You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Matthias Pohl (Jira)" <ji...@apache.org> on 2026/07/29 12:45:00 UTC

[jira] [Updated] (FLINK-40010) RescaleTimelineITCase.testRescaleTerminatedByNoResourcesOrNoParallelismsChange is flaky: requirements-update can miss the in-progress rescale

     [ https://issues.apache.org/jira/browse/FLINK-40010?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Matthias Pohl updated FLINK-40010:
----------------------------------
    Fix Version/s: 2.3.1

> RescaleTimelineITCase.testRescaleTerminatedByNoResourcesOrNoParallelismsChange is flaky: requirements-update can miss the in-progress rescale
> ---------------------------------------------------------------------------------------------------------------------------------------------
>
>                 Key: FLINK-40010
>                 URL: https://issues.apache.org/jira/browse/FLINK-40010
>             Project: Flink
>          Issue Type: Bug
>          Components: Runtime / Coordination, Tests
>    Affects Versions: 2.4.0
>            Reporter: Martijn Visser
>            Assignee: Martijn Visser
>            Priority: Major
>             Fix For: 2.3.1, 2.4.0
>
>
> testRescaleTerminatedByNoResourcesOrNoParallelismsChange fails on CI: the awaited
> terminal reason NO_RESOURCES_OR_PARALLELISMS_CHANGE is never recorded, so the wait times out (or, before https://issues.apache.org/jira/browse/FLINK-40009, hangs).
> https://dev.azure.com/apache-flink/apache-flink/_build/results?buildId=76350&view=results (leg: test_cron_azure core)
> https://dev.azure.com/apache-flink/apache-flink/_build/results?buildId=76242&view=results (leg: test_cron_jdk11 core)
> Root cause: NO_RESOURCES_OR_PARALLELISMS_CHANGE is stamped by
> DefaultStateTransitionManager only on the rescale tracked when the manager
> (re-)enters its Idling phase. With the short shared cooldown, the cooldown can elapse
> and the manager can reach Idling before the requirements-update RPC is processed, so the UPDATE_REQUIREMENT rescale is created after Idling was entered and never receives the terminal reason; it stays in-progress until teardown cancels it (JOB_CANCELED).
> Fix: rebuild the fixture cluster with a cooldown (10s) that comfortably outlasts the
> synchronous update RPC, so the update is processed in Cooldown and routed back through Idling where the reason is stamped. Unlike testRescaleTerminatedByResourceRequirementsUpdated (FLINK-39903), this case must wait out the whole cooldown before the condition can be met, so the cooldown is kept modest (10s) and the wait budget is widened to 60s.
> Related: FLINK-39902, FLINK-39903 (sibling races in the same class).



--
This message was sent by Atlassian Jira
(v8.20.10#820010)