You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@ambari.apache.org by "Aleksandr Kovalenko (JIRA)" <ji...@apache.org> on 2016/02/17 14:40:18 UTC
[jira] [Commented] (AMBARI-15070) Graph scale behaviour is
incorrect if time range is switched before graph data API call is complete
[ https://issues.apache.org/jira/browse/AMBARI-15070?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15150507#comment-15150507 ]
Aleksandr Kovalenko commented on AMBARI-15070:
----------------------------------------------
+1 for patches
> Graph scale behaviour is incorrect if time range is switched before graph data API call is complete
> ---------------------------------------------------------------------------------------------------
>
> Key: AMBARI-15070
> URL: https://issues.apache.org/jira/browse/AMBARI-15070
> Project: Ambari
> Issue Type: Bug
> Components: ambari-web
> Affects Versions: 2.2.2
> Reporter: Antonenko Alexander
> Assignee: Antonenko Alexander
> Fix For: 2.2.2
>
> Attachments: AMBARI-15070_222.patch, AMBARI-15070_trunk.patch
>
>
> *STR*
> # Switch metrics time range from 'Last 1 hour' to 'Last 1 year' (for example, on Dashboard; data for 1 year should be available).
> # While metrics API call is pending, switch time range back to 1 hour (can be reproduced if connection rate is low or server is highly loaded so that requests are being processed slowly).
> *Result*
> After request with data for last year is complete, it's displayed on the graph, but the scale is rendered with an accuracy to 1 hour which makes graph unusable
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)