You are viewing a plain text version of this content. The canonical link for it is here.
Posted to notifications@yetus.apache.org by "Allen Wittenauer (Jira)" <ji...@apache.org> on 2021/10/26 16:20:00 UTC

[jira] [Updated] (YETUS-1107) calcdiffs of cc raise false positive warnings

     [ https://issues.apache.org/jira/browse/YETUS-1107?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Allen Wittenauer updated YETUS-1107:
------------------------------------
    Component/s: Precommit

> calcdiffs of cc raise false positive warnings
> ---------------------------------------------
>
>                 Key: YETUS-1107
>                 URL: https://issues.apache.org/jira/browse/YETUS-1107
>             Project: Yetus
>          Issue Type: Bug
>          Components: Precommit
>            Reporter: Masatake Iwasaki
>            Assignee: Masatake Iwasaki
>            Priority: Major
>             Fix For: 0.14.0
>
>          Time Spent: 1h 20m
>  Remaining Estimate: 0h
>
> test-patch of Hadoop project always cast -1 on cc due to warnings not related to the patch.
> {{23 new}} and {{23 fixed}} are pointing the the same warnings (not related to the patch) in the following example.
> {noformat}
> root-jdkPrivateBuild-1.8.0_282-8u282-b08-0ubuntu120.04-b08 with JDK Private Build-1.8.0_282-8u282-b08-0ubuntu120.04-b08 generated 23 new + 304 unchanged - 23 fixed = 327 total (was 327)
> {noformat}



--
This message was sent by Atlassian Jira
(v8.3.4#803005)