You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@falcon.apache.org by "Samarth Gupta (JIRA)" <ji...@apache.org> on 2014/03/13 07:03:43 UTC
[jira] [Created] (FALCON-353) enable dry run feature of oozie for
schedule and update
Samarth Gupta created FALCON-353:
------------------------------------
Summary: enable dry run feature of oozie for schedule and update
Key: FALCON-353
URL: https://issues.apache.org/jira/browse/FALCON-353
Project: Falcon
Issue Type: Improvement
Reporter: Samarth Gupta
Assignee: Shwetha G S
dry run feature of oozie enables one to test there coord before hand and verify that it conforms with the oozie syntactic and job dosent get killed on being scheduled. details here https://oozie.apache.org/docs/3.1.3-incubating/DG_CommandLineTool.html#Dryrun_of_Coordinator_Job
we are planning to implement this via schedule and update operations in falcon
--
This message was sent by Atlassian JIRA
(v6.2#6252)