You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Fabian Hueske (JIRA)" <ji...@apache.org> on 2015/11/16 14:44:14 UTC

[jira] [Updated] (FLINK-2523) Make task canceling interrupt interval configurable

     [ https://issues.apache.org/jira/browse/FLINK-2523?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Fabian Hueske updated FLINK-2523:
---------------------------------
    Fix Version/s:     (was: 0.10.0)
                   1.0.0

> Make task canceling interrupt interval configurable
> ---------------------------------------------------
>
>                 Key: FLINK-2523
>                 URL: https://issues.apache.org/jira/browse/FLINK-2523
>             Project: Flink
>          Issue Type: Improvement
>          Components: TaskManager
>    Affects Versions: 0.10.0
>            Reporter: Stephan Ewen
>            Assignee: Stephan Ewen
>             Fix For: 1.0.0
>
>
> When a task is canceled, the cancellation calls periodically "interrupt()" on the task thread, if the task thread does not cancel with a certain time.
> Currently, this value is hard coded to 10 seconds. We should make that time configurable.
> Until then, I would like to increase the value to 30 seconds, as many tasks (here I am observing it for Kafka consumers) can take longer then 10 seconds for proper cleanup.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)