You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@tamaya.apache.org by "Anatole Tresch (Jira)" <ji...@apache.org> on 2019/08/25 12:21:00 UTC
[jira] [Assigned] (TAMAYA-245) Prepare 0.4-incubating release
[ https://issues.apache.org/jira/browse/TAMAYA-245?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Anatole Tresch reassigned TAMAYA-245:
-------------------------------------
Assignee: Anatole Tresch
Summary: Prepare 0.4-incubating release (was: Prepare 0.3-incubating release)
> Prepare 0.4-incubating release
> ------------------------------
>
> Key: TAMAYA-245
> URL: https://issues.apache.org/jira/browse/TAMAYA-245
> Project: Tamaya
> Issue Type: Task
> Components: Infrastructure
> Affects Versions: 0.3-incubating
> Reporter: Philipp Ottlinger
> Assignee: Anatole Tresch
> Priority: Major
>
> Please add any tasks as subtask that needs to be done before releasing 0.3 ... this means
> * functional
> * technical
> * formal
> * documentation stuff.
--
This message was sent by Atlassian Jira
(v8.3.2#803003)