You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Sihua Zhou (JIRA)" <ji...@apache.org> on 2018/03/16 15:11:00 UTC

[jira] [Commented] (FLINK-8976) End-to-end test: Resume with different parallelism

    [ https://issues.apache.org/jira/browse/FLINK-8976?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16402023#comment-16402023 ] 

Sihua Zhou commented on FLINK-8976:
-----------------------------------

Hi [~till.rohrmann] could I ask why this issue won't work with RocksDB incremental checkpoints?

> End-to-end test: Resume with different parallelism
> --------------------------------------------------
>
>                 Key: FLINK-8976
>                 URL: https://issues.apache.org/jira/browse/FLINK-8976
>             Project: Flink
>          Issue Type: Sub-task
>          Components: Tests
>    Affects Versions: 1.5.0
>            Reporter: Till Rohrmann
>            Assignee: Tzu-Li (Gordon) Tai
>            Priority: Blocker
>             Fix For: 1.5.0
>
>
> Similar to FLINK-8975, we should have an end-to-end test which resumes a job with a different parallelism after taking 
> a) a savepoint
> b) from the last retained checkpoint (this won't work with RocksDB incremental checkpoints) 



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)