You are viewing a plain text version of this content. The canonical link for it is here.
Posted to yarn-issues@hadoop.apache.org by "Andrey Stepachev (JIRA)" <ji...@apache.org> on 2014/06/11 14:41:02 UTC
[jira] [Updated] (YARN-2145) FairScheduler can assign more
resources to queue with MaxShare set.
[ https://issues.apache.org/jira/browse/YARN-2145?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Andrey Stepachev updated YARN-2145:
-----------------------------------
Attachment: YARN-2145.diff
> FairScheduler can assign more resources to queue with MaxShare set.
> -------------------------------------------------------------------
>
> Key: YARN-2145
> URL: https://issues.apache.org/jira/browse/YARN-2145
> Project: Hadoop YARN
> Issue Type: Bug
> Components: fairscheduler
> Affects Versions: 2.5.0
> Reporter: Andrey Stepachev
> Attachments: YARN-2145.diff
>
>
> method fair.FSQueue#assignContainerPreCheck() uses Resources.fitsIn incorrectly, because if queue is at it maximum method returns true and container can be assigned to queue with maximum resources consumed.
> That is because fetsIn code do <= comparison and if allocated resources == max resources fitsIn still returns true, and consequently pre check successes and node have been assigned to overloaded queue.
> {code}
> public static boolean fitsIn(Resource smaller, Resource bigger) {
> return smaller.getMemory() <= bigger.getMemory() &&
> smaller.getVirtualCores() <= bigger.getVirtualCores();
> }
> {code}
--
This message was sent by Atlassian JIRA
(v6.2#6252)