You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@kylin.apache.org by "Yaguang Jia (Jira)" <ji...@apache.org> on 2023/02/09 11:57:00 UTC
[jira] [Updated] (KYLIN-5437) After the build job is terminated, the total time spent on the job is still calculated
[ https://issues.apache.org/jira/browse/KYLIN-5437?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Yaguang Jia updated KYLIN-5437:
-------------------------------
Attachment: KYLIN-5437 After the build job is terminated, the total time spent on the job is still calculated.pdf
> After the build job is terminated, the total time spent on the job is still calculated
> --------------------------------------------------------------------------------------
>
> Key: KYLIN-5437
> URL: https://issues.apache.org/jira/browse/KYLIN-5437
> Project: Kylin
> Issue Type: Bug
> Components: Job Engine
> Affects Versions: 5.0-alpha
> Reporter: Yaguang Jia
> Assignee: Yaguang Jia
> Priority: Major
> Fix For: 5.0-alpha
>
> Attachments: KYLIN-5437 After the build job is terminated, the total time spent on the job is still calculated.pdf
>
>
> The total elapsed time is still being calculated when the build task terminates, causing confusion on the user side.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)