You are viewing a plain text version of this content. The canonical link for it is here.
Posted to notifications@asterixdb.apache.org by "Murtadha Hubail (JIRA)" <ji...@apache.org> on 2018/01/27 02:24:02 UTC
[jira] [Updated] (ASTERIXDB-2269) All active nodes are included in
job resources calculation
[ https://issues.apache.org/jira/browse/ASTERIXDB-2269?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Murtadha Hubail updated ASTERIXDB-2269:
---------------------------------------
Component/s: RT - Runtime
> All active nodes are included in job resources calculation
> ----------------------------------------------------------
>
> Key: ASTERIXDB-2269
> URL: https://issues.apache.org/jira/browse/ASTERIXDB-2269
> Project: Apache AsterixDB
> Issue Type: Bug
> Components: RT - Runtime
> Reporter: Murtadha Hubail
> Assignee: Murtadha Hubail
> Priority: Major
>
> Currently, when a query comes, all active nodes are assumed to be participants in the query execution and therefore the query required resources is calculated accordingly. However, this isn't the case when a dataset is partitioned in a node group that doesn't include all nodes (e.g. the metadata datasets). This will result in an overestimation in resources required and will cause the query to fail with (HYR0009: Job requirement exceeds capacity) when one of the none participating nodes leaves the cluster when it shouldn't fail.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)