You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "sean.miao (JIRA)" <ji...@apache.org> on 2018/10/12 06:36:00 UTC

[jira] [Updated] (FLINK-10533) job parallelism equals task slots number but not use the same number of the task slots as the parallelism

     [ https://issues.apache.org/jira/browse/FLINK-10533?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

sean.miao updated FLINK-10533:
------------------------------
    Summary: job parallelism equals task slots number but not use the same number of the task slots as the parallelism  (was: job parallelism equals task slots number but not use all task slot)

> job parallelism equals task slots number but not use the same number of the task slots as the parallelism
> ---------------------------------------------------------------------------------------------------------
>
>                 Key: FLINK-10533
>                 URL: https://issues.apache.org/jira/browse/FLINK-10533
>             Project: Flink
>          Issue Type: Bug
>    Affects Versions: 1.5.3, 1.6.0, 1.6.1
>            Reporter: sean.miao
>            Priority: Major
>         Attachments: image-2018-10-12-10-35-57-443.png, image-2018-10-12-10-36-13-503.png
>
>
> i use the table api and do not use the datastream api。
>  
> my job has two graph and every parallelism is two.
> if give my job four slots but it just use two slots.
>  
> !image-2018-10-12-10-36-13-503.png!
> !image-2018-10-12-10-35-57-443.png!
>  
> thanks.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)