You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@pig.apache.org by "Olga Natkovich (JIRA)" <ji...@apache.org> on 2009/01/15 19:43:02 UTC

[jira] Assigned: (PIG-264) inconsistent return from Main

     [ https://issues.apache.org/jira/browse/PIG-264?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Olga Natkovich reassigned PIG-264:
----------------------------------

    Assignee: Santhosh Srinivasan

This will get addressed as part of error handling work

> inconsistent return from Main
> -----------------------------
>
>                 Key: PIG-264
>                 URL: https://issues.apache.org/jira/browse/PIG-264
>             Project: Pig
>          Issue Type: Bug
>            Reporter: Olga Natkovich
>            Assignee: Santhosh Srinivasan
>
> Main uses value of 0 or 1 in rc variable to indicate success or failure of the program. It does not seemed to be consistently set for both success and faulire situations. As the result, the return code is not very useful in determining whether the program succeeded or failed.
> Main.java needs to be examined and cleaned up to resolve this issue.

-- 
This message is automatically generated by JIRA.
-
You can reply to this email to add a comment to the issue online.