You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@yunikorn.apache.org by "Wilfred Spiegelenburg (Jira)" <ji...@apache.org> on 2022/08/26 00:58:00 UTC
[jira] [Commented] (YUNIKORN-1297) constants missing after scheduler-interface build
[ https://issues.apache.org/jira/browse/YUNIKORN-1297?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17585080#comment-17585080 ]
Wilfred Spiegelenburg commented on YUNIKORN-1297:
-------------------------------------------------
Just fixing the build breakage to not stop the 1.1 release.
We need to fix the build process to prevent changes that break the overall integrated build. Tracking a breakage like this in a CI pipeline that builds everything from scratch is complex and time consuming.
> constants missing after scheduler-interface build
> -------------------------------------------------
>
> Key: YUNIKORN-1297
> URL: https://issues.apache.org/jira/browse/YUNIKORN-1297
> Project: Apache YuniKorn
> Issue Type: Bug
> Components: scheduler-interface
> Reporter: Wilfred Spiegelenburg
> Assignee: Wilfred Spiegelenburg
> Priority: Blocker
>
> The constant move in YUNIKORN-1122 has broken the build. Changes have been added to the generated constants.go file instead of to the definition file.
> That means a make build run against the scheduler-interface removes the newly added constants and future builds referencing the file do not work.
> This breaks the official releases (run from source tar ball) if anyone runs a make build on the scheduler-interface before building the rest of YuniKorn.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)
---------------------------------------------------------------------
To unsubscribe, e-mail: issues-unsubscribe@yunikorn.apache.org
For additional commands, e-mail: issues-help@yunikorn.apache.org