You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hbase.apache.org by "Enis Soztutar (JIRA)" <ji...@apache.org> on 2015/10/16 23:28:05 UTC
[jira] [Commented] (HBASE-14625) Chaos Monkey should shut down
faster
[ https://issues.apache.org/jira/browse/HBASE-14625?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14961381#comment-14961381 ]
Enis Soztutar commented on HBASE-14625:
---------------------------------------
LGTM. We do not interrupt the CM after the test run because we want to have it clean up after itself as much as possible. This is a good middle ground that will at least have it not carry the actions in full.
If CM is sleeping etc, we will still wait until sleep interval is complete.
> Chaos Monkey should shut down faster
> ------------------------------------
>
> Key: HBASE-14625
> URL: https://issues.apache.org/jira/browse/HBASE-14625
> Project: HBase
> Issue Type: Bug
> Components: integration tests, test
> Affects Versions: 2.0.0, 1.2.0
> Reporter: Elliott Clark
> Assignee: Elliott Clark
> Attachments: HBASE-14625.patch
>
>
> Right now we have a couple of tests clusters that are just cycling through IT tests. There's a pretty sizable gap between the last MR job stopping and the next one starting. It's almost always waiting on an action to finish.
> {code}
> "main" #1 prio=5 os_prio=0 tid=0x00007f455000d800 nid=0x2a2773 in Object.wait() [0x00007f4556e42000]
> java.lang.Thread.State: WAITING (on object monitor)
> at java.lang.Object.wait(Native Method)
> at java.lang.Thread.join(Thread.java:1245)
> - locked <0x00000003ef054138> (a java.lang.Thread)
> at java.lang.Thread.join(Thread.java:1319)
> at org.apache.hadoop.hbase.chaos.monkies.PolicyBasedChaosMonkey.waitForStop(PolicyBasedChaosMonkey.java:149)
> at org.apache.hadoop.hbase.IntegrationTestBase.cleanUpMonkey(IntegrationTestBase.java:173)
> at org.apache.hadoop.hbase.IntegrationTestBase.cleanUpMonkey(IntegrationTestBase.java:167)
> at org.apache.hadoop.hbase.IntegrationTestBase.cleanUp(IntegrationTestBase.java:139)
> at org.apache.hadoop.hbase.IntegrationTestBase.doWork(IntegrationTestBase.java:125)
> at org.apache.hadoop.hbase.util.AbstractHBaseTool.run(AbstractHBaseTool.java:112)
> at org.apache.hadoop.util.ToolRunner.run(ToolRunner.java:70)
> at org.apache.hadoop.hbase.test.IntegrationTestBigLinkedList.main(IntegrationTestBigLinkedList.java:1686)
> {code}
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)