You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "ASF GitHub Bot (Jira)" <ji...@apache.org> on 2023/03/10 14:58:00 UTC
[jira] [Updated] (FLINK-30129) Push projection through ChangelogNormalize
[ https://issues.apache.org/jira/browse/FLINK-30129?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
ASF GitHub Bot updated FLINK-30129:
-----------------------------------
Labels: pull-request-available (was: )
> Push projection through ChangelogNormalize
> ------------------------------------------
>
> Key: FLINK-30129
> URL: https://issues.apache.org/jira/browse/FLINK-30129
> Project: Flink
> Issue Type: New Feature
> Components: Table SQL / Planner
> Reporter: Jark Wu
> Assignee: Jark Wu
> Priority: Major
> Labels: pull-request-available
> Fix For: 1.18.0
>
>
> Currently, the ChangelogNormalize node is generated during the physical optimization phase. That means the projection is not pushed through ChangelogNormalize if the {{TableSource}} doesn't support {{SupportsProjectionPushDown}}. We can implement such optimization to reduce the state size (fewer columns in state value) and better throughput (only changes on the selected columns will be emitted).
--
This message was sent by Atlassian Jira
(v8.20.10#820010)