>
> --
> Jean-Baptiste Onofré
> jbonofre@apache.org <ma...@apache.org>
> http://blog.nanthrax.net <http://blog.nanthrax.net/>
> Talend - http://www.talend.com <http://www.talend.com/>
Re: [PROPOSAL] Prepare Beam 2.7.0 release
Posted by Charles Chen <cc...@google.com>.
I attempted to cut the 2.7.0 RC1 today, but encountered an issue where the
JVM consistently segfaulted at
the :beam-sdks-java-io-hadoop-input-format:test task. I will investigate
further tomorrow. Let me know if this anyone knows of this issue and has
any insight.
On Wed, Aug 29, 2018 at 12:21 PM Jean-Baptiste Onofré <jb...@nanthrax.net>
wrote:
> It sounds good to me. I'm late on my PRs, but not release blocker
> anyway. I will wait the next release cycle ;)
>
> Regards
> JB
>
> On 29/08/2018 21:18, Charles Chen wrote:
> > I have cut the release branch for 2.7.0, since there continue to be no
> > blockers listed in JIRA. I will build the first release candidate soon.
> >
> > On Mon, Aug 27, 2018 at 10:38 PM Charles Chen <ccy@google.com
> > <ma...@google.com>> wrote:
> >
> > Hey everyone, I want to highlight again to those who missed it that
> > if you are aware of any 2.7.0 release blockers, you should add it as
> > a blocker in JIRA with a target version of 2.7.0. It is very
> > helpful to know this information in advance. As of right now, there
> > are no such blockers listed in JIRA, and I will be cutting the
> > release branch on Wednesday 8/29.
> >
> > Best,
> > Charles
> >
> > On Fri, Aug 24, 2018 at 2:38 PM Charles Chen <ccy@google.com
> > <ma...@google.com>> wrote:
> >
> > Thanks everyone. Again, we will proceed with the initial
> > release cut on August 29.
> >
> > A reminder to please tag any blocking issues as "Priority:
> > Blocker" and "Fix version: 2.7.0" in JIRA. We recently
> > resolved https://issues.apache.org/jira/browse/BEAM-5180, and
> > there are no other blocking bugs at the moment.
> >
> > On Thu, Aug 23, 2018 at 8:19 PM Griselda Cuevas <gris@google.com
> > <ma...@google.com>> wrote:
> >
> > +1 Thanks for volunteering and keeping us in schedule!
> >
> >
> >
> >
> > On Thu, 23 Aug 2018 at 11:58, Udi Meiri <ehudm@google.com
> > <ma...@google.com>> wrote:
> >
> > +1
> >
> > On Mon, Aug 20, 2018 at 3:33 PM Boyuan Zhang
> > <boyuanz@google.com <ma...@google.com>> wrote:
> >
> > +1
> > Thanks for volunteering, Charles!
> >
> > On Mon, Aug 20, 2018 at 3:22 PM Rafael Fernandez
> > <rfernand@google.com <ma...@google.com>>
> > wrote:
> >
> > +1, thanks for volunteering, Charles!
> >
> > On Mon, Aug 20, 2018 at 12:09 PM Charles Chen
> > <ccy@google.com <ma...@google.com>> wrote:
> >
> > Thank you Andrew for pointing out my
> > mistake. We should follow the calendar and
> > aim to cut on 8/29, not 9/7 as I incorrectly
> > wrote earlier.
> >
> > On Mon, Aug 20, 2018 at 12:02 PM Andrew
> > Pilloud <apilloud@google.com
> > <ma...@google.com>> wrote:
> >
> > +1 Thanks for volunteering! The calendar
> > I have puts the cut date at August 29th,
> > which looks to be 6 weeks from when
> > 2.6.0 was cut. Do I have the wrong
> calendar?
> >
> > See:
> >
> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com&ctz=America%2FLos_Angeles
> >
> > Andrew
> >
> > On Mon, Aug 20, 2018 at 11:43 AM Connell
> > O'Callaghan <connello@google.com
> > <ma...@google.com>> wrote:
> >
> > +1 Charles thank you for taking this
> > up and helping us maintain this
> > schedule.
> >
> > On Mon, Aug 20, 2018 at 11:29 AM
> > Charles Chen <ccy@google.com
> > <ma...@google.com>> wrote:
> >
> > Hey everyone,
> >
> > Our release calendar indicates
> > that the process for the 2.7.0
> > Beam release should start on
> > September 7.
> >
> > I volunteer to perform this
> > release and propose the
> > following schedule:
> >
> > * We start triaging issues in
> > JIRA this week.
> > * I will cut the initial 2.7.0
> > release branch on September
> 7.
> > * After September 7, any
> > blockers will need to be
> > manually cherry-picked into
> > the release branch.
> > * After tests pass and
> > blockers are fully
> > addressed, I will move on
> > and perform other release
> tasks.
> >
> > What do you think?
> >
> > Best,
> > Charles
> >
>
> --
> Jean-Baptiste Onofré
> jbonofre@apache.org
> http://blog.nanthrax.net
> Talend - http://www.talend.com
>
Re: [PROPOSAL] Prepare Beam 2.7.0 release
Posted by Jean-Baptiste Onofré <jb...@nanthrax.net>.
It sounds good to me. I'm late on my PRs, but not release blocker
anyway. I will wait the next release cycle ;)
Regards
JB
On 29/08/2018 21:18, Charles Chen wrote:
> I have cut the release branch for 2.7.0, since there continue to be no
> blockers listed in JIRA. I will build the first release candidate soon.
>
> On Mon, Aug 27, 2018 at 10:38 PM Charles Chen <ccy@google.com
> <ma...@google.com>> wrote:
>
> Hey everyone, I want to highlight again to those who missed it that
> if you are aware of any 2.7.0 release blockers, you should add it as
> a blocker in JIRA with a target version of 2.7.0. It is very
> helpful to know this information in advance. As of right now, there
> are no such blockers listed in JIRA, and I will be cutting the
> release branch on Wednesday 8/29.
>
> Best,
> Charles
>
> On Fri, Aug 24, 2018 at 2:38 PM Charles Chen <ccy@google.com
> <ma...@google.com>> wrote:
>
> Thanks everyone. Again, we will proceed with the initial
> release cut on August 29.
>
> A reminder to please tag any blocking issues as "Priority:
> Blocker" and "Fix version: 2.7.0" in JIRA. We recently
> resolved https://issues.apache.org/jira/browse/BEAM-5180, and
> there are no other blocking bugs at the moment.
>
> On Thu, Aug 23, 2018 at 8:19 PM Griselda Cuevas <gris@google.com
> <ma...@google.com>> wrote:
>
> +1 Thanks for volunteering and keeping us in schedule!
>
>
>
>
> On Thu, 23 Aug 2018 at 11:58, Udi Meiri <ehudm@google.com
> <ma...@google.com>> wrote:
>
> +1
>
> On Mon, Aug 20, 2018 at 3:33 PM Boyuan Zhang
> <boyuanz@google.com <ma...@google.com>> wrote:
>
> +1
> Thanks for volunteering, Charles!
>
> On Mon, Aug 20, 2018 at 3:22 PM Rafael Fernandez
> <rfernand@google.com <ma...@google.com>>
> wrote:
>
> +1, thanks for volunteering, Charles!
>
> On Mon, Aug 20, 2018 at 12:09 PM Charles Chen
> <ccy@google.com <ma...@google.com>> wrote:
>
> Thank you Andrew for pointing out my
> mistake. We should follow the calendar and
> aim to cut on 8/29, not 9/7 as I incorrectly
> wrote earlier.
>
> On Mon, Aug 20, 2018 at 12:02 PM Andrew
> Pilloud <apilloud@google.com
> <ma...@google.com>> wrote:
>
> +1 Thanks for volunteering! The calendar
> I have puts the cut date at August 29th,
> which looks to be 6 weeks from when
> 2.6.0 was cut. Do I have the wrong calendar?
>
> See:
> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com&ctz=America%2FLos_Angeles
>
> Andrew
>
> On Mon, Aug 20, 2018 at 11:43 AM Connell
> O'Callaghan <connello@google.com
> <ma...@google.com>> wrote:
>
> +1 Charles thank you for taking this
> up and helping us maintain this
> schedule.
>
> On Mon, Aug 20, 2018 at 11:29 AM
> Charles Chen <ccy@google.com
> <ma...@google.com>> wrote:
>
> Hey everyone,
>
> Our release calendar indicates
> that the process for the 2.7.0
> Beam release should start on
> September 7.
>
> I volunteer to perform this
> release and propose the
> following schedule:
>
> * We start triaging issues in
> JIRA this week.
> * I will cut the initial 2.7.0
> release branch on September 7.
> * After September 7, any
> blockers will need to be
> manually cherry-picked into
> the release branch.
> * After tests pass and
> blockers are fully
> addressed, I will move on
> and perform other release tasks.
>
> What do you think?
>
> Best,
> Charles
>
--
Jean-Baptiste Onofré
jbonofre@apache.org
http://blog.nanthrax.net
Talend - http://www.talend.com
Re: [PROPOSAL] Prepare Beam 2.7.0 release
Posted by Charles Chen <cc...@google.com>.
I have cut the release branch for 2.7.0, since there continue to be no
blockers listed in JIRA. I will build the first release candidate soon.
On Mon, Aug 27, 2018 at 10:38 PM Charles Chen <cc...@google.com> wrote:
> Hey everyone, I want to highlight again to those who missed it that if you
> are aware of any 2.7.0 release blockers, you should add it as a blocker in
> JIRA with a target version of 2.7.0. It is very helpful to know this
> information in advance. As of right now, there are no such blockers listed
> in JIRA, and I will be cutting the release branch on Wednesday 8/29.
>
> Best,
> Charles
>
> On Fri, Aug 24, 2018 at 2:38 PM Charles Chen <cc...@google.com> wrote:
>
>> Thanks everyone. Again, we will proceed with the initial release cut on
>> August 29.
>>
>> A reminder to please tag any blocking issues as "Priority: Blocker" and
>> "Fix version: 2.7.0" in JIRA. We recently resolved
>> https://issues.apache.org/jira/browse/BEAM-5180, and there are no other
>> blocking bugs at the moment.
>>
>> On Thu, Aug 23, 2018 at 8:19 PM Griselda Cuevas <gr...@google.com> wrote:
>>
>>> +1 Thanks for volunteering and keeping us in schedule!
>>>
>>>
>>>
>>>
>>> On Thu, 23 Aug 2018 at 11:58, Udi Meiri <eh...@google.com> wrote:
>>>
>>>> +1
>>>>
>>>> On Mon, Aug 20, 2018 at 3:33 PM Boyuan Zhang <bo...@google.com>
>>>> wrote:
>>>>
>>>>> +1
>>>>> Thanks for volunteering, Charles!
>>>>>
>>>>> On Mon, Aug 20, 2018 at 3:22 PM Rafael Fernandez <rf...@google.com>
>>>>> wrote:
>>>>>
>>>>>> +1, thanks for volunteering, Charles!
>>>>>>
>>>>>> On Mon, Aug 20, 2018 at 12:09 PM Charles Chen <cc...@google.com> wrote:
>>>>>>
>>>>>>> Thank you Andrew for pointing out my mistake. We should follow the
>>>>>>> calendar and aim to cut on 8/29, not 9/7 as I incorrectly wrote earlier.
>>>>>>>
>>>>>>> On Mon, Aug 20, 2018 at 12:02 PM Andrew Pilloud <ap...@google.com>
>>>>>>> wrote:
>>>>>>>
>>>>>>>> +1 Thanks for volunteering! The calendar I have puts the cut date
>>>>>>>> at August 29th, which looks to be 6 weeks from when 2.6.0 was cut. Do I
>>>>>>>> have the wrong calendar?
>>>>>>>>
>>>>>>>> See:
>>>>>>>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com&ctz=America%2FLos_Angeles
>>>>>>>>
>>>>>>>> Andrew
>>>>>>>>
>>>>>>>> On Mon, Aug 20, 2018 at 11:43 AM Connell O'Callaghan <
>>>>>>>> connello@google.com> wrote:
>>>>>>>>
>>>>>>>>> +1 Charles thank you for taking this up and helping us maintain
>>>>>>>>> this schedule.
>>>>>>>>>
>>>>>>>>> On Mon, Aug 20, 2018 at 11:29 AM Charles Chen <cc...@google.com>
>>>>>>>>> wrote:
>>>>>>>>>
>>>>>>>>>> Hey everyone,
>>>>>>>>>>
>>>>>>>>>> Our release calendar indicates that the process for the 2.7.0
>>>>>>>>>> Beam release should start on September 7.
>>>>>>>>>>
>>>>>>>>>> I volunteer to perform this release and propose the following
>>>>>>>>>> schedule:
>>>>>>>>>>
>>>>>>>>>> - We start triaging issues in JIRA this week.
>>>>>>>>>> - I will cut the initial 2.7.0 release branch on September 7.
>>>>>>>>>> - After September 7, any blockers will need to be manually
>>>>>>>>>> cherry-picked into the release branch.
>>>>>>>>>> - After tests pass and blockers are fully addressed, I will
>>>>>>>>>> move on and perform other release tasks.
>>>>>>>>>>
>>>>>>>>>> What do you think?
>>>>>>>>>>
>>>>>>>>>> Best,
>>>>>>>>>> Charles
>>>>>>>>>>
>>>>>>>>>
Re: [PROPOSAL] Prepare Beam 2.7.0 release
Posted by Charles Chen <cc...@google.com>.
Hey everyone, I want to highlight again to those who missed it that if you
are aware of any 2.7.0 release blockers, you should add it as a blocker in
JIRA with a target version of 2.7.0. It is very helpful to know this
information in advance. As of right now, there are no such blockers listed
in JIRA, and I will be cutting the release branch on Wednesday 8/29.
Best,
Charles
On Fri, Aug 24, 2018 at 2:38 PM Charles Chen <cc...@google.com> wrote:
> Thanks everyone. Again, we will proceed with the initial release cut on
> August 29.
>
> A reminder to please tag any blocking issues as "Priority: Blocker" and
> "Fix version: 2.7.0" in JIRA. We recently resolved
> https://issues.apache.org/jira/browse/BEAM-5180, and there are no other
> blocking bugs at the moment.
>
> On Thu, Aug 23, 2018 at 8:19 PM Griselda Cuevas <gr...@google.com> wrote:
>
>> +1 Thanks for volunteering and keeping us in schedule!
>>
>>
>>
>>
>> On Thu, 23 Aug 2018 at 11:58, Udi Meiri <eh...@google.com> wrote:
>>
>>> +1
>>>
>>> On Mon, Aug 20, 2018 at 3:33 PM Boyuan Zhang <bo...@google.com> wrote:
>>>
>>>> +1
>>>> Thanks for volunteering, Charles!
>>>>
>>>> On Mon, Aug 20, 2018 at 3:22 PM Rafael Fernandez <rf...@google.com>
>>>> wrote:
>>>>
>>>>> +1, thanks for volunteering, Charles!
>>>>>
>>>>> On Mon, Aug 20, 2018 at 12:09 PM Charles Chen <cc...@google.com> wrote:
>>>>>
>>>>>> Thank you Andrew for pointing out my mistake. We should follow the
>>>>>> calendar and aim to cut on 8/29, not 9/7 as I incorrectly wrote earlier.
>>>>>>
>>>>>> On Mon, Aug 20, 2018 at 12:02 PM Andrew Pilloud <ap...@google.com>
>>>>>> wrote:
>>>>>>
>>>>>>> +1 Thanks for volunteering! The calendar I have puts the cut date at
>>>>>>> August 29th, which looks to be 6 weeks from when 2.6.0 was cut. Do I have
>>>>>>> the wrong calendar?
>>>>>>>
>>>>>>> See:
>>>>>>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com&ctz=America%2FLos_Angeles
>>>>>>>
>>>>>>> Andrew
>>>>>>>
>>>>>>> On Mon, Aug 20, 2018 at 11:43 AM Connell O'Callaghan <
>>>>>>> connello@google.com> wrote:
>>>>>>>
>>>>>>>> +1 Charles thank you for taking this up and helping us maintain
>>>>>>>> this schedule.
>>>>>>>>
>>>>>>>> On Mon, Aug 20, 2018 at 11:29 AM Charles Chen <cc...@google.com>
>>>>>>>> wrote:
>>>>>>>>
>>>>>>>>> Hey everyone,
>>>>>>>>>
>>>>>>>>> Our release calendar indicates that the process for the 2.7.0 Beam
>>>>>>>>> release should start on September 7.
>>>>>>>>>
>>>>>>>>> I volunteer to perform this release and propose the following
>>>>>>>>> schedule:
>>>>>>>>>
>>>>>>>>> - We start triaging issues in JIRA this week.
>>>>>>>>> - I will cut the initial 2.7.0 release branch on September 7.
>>>>>>>>> - After September 7, any blockers will need to be manually
>>>>>>>>> cherry-picked into the release branch.
>>>>>>>>> - After tests pass and blockers are fully addressed, I will
>>>>>>>>> move on and perform other release tasks.
>>>>>>>>>
>>>>>>>>> What do you think?
>>>>>>>>>
>>>>>>>>> Best,
>>>>>>>>> Charles
>>>>>>>>>
>>>>>>>>
Re: [PROPOSAL] Prepare Beam 2.7.0 release
Posted by Charles Chen <cc...@google.com>.
Thanks everyone. Again, we will proceed with the initial release cut on
August 29.
A reminder to please tag any blocking issues as "Priority: Blocker" and
"Fix version: 2.7.0" in JIRA. We recently resolved
https://issues.apache.org/jira/browse/BEAM-5180, and there are no other
blocking bugs at the moment.
On Thu, Aug 23, 2018 at 8:19 PM Griselda Cuevas <gr...@google.com> wrote:
> +1 Thanks for volunteering and keeping us in schedule!
>
>
>
>
> On Thu, 23 Aug 2018 at 11:58, Udi Meiri <eh...@google.com> wrote:
>
>> +1
>>
>> On Mon, Aug 20, 2018 at 3:33 PM Boyuan Zhang <bo...@google.com> wrote:
>>
>>> +1
>>> Thanks for volunteering, Charles!
>>>
>>> On Mon, Aug 20, 2018 at 3:22 PM Rafael Fernandez <rf...@google.com>
>>> wrote:
>>>
>>>> +1, thanks for volunteering, Charles!
>>>>
>>>> On Mon, Aug 20, 2018 at 12:09 PM Charles Chen <cc...@google.com> wrote:
>>>>
>>>>> Thank you Andrew for pointing out my mistake. We should follow the
>>>>> calendar and aim to cut on 8/29, not 9/7 as I incorrectly wrote earlier.
>>>>>
>>>>> On Mon, Aug 20, 2018 at 12:02 PM Andrew Pilloud <ap...@google.com>
>>>>> wrote:
>>>>>
>>>>>> +1 Thanks for volunteering! The calendar I have puts the cut date at
>>>>>> August 29th, which looks to be 6 weeks from when 2.6.0 was cut. Do I have
>>>>>> the wrong calendar?
>>>>>>
>>>>>> See:
>>>>>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com&ctz=America%2FLos_Angeles
>>>>>>
>>>>>> Andrew
>>>>>>
>>>>>> On Mon, Aug 20, 2018 at 11:43 AM Connell O'Callaghan <
>>>>>> connello@google.com> wrote:
>>>>>>
>>>>>>> +1 Charles thank you for taking this up and helping us maintain this
>>>>>>> schedule.
>>>>>>>
>>>>>>> On Mon, Aug 20, 2018 at 11:29 AM Charles Chen <cc...@google.com>
>>>>>>> wrote:
>>>>>>>
>>>>>>>> Hey everyone,
>>>>>>>>
>>>>>>>> Our release calendar indicates that the process for the 2.7.0 Beam
>>>>>>>> release should start on September 7.
>>>>>>>>
>>>>>>>> I volunteer to perform this release and propose the following
>>>>>>>> schedule:
>>>>>>>>
>>>>>>>> - We start triaging issues in JIRA this week.
>>>>>>>> - I will cut the initial 2.7.0 release branch on September 7.
>>>>>>>> - After September 7, any blockers will need to be manually
>>>>>>>> cherry-picked into the release branch.
>>>>>>>> - After tests pass and blockers are fully addressed, I will
>>>>>>>> move on and perform other release tasks.
>>>>>>>>
>>>>>>>> What do you think?
>>>>>>>>
>>>>>>>> Best,
>>>>>>>> Charles
>>>>>>>>
>>>>>>>
Re: [PROPOSAL] Prepare Beam 2.7.0 release
Posted by Griselda Cuevas <gr...@google.com>.
+1 Thanks for volunteering and keeping us in schedule!
On Thu, 23 Aug 2018 at 11:58, Udi Meiri <eh...@google.com> wrote:
> +1
>
> On Mon, Aug 20, 2018 at 3:33 PM Boyuan Zhang <bo...@google.com> wrote:
>
>> +1
>> Thanks for volunteering, Charles!
>>
>> On Mon, Aug 20, 2018 at 3:22 PM Rafael Fernandez <rf...@google.com>
>> wrote:
>>
>>> +1, thanks for volunteering, Charles!
>>>
>>> On Mon, Aug 20, 2018 at 12:09 PM Charles Chen <cc...@google.com> wrote:
>>>
>>>> Thank you Andrew for pointing out my mistake. We should follow the
>>>> calendar and aim to cut on 8/29, not 9/7 as I incorrectly wrote earlier.
>>>>
>>>> On Mon, Aug 20, 2018 at 12:02 PM Andrew Pilloud <ap...@google.com>
>>>> wrote:
>>>>
>>>>> +1 Thanks for volunteering! The calendar I have puts the cut date at
>>>>> August 29th, which looks to be 6 weeks from when 2.6.0 was cut. Do I have
>>>>> the wrong calendar?
>>>>>
>>>>> See:
>>>>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com&ctz=America%2FLos_Angeles
>>>>>
>>>>> Andrew
>>>>>
>>>>> On Mon, Aug 20, 2018 at 11:43 AM Connell O'Callaghan <
>>>>> connello@google.com> wrote:
>>>>>
>>>>>> +1 Charles thank you for taking this up and helping us maintain this
>>>>>> schedule.
>>>>>>
>>>>>> On Mon, Aug 20, 2018 at 11:29 AM Charles Chen <cc...@google.com> wrote:
>>>>>>
>>>>>>> Hey everyone,
>>>>>>>
>>>>>>> Our release calendar indicates that the process for the 2.7.0 Beam
>>>>>>> release should start on September 7.
>>>>>>>
>>>>>>> I volunteer to perform this release and propose the following
>>>>>>> schedule:
>>>>>>>
>>>>>>> - We start triaging issues in JIRA this week.
>>>>>>> - I will cut the initial 2.7.0 release branch on September 7.
>>>>>>> - After September 7, any blockers will need to be manually
>>>>>>> cherry-picked into the release branch.
>>>>>>> - After tests pass and blockers are fully addressed, I will move
>>>>>>> on and perform other release tasks.
>>>>>>>
>>>>>>> What do you think?
>>>>>>>
>>>>>>> Best,
>>>>>>> Charles
>>>>>>>
>>>>>>
Re: [PROPOSAL] Prepare Beam 2.7.0 release
Posted by Udi Meiri <eh...@google.com>.
+1
On Mon, Aug 20, 2018 at 3:33 PM Boyuan Zhang <bo...@google.com> wrote:
> +1
> Thanks for volunteering, Charles!
>
> On Mon, Aug 20, 2018 at 3:22 PM Rafael Fernandez <rf...@google.com>
> wrote:
>
>> +1, thanks for volunteering, Charles!
>>
>> On Mon, Aug 20, 2018 at 12:09 PM Charles Chen <cc...@google.com> wrote:
>>
>>> Thank you Andrew for pointing out my mistake. We should follow the
>>> calendar and aim to cut on 8/29, not 9/7 as I incorrectly wrote earlier.
>>>
>>> On Mon, Aug 20, 2018 at 12:02 PM Andrew Pilloud <ap...@google.com>
>>> wrote:
>>>
>>>> +1 Thanks for volunteering! The calendar I have puts the cut date at
>>>> August 29th, which looks to be 6 weeks from when 2.6.0 was cut. Do I have
>>>> the wrong calendar?
>>>>
>>>> See:
>>>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com&ctz=America%2FLos_Angeles
>>>>
>>>> Andrew
>>>>
>>>> On Mon, Aug 20, 2018 at 11:43 AM Connell O'Callaghan <
>>>> connello@google.com> wrote:
>>>>
>>>>> +1 Charles thank you for taking this up and helping us maintain this
>>>>> schedule.
>>>>>
>>>>> On Mon, Aug 20, 2018 at 11:29 AM Charles Chen <cc...@google.com> wrote:
>>>>>
>>>>>> Hey everyone,
>>>>>>
>>>>>> Our release calendar indicates that the process for the 2.7.0 Beam
>>>>>> release should start on September 7.
>>>>>>
>>>>>> I volunteer to perform this release and propose the following
>>>>>> schedule:
>>>>>>
>>>>>> - We start triaging issues in JIRA this week.
>>>>>> - I will cut the initial 2.7.0 release branch on September 7.
>>>>>> - After September 7, any blockers will need to be manually
>>>>>> cherry-picked into the release branch.
>>>>>> - After tests pass and blockers are fully addressed, I will move
>>>>>> on and perform other release tasks.
>>>>>>
>>>>>> What do you think?
>>>>>>
>>>>>> Best,
>>>>>> Charles
>>>>>>
>>>>>
Re: [PROPOSAL] Prepare Beam 2.7.0 release
Posted by Boyuan Zhang <bo...@google.com>.
+1
Thanks for volunteering, Charles!
On Mon, Aug 20, 2018 at 3:22 PM Rafael Fernandez <rf...@google.com>
wrote:
> +1, thanks for volunteering, Charles!
>
> On Mon, Aug 20, 2018 at 12:09 PM Charles Chen <cc...@google.com> wrote:
>
>> Thank you Andrew for pointing out my mistake. We should follow the
>> calendar and aim to cut on 8/29, not 9/7 as I incorrectly wrote earlier.
>>
>> On Mon, Aug 20, 2018 at 12:02 PM Andrew Pilloud <ap...@google.com>
>> wrote:
>>
>>> +1 Thanks for volunteering! The calendar I have puts the cut date at
>>> August 29th, which looks to be 6 weeks from when 2.6.0 was cut. Do I have
>>> the wrong calendar?
>>>
>>> See:
>>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com&ctz=America%2FLos_Angeles
>>>
>>> Andrew
>>>
>>> On Mon, Aug 20, 2018 at 11:43 AM Connell O'Callaghan <
>>> connello@google.com> wrote:
>>>
>>>> +1 Charles thank you for taking this up and helping us maintain this
>>>> schedule.
>>>>
>>>> On Mon, Aug 20, 2018 at 11:29 AM Charles Chen <cc...@google.com> wrote:
>>>>
>>>>> Hey everyone,
>>>>>
>>>>> Our release calendar indicates that the process for the 2.7.0 Beam
>>>>> release should start on September 7.
>>>>>
>>>>> I volunteer to perform this release and propose the following schedule:
>>>>>
>>>>> - We start triaging issues in JIRA this week.
>>>>> - I will cut the initial 2.7.0 release branch on September 7.
>>>>> - After September 7, any blockers will need to be manually
>>>>> cherry-picked into the release branch.
>>>>> - After tests pass and blockers are fully addressed, I will move
>>>>> on and perform other release tasks.
>>>>>
>>>>> What do you think?
>>>>>
>>>>> Best,
>>>>> Charles
>>>>>
>>>>
Re: [PROPOSAL] Prepare Beam 2.7.0 release
Posted by Rafael Fernandez <rf...@google.com>.
+1, thanks for volunteering, Charles!
On Mon, Aug 20, 2018 at 12:09 PM Charles Chen <cc...@google.com> wrote:
> Thank you Andrew for pointing out my mistake. We should follow the
> calendar and aim to cut on 8/29, not 9/7 as I incorrectly wrote earlier.
>
> On Mon, Aug 20, 2018 at 12:02 PM Andrew Pilloud <ap...@google.com>
> wrote:
>
>> +1 Thanks for volunteering! The calendar I have puts the cut date at
>> August 29th, which looks to be 6 weeks from when 2.6.0 was cut. Do I have
>> the wrong calendar?
>>
>> See:
>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com&ctz=America%2FLos_Angeles
>>
>> Andrew
>>
>> On Mon, Aug 20, 2018 at 11:43 AM Connell O'Callaghan <co...@google.com>
>> wrote:
>>
>>> +1 Charles thank you for taking this up and helping us maintain this
>>> schedule.
>>>
>>> On Mon, Aug 20, 2018 at 11:29 AM Charles Chen <cc...@google.com> wrote:
>>>
>>>> Hey everyone,
>>>>
>>>> Our release calendar indicates that the process for the 2.7.0 Beam
>>>> release should start on September 7.
>>>>
>>>> I volunteer to perform this release and propose the following schedule:
>>>>
>>>> - We start triaging issues in JIRA this week.
>>>> - I will cut the initial 2.7.0 release branch on September 7.
>>>> - After September 7, any blockers will need to be manually
>>>> cherry-picked into the release branch.
>>>> - After tests pass and blockers are fully addressed, I will move on
>>>> and perform other release tasks.
>>>>
>>>> What do you think?
>>>>
>>>> Best,
>>>> Charles
>>>>
>>>
Re: [PROPOSAL] Prepare Beam 2.7.0 release
Posted by Charles Chen <cc...@google.com>.
Thank you Andrew for pointing out my mistake. We should follow the
calendar and aim to cut on 8/29, not 9/7 as I incorrectly wrote earlier.
On Mon, Aug 20, 2018 at 12:02 PM Andrew Pilloud <ap...@google.com> wrote:
> +1 Thanks for volunteering! The calendar I have puts the cut date at
> August 29th, which looks to be 6 weeks from when 2.6.0 was cut. Do I have
> the wrong calendar?
>
> See:
> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com&ctz=America%2FLos_Angeles
>
> Andrew
>
> On Mon, Aug 20, 2018 at 11:43 AM Connell O'Callaghan <co...@google.com>
> wrote:
>
>> +1 Charles thank you for taking this up and helping us maintain this
>> schedule.
>>
>> On Mon, Aug 20, 2018 at 11:29 AM Charles Chen <cc...@google.com> wrote:
>>
>>> Hey everyone,
>>>
>>> Our release calendar indicates that the process for the 2.7.0 Beam
>>> release should start on September 7.
>>>
>>> I volunteer to perform this release and propose the following schedule:
>>>
>>> - We start triaging issues in JIRA this week.
>>> - I will cut the initial 2.7.0 release branch on September 7.
>>> - After September 7, any blockers will need to be manually
>>> cherry-picked into the release branch.
>>> - After tests pass and blockers are fully addressed, I will move on
>>> and perform other release tasks.
>>>
>>> What do you think?
>>>
>>> Best,
>>> Charles
>>>
>>
Re: [PROPOSAL] Prepare Beam 2.7.0 release
Posted by Andrew Pilloud <ap...@google.com>.
+1 Thanks for volunteering! The calendar I have puts the cut date at August
29th, which looks to be 6 weeks from when 2.6.0 was cut. Do I have the
wrong calendar?
See:
https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com&ctz=America%2FLos_Angeles
Andrew
On Mon, Aug 20, 2018 at 11:43 AM Connell O'Callaghan <co...@google.com>
wrote:
> +1 Charles thank you for taking this up and helping us maintain this
> schedule.
>
> On Mon, Aug 20, 2018 at 11:29 AM Charles Chen <cc...@google.com> wrote:
>
>> Hey everyone,
>>
>> Our release calendar indicates that the process for the 2.7.0 Beam
>> release should start on September 7.
>>
>> I volunteer to perform this release and propose the following schedule:
>>
>> - We start triaging issues in JIRA this week.
>> - I will cut the initial 2.7.0 release branch on September 7.
>> - After September 7, any blockers will need to be manually
>> cherry-picked into the release branch.
>> - After tests pass and blockers are fully addressed, I will move on
>> and perform other release tasks.
>>
>> What do you think?
>>
>> Best,
>> Charles
>>
>
Re: [PROPOSAL] Prepare Beam 2.7.0 release
Posted by Connell O'Callaghan <co...@google.com>.
+1 Charles thank you for taking this up and helping us maintain this
schedule.
On Mon, Aug 20, 2018 at 11:29 AM Charles Chen <cc...@google.com> wrote:
> Hey everyone,
>
> Our release calendar indicates that the process for the 2.7.0 Beam release
> should start on September 7.
>
> I volunteer to perform this release and propose the following schedule:
>
> - We start triaging issues in JIRA this week.
> - I will cut the initial 2.7.0 release branch on September 7.
> - After September 7, any blockers will need to be manually
> cherry-picked into the release branch.
> - After tests pass and blockers are fully addressed, I will move on
> and perform other release tasks.
>
> What do you think?
>
> Best,
> Charles
>