You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@gobblin.apache.org by "Urmi Mustafi (Jira)" <ji...@apache.org> on 2023/03/10 20:03:00 UTC

[jira] [Updated] (GOBBLIN-1799) Fix total add spec time and number of scheduled flows metric

     [ https://issues.apache.org/jira/browse/GOBBLIN-1799?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Urmi Mustafi updated GOBBLIN-1799:
----------------------------------
    Summary: Fix total add spec time and number of scheduled flows metric  (was: Fix calculation of total add spec time and number of scheduled flows metric)

> Fix total add spec time and number of scheduled flows metric
> ------------------------------------------------------------
>
>                 Key: GOBBLIN-1799
>                 URL: https://issues.apache.org/jira/browse/GOBBLIN-1799
>             Project: Apache Gobblin
>          Issue Type: Improvement
>            Reporter: Urmi Mustafi
>            Priority: Major
>
> The total add spec time and number of scheduled flows are being incremented even when we decided to skip flows far out into the future, overestimating these values by a large amount. 



--
This message was sent by Atlassian Jira
(v8.20.10#820010)