You are viewing a plain text version of this content. The canonical link for it is here.
Posted to commits@maven.apache.org by hb...@apache.org on 2020/05/20 17:44:17 UTC

[maven-site] branch master updated: order of paragraphs: the plan is key

This is an automated email from the ASF dual-hosted git repository.

hboutemy pushed a commit to branch master
in repository https://gitbox.apache.org/repos/asf/maven-site.git


The following commit(s) were added to refs/heads/master by this push:
     new ae60cf9  order of paragraphs: the plan is key
ae60cf9 is described below

commit ae60cf9c716b6cfc63fcfce1bb1b85fb15ef8b30
Author: Hervé Boutemy <hb...@apache.org>
AuthorDate: Wed May 20 19:40:48 2020 +0200

    order of paragraphs: the plan is key
---
 content/apt/developers/compatibility-plan.apt | 26 +++++++++++++-------------
 1 file changed, 13 insertions(+), 13 deletions(-)

diff --git a/content/apt/developers/compatibility-plan.apt b/content/apt/developers/compatibility-plan.apt
index aa10be5..b370a31 100644
--- a/content/apt/developers/compatibility-plan.apt
+++ b/content/apt/developers/compatibility-plan.apt
@@ -42,7 +42,15 @@ Maven Compatibility Plan
 
   Current minimum runtime prerequisites for latest plugins release is visible in a {{{https://builds.apache.org/view/M-R/view/Maven/job/dist-tool-plugin/site/dist-tool-prerequisites.html}daily generated report}}.
 
-* Facts
+* Maven Plan
+
+  * Until ..., Maven 2.2.1 + Java 5 prerequisites, with plugins versions in 2.x
+
+  * Since ..., Maven 3.0 + Java 7 prerequisites, with plugins in 3.x
+
+  * Since ..., discussions on Maven 3.2.5? + Java 8 prerequisites
+
+* Context
 
   * Maven core Java requirement history is visible in the {{{/docs/history.html}release notes}}
 
@@ -50,22 +58,14 @@ Maven Compatibility Plan
 
     * Java 5 is closed source, EOLed by binary providers on ...
 
-    * Java 6 is Open Source, EOLed by OpenJDK maintainers on ... 
+    * Java 6 is Open Source, maintained at OpenJDK until ... 
 
-    * Java 7 is Open Source, OpenJDK maintained at least until June 2020 
+    * Java 7 is Open Source, maintained at OpenJDK at least until June 2020 
 
-    * Java 8 is Open Source, OpenJDK maintained at least until September 2023
+    * Java 8 is Open Source, maintained at OpenJDK at least until September 2023
 
-    * see {{{https://docs.google.com/document/d/1nFGazvrCvHMZJgFstlbzoHjpAVwv5DEdnaBr_5pKuHo}Java Is Still Free 2.0.4}}
+    * see {{{https://docs.google.com/document/d/1nFGazvrCvHMZJgFstlbzoHjpAVwv5DEdnaBr_5pKuHo}Java Is Still Free}}
     
     []
 
   []
-
-* Maven Plan
-
-  * Until ..., Maven 2.2.1 + Java 5 prerequisites, with plugins versions in 2.x
-
-  * Since ..., Maven 3.0 + Java 7 prerequisites, with plugins in 3.x
-
-  * Since ..., discussions on Maven 3.2.5? + Java 8 prerequisites