You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Rui Fan (Jira)" <ji...@apache.org> on 2023/09/15 07:26:00 UTC
[jira] [Commented] (FLINK-33092) Improve the resource-stabilization-timeout mechanism when rescale a job for Adaptive Scheduler
[ https://issues.apache.org/jira/browse/FLINK-33092?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17765483#comment-17765483 ]
Rui Fan commented on FLINK-33092:
---------------------------------
Hi [~chesnay] [~dmvk] , would you mind helping take a look this improvement? I can go ahead if you think it makes sense.
> Improve the resource-stabilization-timeout mechanism when rescale a job for Adaptive Scheduler
> ----------------------------------------------------------------------------------------------
>
> Key: FLINK-33092
> URL: https://issues.apache.org/jira/browse/FLINK-33092
> Project: Flink
> Issue Type: Improvement
> Components: Runtime / Coordination
> Reporter: Rui Fan
> Assignee: Rui Fan
> Priority: Major
> Attachments: image-2023-09-15-14-43-35-104.png
>
>
> !image-2023-09-15-14-43-35-104.png|width=916,height=647!
> h1. 1. Propose
> The above is the state transition graph when rescale a job in Adaptive Scheduler.
> In brief, when we trigger a rescale, the job will wait _*resource-stabilization-timeout*_ in WaitingForResources State when it has sufficient resources and it doesn't have the desired resource.
> If the _*resource-stabilization-timeout mechanism*_ is moved into the Executing State, the rescale downtime will be significantly reduced.
> h1. 2. Why the downtime is long?
> Currently, when rescale a job:
> * The Executing will transition to Restarting
> * The Restarting will cancel this job first.
> * The Restarting will transition to WaitingForResources after the whole job is terminal.
> * When this job has sufficient resources and it doesn't have the desired resource, the WaitingForResources needs to wait _*resource-stabilization-timeout*_ .
> * WaitingForResources will transition to CreatingExecutionGraph after resource-stabilization-timeout.
> The problem is the job isn't running during the resource-stabilization-timeout phase.
> h1. 3. How to reduce the downtime?
> We can move the _*resource-stabilization-timeout mechanism*_ into the Executing State when trigger a rescale. It means:
> * When this job has desired resources, the Executing can rescale directly.
> * When this job has sufficient resources and it doesn't have the desired resource, we can rescale after _*resource-stabilization-timeout.*_
> * The WaitingForResources will ignore the resource-stabilization-timeout after this improvement.
> The resource-stabilization-timeout works before cancel job, so the rescale downtime will be significantly reduced.
>
> Note: the resource-stabilization-timeout still works in WaitingForResources when start a job. It's just changed when rescale a job.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)