Posted to dev@beam.apache.org by Robert Burke <lo...@apache.org> on 2023/07/26 15:49:37 UTC

[PROPOSAL] Preparing for 2.50.0 Release

Hey Beam community,

The next release (2.50.0) branch cut is scheduled on August 9th, 2023,
according to
the release calendar [1].

I volunteer to perform this release. My plan is to cut the branch on that
date, and cherrypick release-blocking fixes afterwards, if any.

Please help me make sure the release goes smoothly by:
- Making sure that any unresolved release blocking issues for 2.50.0 should
have their "Milestone" marked as "2.50.0 Release" as soon as possible.
- Reviewing the current release blockers [2] and remove the Milestone if
they don't meet the criteria at [3].

Let me know if you have any comments/objections/questions.

Thanks,

Robert Burke (he/him)
Beam Go Busybody

[1]
https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com
[2] https://github.com/apache/beam/milestone/14
[3] https://beam.apache.org/contribute/release-blocking/

Re: [PROPOSAL] Preparing for 2.50.0 Release

Posted by Robert Burke <lo...@apache.org>.
RC1 is sufficiently ready for testing and validation. Please vote and discuss at that thread.

https://lists.apache.org/thread/xgx49zshms7253lfx6d6lsnvwf7tyyfp

Robert Burke
2.50.0 Release Manager

On 2023/08/17 02:30:00 Robert Burke wrote:
> Despite my best efforts, python continues to vex me.  RC1 is almost ready,
> just missing the beam site and doc updates PR, and (optionally) the
> typescript container.
> 
> So I'm calling it a night, and will build and send out a partial docs PR in
> the morning.
> Robert Burke
> 2.50.0 Release Manager
> 
> On Wed, Aug 16, 2023, 8:08 AM Robert Burke <lo...@apache.org> wrote:
> 
> > Just a status update: Branch is cut and tagged
> >
> > https://github.com/apache/beam/tree/release-2.50.0
> > https://github.com/apache/beam/tree/v2.50.0-RC1
> >
> > I'm working on the remaining bits to have an RC. The github
> > build-release-artifacts action failed to
> > build and publish the Java Artifacts and stage the Docker containers.
> >
> > The former says:
> >
> > Execution failed for task ':sdks:java:io:solr:compileTestJava'.
> > GC overhead limit exceeded
> >
> > The latter is due to a partial application of the Multi-Arch build to the
> > github actions, that has already been fixed.
> >
> > The Dataflow Legacy Java worker and associated containers have been built
> > and published, and we apologize for the delay this caused. We're discussing
> > how we presently interleave Google internal processes with the release, and
> > how we can streamline things now that Dataflow is transitioning to RunnerV2
> > by default. In future releases, we may build the non-portable Dataflow Java
> > workers after the first RC is tagged and the open side is on its way.
> >
> > The hope is RC1 will be available tonight. Either way, this thread will be
> > updated with the status.
> >
> > Robert Burke
> > Beam 2.50.0 Release Manager
> >
> > On 2023/08/14 21:51:47 Robert Burke wrote:
> > > +1 to what XQ says.
> > >
> > > There will be a voting email thread once I've done the appropriate due
> > > diligence to the branch, and finish with the Dataflow artifacts.
> > >
> > > Generally speaking, the best validation is something you're using
> > already,
> > > to make sure that the new version of Beam works for your usage.
> > >
> > >
> > > On Mon, Aug 14, 2023, 2:41 PM XQ Hu via dev <de...@beam.apache.org> wrote:
> > >
> > > > Welcome to the Beam community! Our release managers usually follow this
> > > >
> > https://beam.apache.org/contribute/release-guide/#10-vote-and-validate-release-candidate
> > > > to send the votes out and ask for any feedback regarding the release
> > > > candidate. If you could help run any validation on your side and cast
> > your
> > > > vote, it would be greatly appreciated and helpful for the community.
> > > >
> > > > On Mon, Aug 14, 2023 at 12:23 PM Hong <ho...@apache.org> wrote:
> > > >
> > > >> I see, thanks for clarifying, Robert!
> > > >>
> > > >> Is there anything I can help with validation? Is there a wiki page
> > with
> > > >> the expected validations I can help with?
> > > >>
> > > >> Best
> > > >> Hong
> > > >>
> > > >> On 14 Aug 2023, at 14:34, Robert Burke <ro...@frantil.com> wrote:
> > > >>
> > > >> 
> > > >> The release branch was cut. Before yhe weekend, I was working on
> > getting
> > > >> the non-portable Dataflow Java worker built and available before
> > producing
> > > >> the RC1. The actual building bit doesn't take that long, but there's a
> > > >> bunch of additional validation that goes along with it.
> > > >>
> > > >> The current target date for 2.50.0 is September 13th, but ultimately
> > it's
> > > >> as soon as we have a validated and voted on RC.
> > > >>
> > > >> On Mon, Aug 14, 2023, 3:43 AM Hong Liang <hl...@gmail.com> wrote:
> > > >>
> > > >>> Thanks for driving this Robert!
> > > >>>
> > > >>> It seems the two PRs specified have been merged. A little new to
> > Beam,
> > > >>> do we have an expected release date for the 2.50 release?
> > > >>>
> > > >>> Best,
> > > >>> Hong
> > > >>>
> > > >>> On Thu, Aug 10, 2023 at 3:08 AM Robert Burke <lo...@apache.org>
> > > >>> wrote:
> > > >>>
> > > >>>> I'm in the process of producing the Cut branch, but due to various
> > > >>>> delays on my part, it will not be cut today.
> > > >>>>
> > > >>>> There are two outstanding PRs blocking the cut,
> > > >>>> https://github.com/apache/beam/pull/27947 and
> > > >>>> https://github.com/apache/beam/pull/27939, but once those are in,
> > I'll
> > > >>>> proceed. Remaining new issues will be cherry picked as required.
> > > >>>>
> > > >>>> Thanks
> > > >>>> Robert Burke
> > > >>>> Beam 2.50.0 Release Manager
> > > >>>>
> > > >>>> On 2023/07/26 15:49:37 Robert Burke wrote:
> > > >>>> > Hey Beam community,
> > > >>>> >
> > > >>>> > The next release (2.50.0) branch cut is scheduled on August 9th,
> > 2023,
> > > >>>> > according to
> > > >>>> > the release calendar [1].
> > > >>>> >
> > > >>>> > I volunteer to perform this release. My plan is to cut the branch
> > on
> > > >>>> that
> > > >>>> > date, and cherrypick release-blocking fixes afterwards, if any.
> > > >>>> >
> > > >>>> > Please help me make sure the release goes smoothly by:
> > > >>>> > - Making sure that any unresolved release blocking issues for
> > 2.50.0
> > > >>>> should
> > > >>>> > have their "Milestone" marked as "2.50.0 Release" as soon as
> > possible.
> > > >>>> > - Reviewing the current release blockers [2] and remove the
> > Milestone
> > > >>>> if
> > > >>>> > they don't meet the criteria at [3].
> > > >>>> >
> > > >>>> > Let me know if you have any comments/objections/questions.
> > > >>>> >
> > > >>>> > Thanks,
> > > >>>> >
> > > >>>> > Robert Burke (he/him)
> > > >>>> > Beam Go Busybody
> > > >>>> >
> > > >>>> > [1]
> > > >>>> >
> > > >>>>
> > https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com
> > > >>>> > [2] https://github.com/apache/beam/milestone/14
> > > >>>> > [3] https://beam.apache.org/contribute/release-blocking/
> > > >>>> >
> > > >>>>
> > > >>>
> > >
> >
> 

Re: [PROPOSAL] Preparing for 2.50.0 Release

Posted by Robert Burke <ro...@frantil.com>.
Despite my best efforts, python continues to vex me.  RC1 is almost ready,
just missing the beam site and doc updates PR, and (optionally) the
typescript container.

So I'm calling it a night, and will build and send out a partial docs PR in
the morning.
Robert Burke
2.50.0 Release Manager

On Wed, Aug 16, 2023, 8:08 AM Robert Burke <lo...@apache.org> wrote:

> Just a status update: Branch is cut and tagged
>
> https://github.com/apache/beam/tree/release-2.50.0
> https://github.com/apache/beam/tree/v2.50.0-RC1
>
> I'm working on the remaining bits to have an RC. The github
> build-release-artifacts action failed to
> build and publish the Java Artifacts and stage the Docker containers.
>
> The former says:
>
> Execution failed for task ':sdks:java:io:solr:compileTestJava'.
> GC overhead limit exceeded
>
> The latter is due to a partial application of the Multi-Arch build to the
> github actions, that has already been fixed.
>
> The Dataflow Legacy Java worker and associated containers have been built
> and published, and we apologize for the delay this caused. We're discussing
> how we presently interleave Google internal processes with the release, and
> how we can streamline things now that Dataflow is transitioning to RunnerV2
> by default. In future releases, we may build the non-portable Dataflow Java
> workers after the first RC is tagged and the open side is on its way.
>
> The hope is RC1 will be available tonight. Either way, this thread will be
> updated with the status.
>
> Robert Burke
> Beam 2.50.0 Release Manager
>
> On 2023/08/14 21:51:47 Robert Burke wrote:
> > +1 to what XQ says.
> >
> > There will be a voting email thread once I've done the appropriate due
> > diligence to the branch, and finish with the Dataflow artifacts.
> >
> > Generally speaking, the best validation is something you're using
> already,
> > to make sure that the new version of Beam works for your usage.
> >
> >
> > On Mon, Aug 14, 2023, 2:41 PM XQ Hu via dev <de...@beam.apache.org> wrote:
> >
> > > Welcome to the Beam community! Our release managers usually follow this
> > >
> https://beam.apache.org/contribute/release-guide/#10-vote-and-validate-release-candidate
> > > to send the votes out and ask for any feedback regarding the release
> > > candidate. If you could help run any validation on your side and cast
> your
> > > vote, it would be greatly appreciated and helpful for the community.
> > >
> > > On Mon, Aug 14, 2023 at 12:23 PM Hong <ho...@apache.org> wrote:
> > >
> > >> I see, thanks for clarifying, Robert!
> > >>
> > >> Is there anything I can help with validation? Is there a wiki page
> with
> > >> the expected validations I can help with?
> > >>
> > >> Best
> > >> Hong
> > >>
> > >> On 14 Aug 2023, at 14:34, Robert Burke <ro...@frantil.com> wrote:
> > >>
> > >> 
> > >> The release branch was cut. Before yhe weekend, I was working on
> getting
> > >> the non-portable Dataflow Java worker built and available before
> producing
> > >> the RC1. The actual building bit doesn't take that long, but there's a
> > >> bunch of additional validation that goes along with it.
> > >>
> > >> The current target date for 2.50.0 is September 13th, but ultimately
> it's
> > >> as soon as we have a validated and voted on RC.
> > >>
> > >> On Mon, Aug 14, 2023, 3:43 AM Hong Liang <hl...@gmail.com> wrote:
> > >>
> > >>> Thanks for driving this Robert!
> > >>>
> > >>> It seems the two PRs specified have been merged. A little new to
> Beam,
> > >>> do we have an expected release date for the 2.50 release?
> > >>>
> > >>> Best,
> > >>> Hong
> > >>>
> > >>> On Thu, Aug 10, 2023 at 3:08 AM Robert Burke <lo...@apache.org>
> > >>> wrote:
> > >>>
> > >>>> I'm in the process of producing the Cut branch, but due to various
> > >>>> delays on my part, it will not be cut today.
> > >>>>
> > >>>> There are two outstanding PRs blocking the cut,
> > >>>> https://github.com/apache/beam/pull/27947 and
> > >>>> https://github.com/apache/beam/pull/27939, but once those are in,
> I'll
> > >>>> proceed. Remaining new issues will be cherry picked as required.
> > >>>>
> > >>>> Thanks
> > >>>> Robert Burke
> > >>>> Beam 2.50.0 Release Manager
> > >>>>
> > >>>> On 2023/07/26 15:49:37 Robert Burke wrote:
> > >>>> > Hey Beam community,
> > >>>> >
> > >>>> > The next release (2.50.0) branch cut is scheduled on August 9th,
> 2023,
> > >>>> > according to
> > >>>> > the release calendar [1].
> > >>>> >
> > >>>> > I volunteer to perform this release. My plan is to cut the branch
> on
> > >>>> that
> > >>>> > date, and cherrypick release-blocking fixes afterwards, if any.
> > >>>> >
> > >>>> > Please help me make sure the release goes smoothly by:
> > >>>> > - Making sure that any unresolved release blocking issues for
> 2.50.0
> > >>>> should
> > >>>> > have their "Milestone" marked as "2.50.0 Release" as soon as
> possible.
> > >>>> > - Reviewing the current release blockers [2] and remove the
> Milestone
> > >>>> if
> > >>>> > they don't meet the criteria at [3].
> > >>>> >
> > >>>> > Let me know if you have any comments/objections/questions.
> > >>>> >
> > >>>> > Thanks,
> > >>>> >
> > >>>> > Robert Burke (he/him)
> > >>>> > Beam Go Busybody
> > >>>> >
> > >>>> > [1]
> > >>>> >
> > >>>>
> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com
> > >>>> > [2] https://github.com/apache/beam/milestone/14
> > >>>> > [3] https://beam.apache.org/contribute/release-blocking/
> > >>>> >
> > >>>>
> > >>>
> >
>

Re: [PROPOSAL] Preparing for 2.50.0 Release

Posted by Robert Burke <lo...@apache.org>.
Just a status update: Branch is cut and tagged

https://github.com/apache/beam/tree/release-2.50.0
https://github.com/apache/beam/tree/v2.50.0-RC1

I'm working on the remaining bits to have an RC. The github build-release-artifacts action failed to 
build and publish the Java Artifacts and stage the Docker containers. 

The former says:

Execution failed for task ':sdks:java:io:solr:compileTestJava'.
GC overhead limit exceeded

The latter is due to a partial application of the Multi-Arch build to the github actions, that has already been fixed.

The Dataflow Legacy Java worker and associated containers have been built and published, and we apologize for the delay this caused. We're discussing how we presently interleave Google internal processes with the release, and how we can streamline things now that Dataflow is transitioning to RunnerV2 by default. In future releases, we may build the non-portable Dataflow Java workers after the first RC is tagged and the open side is on its way. 

The hope is RC1 will be available tonight. Either way, this thread will be updated with the status.

Robert Burke
Beam 2.50.0 Release Manager

On 2023/08/14 21:51:47 Robert Burke wrote:
> +1 to what XQ says.
> 
> There will be a voting email thread once I've done the appropriate due
> diligence to the branch, and finish with the Dataflow artifacts.
> 
> Generally speaking, the best validation is something you're using already,
> to make sure that the new version of Beam works for your usage.
> 
> 
> On Mon, Aug 14, 2023, 2:41 PM XQ Hu via dev <de...@beam.apache.org> wrote:
> 
> > Welcome to the Beam community! Our release managers usually follow this
> > https://beam.apache.org/contribute/release-guide/#10-vote-and-validate-release-candidate
> > to send the votes out and ask for any feedback regarding the release
> > candidate. If you could help run any validation on your side and cast your
> > vote, it would be greatly appreciated and helpful for the community.
> >
> > On Mon, Aug 14, 2023 at 12:23 PM Hong <ho...@apache.org> wrote:
> >
> >> I see, thanks for clarifying, Robert!
> >>
> >> Is there anything I can help with validation? Is there a wiki page with
> >> the expected validations I can help with?
> >>
> >> Best
> >> Hong
> >>
> >> On 14 Aug 2023, at 14:34, Robert Burke <ro...@frantil.com> wrote:
> >>
> >> 
> >> The release branch was cut. Before yhe weekend, I was working on getting
> >> the non-portable Dataflow Java worker built and available before producing
> >> the RC1. The actual building bit doesn't take that long, but there's a
> >> bunch of additional validation that goes along with it.
> >>
> >> The current target date for 2.50.0 is September 13th, but ultimately it's
> >> as soon as we have a validated and voted on RC.
> >>
> >> On Mon, Aug 14, 2023, 3:43 AM Hong Liang <hl...@gmail.com> wrote:
> >>
> >>> Thanks for driving this Robert!
> >>>
> >>> It seems the two PRs specified have been merged. A little new to Beam,
> >>> do we have an expected release date for the 2.50 release?
> >>>
> >>> Best,
> >>> Hong
> >>>
> >>> On Thu, Aug 10, 2023 at 3:08 AM Robert Burke <lo...@apache.org>
> >>> wrote:
> >>>
> >>>> I'm in the process of producing the Cut branch, but due to various
> >>>> delays on my part, it will not be cut today.
> >>>>
> >>>> There are two outstanding PRs blocking the cut,
> >>>> https://github.com/apache/beam/pull/27947 and
> >>>> https://github.com/apache/beam/pull/27939, but once those are in, I'll
> >>>> proceed. Remaining new issues will be cherry picked as required.
> >>>>
> >>>> Thanks
> >>>> Robert Burke
> >>>> Beam 2.50.0 Release Manager
> >>>>
> >>>> On 2023/07/26 15:49:37 Robert Burke wrote:
> >>>> > Hey Beam community,
> >>>> >
> >>>> > The next release (2.50.0) branch cut is scheduled on August 9th, 2023,
> >>>> > according to
> >>>> > the release calendar [1].
> >>>> >
> >>>> > I volunteer to perform this release. My plan is to cut the branch on
> >>>> that
> >>>> > date, and cherrypick release-blocking fixes afterwards, if any.
> >>>> >
> >>>> > Please help me make sure the release goes smoothly by:
> >>>> > - Making sure that any unresolved release blocking issues for 2.50.0
> >>>> should
> >>>> > have their "Milestone" marked as "2.50.0 Release" as soon as possible.
> >>>> > - Reviewing the current release blockers [2] and remove the Milestone
> >>>> if
> >>>> > they don't meet the criteria at [3].
> >>>> >
> >>>> > Let me know if you have any comments/objections/questions.
> >>>> >
> >>>> > Thanks,
> >>>> >
> >>>> > Robert Burke (he/him)
> >>>> > Beam Go Busybody
> >>>> >
> >>>> > [1]
> >>>> >
> >>>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com
> >>>> > [2] https://github.com/apache/beam/milestone/14
> >>>> > [3] https://beam.apache.org/contribute/release-blocking/
> >>>> >
> >>>>
> >>>
> 

Re: [PROPOSAL] Preparing for 2.50.0 Release

Posted by Robert Burke <ro...@frantil.com>.
+1 to what XQ says.

There will be a voting email thread once I've done the appropriate due
diligence to the branch, and finish with the Dataflow artifacts.

Generally speaking, the best validation is something you're using already,
to make sure that the new version of Beam works for your usage.


On Mon, Aug 14, 2023, 2:41 PM XQ Hu via dev <de...@beam.apache.org> wrote:

> Welcome to the Beam community! Our release managers usually follow this
> https://beam.apache.org/contribute/release-guide/#10-vote-and-validate-release-candidate
> to send the votes out and ask for any feedback regarding the release
> candidate. If you could help run any validation on your side and cast your
> vote, it would be greatly appreciated and helpful for the community.
>
> On Mon, Aug 14, 2023 at 12:23 PM Hong <ho...@apache.org> wrote:
>
>> I see, thanks for clarifying, Robert!
>>
>> Is there anything I can help with validation? Is there a wiki page with
>> the expected validations I can help with?
>>
>> Best
>> Hong
>>
>> On 14 Aug 2023, at 14:34, Robert Burke <ro...@frantil.com> wrote:
>>
>> 
>> The release branch was cut. Before yhe weekend, I was working on getting
>> the non-portable Dataflow Java worker built and available before producing
>> the RC1. The actual building bit doesn't take that long, but there's a
>> bunch of additional validation that goes along with it.
>>
>> The current target date for 2.50.0 is September 13th, but ultimately it's
>> as soon as we have a validated and voted on RC.
>>
>> On Mon, Aug 14, 2023, 3:43 AM Hong Liang <hl...@gmail.com> wrote:
>>
>>> Thanks for driving this Robert!
>>>
>>> It seems the two PRs specified have been merged. A little new to Beam,
>>> do we have an expected release date for the 2.50 release?
>>>
>>> Best,
>>> Hong
>>>
>>> On Thu, Aug 10, 2023 at 3:08 AM Robert Burke <lo...@apache.org>
>>> wrote:
>>>
>>>> I'm in the process of producing the Cut branch, but due to various
>>>> delays on my part, it will not be cut today.
>>>>
>>>> There are two outstanding PRs blocking the cut,
>>>> https://github.com/apache/beam/pull/27947 and
>>>> https://github.com/apache/beam/pull/27939, but once those are in, I'll
>>>> proceed. Remaining new issues will be cherry picked as required.
>>>>
>>>> Thanks
>>>> Robert Burke
>>>> Beam 2.50.0 Release Manager
>>>>
>>>> On 2023/07/26 15:49:37 Robert Burke wrote:
>>>> > Hey Beam community,
>>>> >
>>>> > The next release (2.50.0) branch cut is scheduled on August 9th, 2023,
>>>> > according to
>>>> > the release calendar [1].
>>>> >
>>>> > I volunteer to perform this release. My plan is to cut the branch on
>>>> that
>>>> > date, and cherrypick release-blocking fixes afterwards, if any.
>>>> >
>>>> > Please help me make sure the release goes smoothly by:
>>>> > - Making sure that any unresolved release blocking issues for 2.50.0
>>>> should
>>>> > have their "Milestone" marked as "2.50.0 Release" as soon as possible.
>>>> > - Reviewing the current release blockers [2] and remove the Milestone
>>>> if
>>>> > they don't meet the criteria at [3].
>>>> >
>>>> > Let me know if you have any comments/objections/questions.
>>>> >
>>>> > Thanks,
>>>> >
>>>> > Robert Burke (he/him)
>>>> > Beam Go Busybody
>>>> >
>>>> > [1]
>>>> >
>>>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com
>>>> > [2] https://github.com/apache/beam/milestone/14
>>>> > [3] https://beam.apache.org/contribute/release-blocking/
>>>> >
>>>>
>>>

Re: [PROPOSAL] Preparing for 2.50.0 Release

Posted by XQ Hu via dev <de...@beam.apache.org>.
Welcome to the Beam community! Our release managers usually follow this
https://beam.apache.org/contribute/release-guide/#10-vote-and-validate-release-candidate
to send the votes out and ask for any feedback regarding the release
candidate. If you could help run any validation on your side and cast your
vote, it would be greatly appreciated and helpful for the community.

On Mon, Aug 14, 2023 at 12:23 PM Hong <ho...@apache.org> wrote:

> I see, thanks for clarifying, Robert!
>
> Is there anything I can help with validation? Is there a wiki page with
> the expected validations I can help with?
>
> Best
> Hong
>
> On 14 Aug 2023, at 14:34, Robert Burke <ro...@frantil.com> wrote:
>
> 
> The release branch was cut. Before yhe weekend, I was working on getting
> the non-portable Dataflow Java worker built and available before producing
> the RC1. The actual building bit doesn't take that long, but there's a
> bunch of additional validation that goes along with it.
>
> The current target date for 2.50.0 is September 13th, but ultimately it's
> as soon as we have a validated and voted on RC.
>
> On Mon, Aug 14, 2023, 3:43 AM Hong Liang <hl...@gmail.com> wrote:
>
>> Thanks for driving this Robert!
>>
>> It seems the two PRs specified have been merged. A little new to Beam, do
>> we have an expected release date for the 2.50 release?
>>
>> Best,
>> Hong
>>
>> On Thu, Aug 10, 2023 at 3:08 AM Robert Burke <lo...@apache.org> wrote:
>>
>>> I'm in the process of producing the Cut branch, but due to various
>>> delays on my part, it will not be cut today.
>>>
>>> There are two outstanding PRs blocking the cut,
>>> https://github.com/apache/beam/pull/27947 and
>>> https://github.com/apache/beam/pull/27939, but once those are in, I'll
>>> proceed. Remaining new issues will be cherry picked as required.
>>>
>>> Thanks
>>> Robert Burke
>>> Beam 2.50.0 Release Manager
>>>
>>> On 2023/07/26 15:49:37 Robert Burke wrote:
>>> > Hey Beam community,
>>> >
>>> > The next release (2.50.0) branch cut is scheduled on August 9th, 2023,
>>> > according to
>>> > the release calendar [1].
>>> >
>>> > I volunteer to perform this release. My plan is to cut the branch on
>>> that
>>> > date, and cherrypick release-blocking fixes afterwards, if any.
>>> >
>>> > Please help me make sure the release goes smoothly by:
>>> > - Making sure that any unresolved release blocking issues for 2.50.0
>>> should
>>> > have their "Milestone" marked as "2.50.0 Release" as soon as possible.
>>> > - Reviewing the current release blockers [2] and remove the Milestone
>>> if
>>> > they don't meet the criteria at [3].
>>> >
>>> > Let me know if you have any comments/objections/questions.
>>> >
>>> > Thanks,
>>> >
>>> > Robert Burke (he/him)
>>> > Beam Go Busybody
>>> >
>>> > [1]
>>> >
>>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com
>>> > [2] https://github.com/apache/beam/milestone/14
>>> > [3] https://beam.apache.org/contribute/release-blocking/
>>> >
>>>
>>

Re: [PROPOSAL] Preparing for 2.50.0 Release

Posted by Hong <ho...@apache.org>.
I see, thanks for clarifying, Robert!

  

Is there anything I can help with validation? Is there a wiki page with the
expected validations I can help with?

  

Best

Hong

  

> On 14 Aug 2023, at 14:34, Robert Burke <ro...@frantil.com> wrote:  
>  
>

> 
>
> The release branch was cut. Before yhe weekend, I was working on getting the
> non-portable Dataflow Java worker built and available before producing the
> RC1. The actual building bit doesn't take that long, but there's a bunch of
> additional validation that goes along with it.
>
>  
>
>
> The current target date for 2.50.0 is September 13th, but ultimately it's as
> soon as we have a validated and voted on RC.  
>  
>
>
> On Mon, Aug 14, 2023, 3:43 AM Hong Liang
> <[hlteoh37@gmail.com](mailto:hlteoh37@gmail.com)> wrote:  
>
>

>> Thanks for driving this Robert!

>>

>>  
>
>>

>> It seems the two PRs specified have been merged. A little new to Beam, do
we have an expected release date for the 2.50 release?

>>

>>  
>
>>

>> Best,

>>

>> Hong

>>

>>  
>
>>

>> On Thu, Aug 10, 2023 at 3:08 AM Robert Burke
<[lostluck@apache.org](mailto:lostluck@apache.org)> wrote:  
>
>>

>>> I'm in the process of producing the Cut branch, but due to various delays
on my part, it will not be cut today.  
>  
>  There are two outstanding PRs blocking the cut,
> <https://github.com/apache/beam/pull/27947> and
> <https://github.com/apache/beam/pull/27939>, but once those are in, I'll
> proceed. Remaining new issues will be cherry picked as required.  
>  
>  Thanks  
>  Robert Burke  
>  Beam 2.50.0 Release Manager  
>  
>  On 2023/07/26 15:49:37 Robert Burke wrote:  
>  > Hey Beam community,  
>  >  
>  > The next release (2.50.0) branch cut is scheduled on August 9th, 2023,  
>  > according to  
>  > the release calendar [1].  
>  >  
>  > I volunteer to perform this release. My plan is to cut the branch on that  
>  > date, and cherrypick release-blocking fixes afterwards, if any.  
>  >  
>  > Please help me make sure the release goes smoothly by:  
>  > \- Making sure that any unresolved release blocking issues for 2.50.0
> should  
>  > have their "Milestone" marked as "2.50.0 Release" as soon as possible.  
>  > \- Reviewing the current release blockers [2] and remove the Milestone if  
>  > they don't meet the criteria at [3].  
>  >  
>  > Let me know if you have any comments/objections/questions.  
>  >  
>  > Thanks,  
>  >  
>  > Robert Burke (he/him)  
>  > Beam Go Busybody  
>  >  
>  > [1]  
>  >
> <https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com>  
>  > [2] <https://github.com/apache/beam/milestone/14>  
>  > [3] <https://beam.apache.org/contribute/release-blocking/>  
>  >  
>


Re: [PROPOSAL] Preparing for 2.50.0 Release

Posted by Robert Burke <ro...@frantil.com>.
The release branch was cut. Before yhe weekend, I was working on getting
the non-portable Dataflow Java worker built and available before producing
the RC1. The actual building bit doesn't take that long, but there's a
bunch of additional validation that goes along with it.

The current target date for 2.50.0 is September 13th, but ultimately it's
as soon as we have a validated and voted on RC.

On Mon, Aug 14, 2023, 3:43 AM Hong Liang <hl...@gmail.com> wrote:

> Thanks for driving this Robert!
>
> It seems the two PRs specified have been merged. A little new to Beam, do
> we have an expected release date for the 2.50 release?
>
> Best,
> Hong
>
> On Thu, Aug 10, 2023 at 3:08 AM Robert Burke <lo...@apache.org> wrote:
>
>> I'm in the process of producing the Cut branch, but due to various delays
>> on my part, it will not be cut today.
>>
>> There are two outstanding PRs blocking the cut,
>> https://github.com/apache/beam/pull/27947 and
>> https://github.com/apache/beam/pull/27939, but once those are in, I'll
>> proceed. Remaining new issues will be cherry picked as required.
>>
>> Thanks
>> Robert Burke
>> Beam 2.50.0 Release Manager
>>
>> On 2023/07/26 15:49:37 Robert Burke wrote:
>> > Hey Beam community,
>> >
>> > The next release (2.50.0) branch cut is scheduled on August 9th, 2023,
>> > according to
>> > the release calendar [1].
>> >
>> > I volunteer to perform this release. My plan is to cut the branch on
>> that
>> > date, and cherrypick release-blocking fixes afterwards, if any.
>> >
>> > Please help me make sure the release goes smoothly by:
>> > - Making sure that any unresolved release blocking issues for 2.50.0
>> should
>> > have their "Milestone" marked as "2.50.0 Release" as soon as possible.
>> > - Reviewing the current release blockers [2] and remove the Milestone if
>> > they don't meet the criteria at [3].
>> >
>> > Let me know if you have any comments/objections/questions.
>> >
>> > Thanks,
>> >
>> > Robert Burke (he/him)
>> > Beam Go Busybody
>> >
>> > [1]
>> >
>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com
>> > [2] https://github.com/apache/beam/milestone/14
>> > [3] https://beam.apache.org/contribute/release-blocking/
>> >
>>
>

Re: [PROPOSAL] Preparing for 2.50.0 Release

Posted by Hong Liang <hl...@gmail.com>.
Thanks for driving this Robert!

It seems the two PRs specified have been merged. A little new to Beam, do
we have an expected release date for the 2.50 release?

Best,
Hong

On Thu, Aug 10, 2023 at 3:08 AM Robert Burke <lo...@apache.org> wrote:

> I'm in the process of producing the Cut branch, but due to various delays
> on my part, it will not be cut today.
>
> There are two outstanding PRs blocking the cut,
> https://github.com/apache/beam/pull/27947 and
> https://github.com/apache/beam/pull/27939, but once those are in, I'll
> proceed. Remaining new issues will be cherry picked as required.
>
> Thanks
> Robert Burke
> Beam 2.50.0 Release Manager
>
> On 2023/07/26 15:49:37 Robert Burke wrote:
> > Hey Beam community,
> >
> > The next release (2.50.0) branch cut is scheduled on August 9th, 2023,
> > according to
> > the release calendar [1].
> >
> > I volunteer to perform this release. My plan is to cut the branch on that
> > date, and cherrypick release-blocking fixes afterwards, if any.
> >
> > Please help me make sure the release goes smoothly by:
> > - Making sure that any unresolved release blocking issues for 2.50.0
> should
> > have their "Milestone" marked as "2.50.0 Release" as soon as possible.
> > - Reviewing the current release blockers [2] and remove the Milestone if
> > they don't meet the criteria at [3].
> >
> > Let me know if you have any comments/objections/questions.
> >
> > Thanks,
> >
> > Robert Burke (he/him)
> > Beam Go Busybody
> >
> > [1]
> >
> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com
> > [2] https://github.com/apache/beam/milestone/14
> > [3] https://beam.apache.org/contribute/release-blocking/
> >
>

Re: [PROPOSAL] Preparing for 2.50.0 Release

Posted by Robert Burke <lo...@apache.org>.
I'm in the process of producing the Cut branch, but due to various delays on my part, it will not be cut today.

There are two outstanding PRs blocking the cut, https://github.com/apache/beam/pull/27947 and https://github.com/apache/beam/pull/27939, but once those are in, I'll proceed. Remaining new issues will be cherry picked as required.

Thanks
Robert Burke
Beam 2.50.0 Release Manager

On 2023/07/26 15:49:37 Robert Burke wrote:
> Hey Beam community,
> 
> The next release (2.50.0) branch cut is scheduled on August 9th, 2023,
> according to
> the release calendar [1].
> 
> I volunteer to perform this release. My plan is to cut the branch on that
> date, and cherrypick release-blocking fixes afterwards, if any.
> 
> Please help me make sure the release goes smoothly by:
> - Making sure that any unresolved release blocking issues for 2.50.0 should
> have their "Milestone" marked as "2.50.0 Release" as soon as possible.
> - Reviewing the current release blockers [2] and remove the Milestone if
> they don't meet the criteria at [3].
> 
> Let me know if you have any comments/objections/questions.
> 
> Thanks,
> 
> Robert Burke (he/him)
> Beam Go Busybody
> 
> [1]
> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com
> [2] https://github.com/apache/beam/milestone/14
> [3] https://beam.apache.org/contribute/release-blocking/
> 

Re: [PROPOSAL] Preparing for 2.50.0 Release

Posted by Ahmet Altay via dev <de...@beam.apache.org>.
Thank you!

On Wed, Jul 26, 2023 at 9:57 AM Kenneth Knowles <ke...@apache.org> wrote:

> Hooray!
>
> Thanks for volunteering
>
> Kenn
>
> On Wed, Jul 26, 2023 at 11:49 AM Robert Burke <lo...@apache.org> wrote:
>
>> Hey Beam community,
>>
>> The next release (2.50.0) branch cut is scheduled on August 9th, 2023,
>> according to
>> the release calendar [1].
>>
>> I volunteer to perform this release. My plan is to cut the branch on that
>> date, and cherrypick release-blocking fixes afterwards, if any.
>>
>> Please help me make sure the release goes smoothly by:
>> - Making sure that any unresolved release blocking issues for 2.50.0
>> should
>> have their "Milestone" marked as "2.50.0 Release" as soon as possible.
>> - Reviewing the current release blockers [2] and remove the Milestone if
>> they don't meet the criteria at [3].
>>
>> Let me know if you have any comments/objections/questions.
>>
>> Thanks,
>>
>> Robert Burke (he/him)
>> Beam Go Busybody
>>
>> [1]
>>
>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com
>> [2] https://github.com/apache/beam/milestone/14
>> [3] https://beam.apache.org/contribute/release-blocking/
>>
>

Re: [PROPOSAL] Preparing for 2.50.0 Release

Posted by Kenneth Knowles <ke...@apache.org>.
Hooray!

Thanks for volunteering

Kenn

On Wed, Jul 26, 2023 at 11:49 AM Robert Burke <lo...@apache.org> wrote:

> Hey Beam community,
>
> The next release (2.50.0) branch cut is scheduled on August 9th, 2023,
> according to
> the release calendar [1].
>
> I volunteer to perform this release. My plan is to cut the branch on that
> date, and cherrypick release-blocking fixes afterwards, if any.
>
> Please help me make sure the release goes smoothly by:
> - Making sure that any unresolved release blocking issues for 2.50.0 should
> have their "Milestone" marked as "2.50.0 Release" as soon as possible.
> - Reviewing the current release blockers [2] and remove the Milestone if
> they don't meet the criteria at [3].
>
> Let me know if you have any comments/objections/questions.
>
> Thanks,
>
> Robert Burke (he/him)
> Beam Go Busybody
>
> [1]
>
> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com
> [2] https://github.com/apache/beam/milestone/14
> [3] https://beam.apache.org/contribute/release-blocking/
>