You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@geode.apache.org by "Nick Reich (JIRA)" <ji...@apache.org> on 2018/02/05 21:55:00 UTC
[jira] [Resolved] (GEODE-4442) Create message for cancelling an in
progress backup
[ https://issues.apache.org/jira/browse/GEODE-4442?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Nick Reich resolved GEODE-4442.
-------------------------------
Resolution: Fixed
Fix Version/s: 1.5.0
> Create message for cancelling an in progress backup
> ---------------------------------------------------
>
> Key: GEODE-4442
> URL: https://issues.apache.org/jira/browse/GEODE-4442
> Project: Geode
> Issue Type: Sub-task
> Components: persistence
> Reporter: Nick Reich
> Assignee: Nick Reich
> Priority: Major
> Labels: pull-request-available
> Fix For: 1.5.0
>
> Time Spent: 40m
> Remaining Estimate: 0h
>
> Currently, the final message involved in backups contains an abort flag that is the only way to cancel the backup. We should allow a way to try and halt an in progress backup by splitting out the abort logic from the existing message into a new message.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)