You are viewing a plain text version of this content. The canonical link for it is here.
Posted to oak-issues@jackrabbit.apache.org by "Amit Jain (JIRA)" <ji...@apache.org> on 2015/10/01 05:36:13 UTC
[jira] [Closed] (OAK-3461) Run m-bundle-p:baseline before
integration tests
[ https://issues.apache.org/jira/browse/OAK-3461?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Amit Jain closed OAK-3461.
--------------------------
Bulk close for 1.3.7
> Run m-bundle-p:baseline before integration tests
> ------------------------------------------------
>
> Key: OAK-3461
> URL: https://issues.apache.org/jira/browse/OAK-3461
> Project: Jackrabbit Oak
> Issue Type: Improvement
> Components: parent
> Reporter: Francesco Mari
> Assignee: Francesco Mari
> Fix For: 1.3.7
>
>
> The baseline goal of the maven-bundle-plugin is currently bound to the verify phase (as per default). It should be bound to the pre-integration-test phase to give it a possibility to fail before integration tests are executed.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)