You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@ozone.apache.org by "Siyao Meng (Jira)" <ji...@apache.org> on 2026/10/06 06:46:00 UTC
[jira] [Assigned] (HDDS-16729) Add end-to-end regression coverage for snapshot diff cancellation and resubmission
[ https://issues.apache.org/jira/browse/HDDS-16729?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Siyao Meng reassigned HDDS-16729:
---------------------------------
Assignee: (was: Siyao Meng)
> Add end-to-end regression coverage for snapshot diff cancellation and resubmission
> ----------------------------------------------------------------------------------
>
> Key: HDDS-16729
> URL: https://issues.apache.org/jira/browse/HDDS-16729
> Project: Apache Ozone
> Issue Type: Test
> Reporter: Siyao Meng
> Priority: Major
>
> Follow-up to HDDS-16441: https://github.com/apache/ozone/pull/11321#discussion_r4111708010
> HDDS-16441 prevents a cancelled snapshot diff task from marking a resubmitted job DONE with the old task's report metadata. The current regression test inserts the job-table entry directly and calls updateJobStatusToDone, so it does not cover cancellation, resubmission, report generation, or report retrieval together.
> Add a deterministic regression test to the existing snapshot integration suite:
> # Create two snapshots with a non-empty expected diff.
> # Submit diff A and pause it after report generation, before publishing completion.
> # Cancel A through the client API.
> # Call submitSnapshotDiff again for the same snapshot pair, creating B with a different jobId. Keep B paused before report generation.
> # Release A and verify B remains IN_PROGRESS with its completion metadata unchanged.
> # Release B, wait for completion, and retrieve all report pages. Verify the expected entries and successful report integrity checks.
> Use bounded synchronization to control the interleaving, without manually creating or replacing job-table entries. Any timing hook must allow cancellation and resubmission to proceed without holding the SnapshotDiffManager monitor.
> The test must fail when the jobId completion guard introduced by HDDS-16441 is removed, and pass with the fix. Reuse the existing cluster lifecycle and test helpers.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)
---------------------------------------------------------------------
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For additional commands, e-mail: issues-help@ozone.apache.org