You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@hbase.apache.org by "Enis Soztutar (JIRA)" <ji...@apache.org> on 2013/05/31 23:56:20 UTC
[jira] [Created] (HBASE-8670) [0.94] Backport HBASE-8449 to 0.94
(Refactor recoverLease retries and pauses)
Enis Soztutar created HBASE-8670:
------------------------------------
Summary: [0.94] Backport HBASE-8449 to 0.94 (Refactor recoverLease retries and pauses)
Key: HBASE-8670
URL: https://issues.apache.org/jira/browse/HBASE-8670
Project: HBase
Issue Type: Bug
Components: Filesystem Integration, master, wal
Reporter: Enis Soztutar
Assignee: Enis Soztutar
Fix For: 0.94.9
Some history:
Up until 0.94.8, Hbase did not check the result of recoverLease() call, but things kind of worked since we are checking for 0-length files in distributed log split tasks from region servers. If lease recovery is not finished, the log file will report 0 length, and the task will fail, and master will then re-call recoverLease() and reassign the task. This scheme might fail for log files that are larger than 1 hdfs block though.
In 0.94.8, we committed (HBASE-8354, which is backport of HBASE-7878) and later increased the sleep time to 4 secs in HBASE-8389.
However, the proper solution arrived in trunk in HBASE-8449 which uses a backoff sleep policy + isFileClosed() api. We should backport this patch to 0.94 as well.
isFileClosed() is released in Hadoop 1.2.0 (HDFS-4774) and 2.0.5(HDFS-4525).
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira