You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@oozie.apache.org by "Anoop S Nair (JIRA)" <ji...@apache.org> on 2017/05/05 06:32:04 UTC
[jira] [Updated] (OOZIE-2881) We should be having a feature to
rerun a Oozie job from a successful step
[ https://issues.apache.org/jira/browse/OOZIE-2881?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Anoop S Nair updated OOZIE-2881:
--------------------------------
Summary: We should be having a feature to rerun a Oozie job from a successful step (was: We shoul be having a feature to rerun a Oozie job from a successful step)
> We should be having a feature to rerun a Oozie job from a successful step
> -------------------------------------------------------------------------
>
> Key: OOZIE-2881
> URL: https://issues.apache.org/jira/browse/OOZIE-2881
> Project: Oozie
> Issue Type: New Feature
> Components: core
> Reporter: Anoop S Nair
> Priority: Minor
>
> we currently have two methods to rerun a Oozie workflow job
> one using failed node and another using skip nodes , but the real issue arises when we are unable to run a job with skip node once we have used failed node in past execution.
> It becomes very hectic when we trigger a workflow with huge count of steps.It would we very helpful if we can have a method to re trigger a job from a successful node .
--
This message was sent by Atlassian JIRA
(v6.3.15#6346)