You are viewing a plain text version of this content. The canonical link for it is here.
Posted to yarn-issues@hadoop.apache.org by "Siddharth Seth (JIRA)" <ji...@apache.org> on 2013/02/26 20:48:13 UTC
[jira] [Created] (YARN-429) capacity-scheduler config missing from
yarn-test artifact
Siddharth Seth created YARN-429:
-----------------------------------
Summary: capacity-scheduler config missing from yarn-test artifact
Key: YARN-429
URL: https://issues.apache.org/jira/browse/YARN-429
Project: Hadoop YARN
Issue Type: Bug
Components: resourcemanager
Affects Versions: 2.0.3-alpha
Reporter: Siddharth Seth
Assignee: Siddharth Seth
Priority: Blocker
MiniYARNCluster and MiniMRCluster are unusable by downstream projects with the 2.0.3-alpha release, since the capacity-scheduler configuration is missing from the test artifact.
hadoop-yarn-server-tests-3.0.0-SNAPSHOT-tests.jar should include the default capacity-scheduler configuration. Also, this doesn't need to be part of the default classpath - and should be moved out of the top level directory in the dist package.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira