You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@continuum.apache.org by "Wendy Smoak (JIRA)" <ji...@codehaus.org> on 2009/06/05 22:42:41 UTC
[jira] Created: (CONTINUUM-2262) Display the date on the scm result
Display the date on the scm result
----------------------------------
Key: CONTINUUM-2262
URL: http://jira.codehaus.org/browse/CONTINUUM-2262
Project: Continuum
Issue Type: Improvement
Affects Versions: 1.3.3
Environment: 1.3.3, 1.3.4-SNAPSHOT r781487 on vmbuild
Reporter: Wendy Smoak
Priority: Minor
Currently when viewing an scm result, there is no way to tell when an error happened.
The date should be displayed both on the Project Group Summary (similar to the Last Build Date column) and on the SCM result detail page.
See the screen shots attached to [the otherwise unrelated] CONTINUUM-2261.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://jira.codehaus.org/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
[jira] (CONTINUUM-2262) Display the date on the scm result
Posted by "Brett Porter (JIRA)" <ji...@codehaus.org>.
[ https://jira.codehaus.org/browse/CONTINUUM-2262?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Brett Porter updated CONTINUUM-2262:
------------------------------------
Patch Submitted: Yes
> Display the date on the scm result
> ----------------------------------
>
> Key: CONTINUUM-2262
> URL: https://jira.codehaus.org/browse/CONTINUUM-2262
> Project: Continuum
> Issue Type: Improvement
> Affects Versions: 1.3.3 (Beta)
> Environment: 1.3.3, 1.3.4-SNAPSHOT r781487 on vmbuild
> Reporter: Wendy Smoak
> Priority: Minor
> Labels: backlog-to-cleanup
> Attachments: CONTINUUM-2262-wsmoak-20090605-1.patch
>
>
> Currently when viewing an scm result, there is no way to tell when an error happened.
> The date should be displayed both on the Project Group Summary (similar to the Last Build Date column) and on the SCM result detail page.
> See the screen shots attached to [the otherwise unrelated] CONTINUUM-2261.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://jira.codehaus.org/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira
[jira] Updated: (CONTINUUM-2262) Display the date on the scm result
Posted by "Wendy Smoak (JIRA)" <ji...@codehaus.org>.
[ http://jira.codehaus.org/browse/CONTINUUM-2262?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Wendy Smoak updated CONTINUUM-2262:
-----------------------------------
Attachment: CONTINUUM-2262-wsmoak-20090605-1.patch
Attaching work in progress. I've added the field to the model and put it on both of the pages, but haven't managed to get the field populated yet.
Notes:
projectGroupSummary.jsp
-> contains projectSummaryComponent.jsp
- has Last Build Date column
- needs date for the scm result as well
What does cell="date" do in <ec:column> ?
scmResult.jsp should also show the scm result date
ScmResult.java has no date field and is generated code.
Need to add a date field to continuum-model continuum.xml
- based on the other date fields, it needs to be a long
- name of field can't be 'date' because it's reserved by some DBMS
Now that ScmResult has a date field (named scmResultDate), search for usages of ScmResult class
Found updateWorkingDirectoryFromScmContinuumAction.java and added
result.setScmResultDate( new Date().getTime() );
- needs a unit test
To test this in the webapp, there is a sandbox project with a bad scm url:
http://svn.apache.org/repos/asf/continuum/sandbox/examples/bad-scm/pom.xml
add it and force a build to see the scm error.
> Display the date on the scm result
> ----------------------------------
>
> Key: CONTINUUM-2262
> URL: http://jira.codehaus.org/browse/CONTINUUM-2262
> Project: Continuum
> Issue Type: Improvement
> Affects Versions: 1.3.3
> Environment: 1.3.3, 1.3.4-SNAPSHOT r781487 on vmbuild
> Reporter: Wendy Smoak
> Priority: Minor
> Attachments: CONTINUUM-2262-wsmoak-20090605-1.patch
>
>
> Currently when viewing an scm result, there is no way to tell when an error happened.
> The date should be displayed both on the Project Group Summary (similar to the Last Build Date column) and on the SCM result detail page.
> See the screen shots attached to [the otherwise unrelated] CONTINUUM-2261.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://jira.codehaus.org/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira