You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@vcl.apache.org by "ASF subversion and git services (JIRA)" <ji...@apache.org> on 2014/11/21 20:57:34 UTC

[jira] [Commented] (VCL-308) Computer load log does not account for images that have to be transferred to another management node

    [ https://issues.apache.org/jira/browse/VCL-308?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14221343#comment-14221343 ] 

ASF subversion and git services commented on VCL-308:
-----------------------------------------------------

Commit 1640986 from [~fapeeler] in branch 'vcl/trunk'
[ https://svn.apache.org/r1640986 ]

VCL-308
inserted loadlog entry for image copy

VCL-568
added loadstatenames for frontend to montior connect for refresh

VCL-758
removed check/restriction for connecttimeout. Previously it would not allow less than 10min. Now can allow down to 1 min

VCL-799
update_cluster, changed routine name in reserved

> Computer load log does not account for images that have to be transferred to another management node
> ----------------------------------------------------------------------------------------------------
>
>                 Key: VCL-308
>                 URL: https://issues.apache.org/jira/browse/VCL-308
>             Project: VCL
>          Issue Type: Bug
>          Components: vcld (backend)
>    Affects Versions: 2.0
>            Reporter: Andy Kurth
>             Fix For: 2.4
>
>
> The estimated time remaining displayed to the user does not include the time it takes to retrieve image files from another managment node during image load.  If the scheduling system thinks the image is preloaded but is not and image retrieval is required, "Est: 1 min remaining" is displayed.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)