You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hbase.apache.org by "Matteo Bertozzi (JIRA)" <ji...@apache.org> on 2015/04/09 23:07:13 UTC
[jira] [Updated] (HBASE-13290) Procedure v2 - client enable/disable
table sync
[ https://issues.apache.org/jira/browse/HBASE-13290?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Matteo Bertozzi updated HBASE-13290:
------------------------------------
Attachment: HBASE-13290-v2.patch
> Procedure v2 - client enable/disable table sync
> -----------------------------------------------
>
> Key: HBASE-13290
> URL: https://issues.apache.org/jira/browse/HBASE-13290
> Project: HBase
> Issue Type: Sub-task
> Components: Client
> Affects Versions: 2.0.0, 1.1.0
> Reporter: Stephen Yuan Jiang
> Assignee: Stephen Yuan Jiang
> Attachments: EnableDisableTableClientPV2-draft.v0-master.patch, HBASE-13290-v2.patch
>
> Original Estimate: 120h
> Time Spent: 48h
> Remaining Estimate: 72h
>
> client side, part of HBASE-12439/HBASE-13211
> it uses the new procedure code to be know when the procedure is completed, and have a proper sync/async behavior on enable/disable table.
> For 1.1, It has to be binary compatible (1.0 client can talk to 1.1 server && 1.1 client can talk to 1.0 server). Binary compatible is TBD for 2.0.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)