You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@geode.apache.org by "Jens Deppe (JIRA)" <ji...@apache.org> on 2018/03/15 15:36:00 UTC
[jira] [Assigned] (GEODE-4803) CI: ConcurrentDeployDUnitTest needs
tuning
[ https://issues.apache.org/jira/browse/GEODE-4803?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Jens Deppe reassigned GEODE-4803:
---------------------------------
Assignee: Jens Deppe
> CI: ConcurrentDeployDUnitTest needs tuning
> ------------------------------------------
>
> Key: GEODE-4803
> URL: https://issues.apache.org/jira/browse/GEODE-4803
> Project: Geode
> Issue Type: Bug
> Components: gfsh
> Affects Versions: 1.5.0
> Reporter: Kenneth Howe
> Assignee: Jens Deppe
> Priority: Major
> Labels: ci
>
> The test concurrently runs iterations of gfsh commands to deploy and undeploy .jar's from 3 gfsh clients to the same server, then waits up to 5 minutes for the gfsh clients to finish. Sometimes in the CI pipelines one or more of the clients don't complete their iterations within the 5 minute wait.
> Test timing and/or client iterations needs to be adjusted for variations in machine and network speed.
> Also see GEODE-800.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)