You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@cordova.apache.org by Filip Maj <fi...@adobe.com> on 2011/11/30 20:06:59 UTC

JIRA permissions

Doesn't look like I can edit a ticket with my JIRA account (filmaj).

What's the process for getting these permissions? Who is in control of that stuff?

Thanks for the clarification

Re: JIRA permissions

Posted by Filip Maj <fi...@adobe.com>.
Thanks Jukka!

On 11-11-30 11:44 AM, "Jukka Zitting" <ju...@gmail.com> wrote:

>Hi,
>
>On Wed, Nov 30, 2011 at 8:06 PM, Filip Maj <fi...@adobe.com> wrote:
>> Doesn't look like I can edit a ticket with my JIRA account (filmaj).
>
>Your account wasn't yet a member of the callback-developers group.
>I've fixed that now.
>
>> What's the process for getting these permissions?
>> Who is in control of that stuff?
>
>Only Jira administrators can modify groups. It's a usual setup to
>assign at least one trusted Jira admin per project so requests like
>this don't need to be routed through Jira. I can take care of that
>task for Callback until or unless one of you feels familiar enough
>with Jira to take over.
>
>The callback-developers group has full control over the CB project in
>Jira, so apart from changes to that group itself no extra rights are
>needed for anyone in that group (i.e. Callback/Cordova committers) to
>modify other settings of the CB project.
>
>BR,
>
>Jukka Zitting


Re: JIRA permissions

Posted by Jukka Zitting <ju...@gmail.com>.
Hi,

On Wed, Nov 30, 2011 at 8:06 PM, Filip Maj <fi...@adobe.com> wrote:
> Doesn't look like I can edit a ticket with my JIRA account (filmaj).

Your account wasn't yet a member of the callback-developers group.
I've fixed that now.

> What's the process for getting these permissions?
> Who is in control of that stuff?

Only Jira administrators can modify groups. It's a usual setup to
assign at least one trusted Jira admin per project so requests like
this don't need to be routed through Jira. I can take care of that
task for Callback until or unless one of you feels familiar enough
with Jira to take over.

The callback-developers group has full control over the CB project in
Jira, so apart from changes to that group itself no extra rights are
needed for anyone in that group (i.e. Callback/Cordova committers) to
modify other settings of the CB project.

BR,

Jukka Zitting