You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@directory.apache.org by "Stefan Seelmann (JIRA)" <ji...@apache.org> on 2015/05/01 14:01:06 UTC
[jira] [Commented] (DIRSTUDIO-1014) Cannot remove the 'finished
operations' in the Progress pan
[ https://issues.apache.org/jira/browse/DIRSTUDIO-1014?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14523114#comment-14523114 ]
Stefan Seelmann commented on DIRSTUDIO-1014:
--------------------------------------------
I was able to reproduce this: When opening a connection fails because the server is not running the "Open Connection" job remains in the "Progess" view and it is not removeable.
> Cannot remove the 'finished operations' in the Progress pan
> -----------------------------------------------------------
>
> Key: DIRSTUDIO-1014
> URL: https://issues.apache.org/jira/browse/DIRSTUDIO-1014
> Project: Directory Studio
> Issue Type: Bug
> Affects Versions: 2.0.0-M8 (2.0.0.v20130628)
> Reporter: Emmanuel Lecharny
> Fix For: 2.0.0-M9
>
>
> The 'progress' pane list the ongoing operations as the finished operations (should be 'completed'). There is a drop down menu that allows you to remove the completed operations, but it's not doing anything.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)