You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@gobblin.apache.org by "Urmi Mustafi (Jira)" <ji...@apache.org> on 2023/03/10 20:03:00 UTC
[jira] [Updated] (GOBBLIN-1799) Fix total add spec time and number of scheduled flows metric
[ https://issues.apache.org/jira/browse/GOBBLIN-1799?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Urmi Mustafi updated GOBBLIN-1799:
----------------------------------
Summary: Fix total add spec time and number of scheduled flows metric (was: Fix calculation of total add spec time and number of scheduled flows metric)
> Fix total add spec time and number of scheduled flows metric
> ------------------------------------------------------------
>
> Key: GOBBLIN-1799
> URL: https://issues.apache.org/jira/browse/GOBBLIN-1799
> Project: Apache Gobblin
> Issue Type: Improvement
> Reporter: Urmi Mustafi
> Priority: Major
>
> The total add spec time and number of scheduled flows are being incremented even when we decided to skip flows far out into the future, overestimating these values by a large amount.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)