You are viewing a plain text version of this content. The canonical link for it is here.
Posted to commits@tapestry.apache.org by "Chris Poulsen (Jira)" <ji...@apache.org> on 2023/11/10 13:19:00 UTC
[jira] [Created] (TAP5-2769) Upgrade ASM to 9.6 to allow running on Java 21
Chris Poulsen created TAP5-2769:
-----------------------------------
Summary: Upgrade ASM to 9.6 to allow running on Java 21
Key: TAP5-2769
URL: https://issues.apache.org/jira/browse/TAP5-2769
Project: Tapestry 5
Issue Type: Task
Components: plastic
Affects Versions: 5.8.3
Reporter: Chris Poulsen
I have a local version where the shadowing of ASM is done by Gradle to easier maintain the ASM copy in the future.
I'll create a PR with the changes on Github.
The copied version had a single change to the ASM sources (in order to access the static package protected method `AnnotationNode.accept`.
I did a quick hack with reflection to access it instead, there is definitely room for improvement there, if anyone wants to take a stab at it.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)