You are viewing a plain text version of this content. The canonical link for it is here.
Posted to yarn-dev@hadoop.apache.org by "Weiwei Yang (JIRA)" <ji...@apache.org> on 2018/04/26 06:06:00 UTC
[jira] [Created] (YARN-8212) Pending backlog for async allocation
threads should be configurable
Weiwei Yang created YARN-8212:
---------------------------------
Summary: Pending backlog for async allocation threads should be configurable
Key: YARN-8212
URL: https://issues.apache.org/jira/browse/YARN-8212
Project: Hadoop YARN
Issue Type: Sub-task
Reporter: Weiwei Yang
During the perf testing, we found that when we scale up to 20k nodes, the backlog size is often fullĀ and cause allocation threads to wait. Hence, it's better to make this configurable so user can tune the perf with respect to different size of nodes.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)
---------------------------------------------------------------------
To unsubscribe, e-mail: yarn-dev-unsubscribe@hadoop.apache.org
For additional commands, e-mail: yarn-dev-help@hadoop.apache.org